Performed field calculations to complete assessments.
Gathered, organized and modeled data for reports and presentations.
Collaborated with engineers, architects, and construction professionals to ensure accurate information was incorporated into designs.
Utilized GPS technology for efficient data collection, expediting the completion of fieldwork assignments.
build ailments,modeling files for gps dozer,site calibration,u
Used Trimble and Business Center to create detailed maps from raw field data.upload dozer files, upload data collector files,volume reports,cut &fill maps,final as-built drawings
LEAD SURVEYOR
Walsh Construction
01.2006 - 06.2023
Penndot SR981 realignment
Pa Turnpike Southern Beltway SR 79 interchange
Penndot Rapid bridge project
Penndot I-95 CP 2 road construction
SR 65 Marshall interchange
Penn Dot Squirrel Hill Tunnel
PPL Holtwood Redevelopment Holtwood,PA
Mon/Fayette Expressway Section 51A2 Uniontown, PA
West Kittanning Bridge Kittanning PA
Mon/Fayette Expressway Section 51A1 Uniontown,PA
PARTY CHIEF
Balfour&Beatty
01.2004 - 01.2006
MD -450 Grade separation project New construction on SR-222
Completed sink bridge-corridor H I-78 reconstruction
Completed SR-60 in Annsville, WV {hot nails CMI pins and levels}
MASSEUR ( ONE SPA WORLD ) at MV- COSTA DELIZIOSA, COSTA DIADEMA, COSTA FAVOLOSAMASSEUR ( ONE SPA WORLD ) at MV- COSTA DELIZIOSA, COSTA DIADEMA, COSTA FAVOLOSA