Summary
Overview
Work History
Education
Skills
Timeline
Generic

PEYTON HAMMOCK

Milton,USA

Summary

Pipe Welder/Fitter with 9+ years of experience in fabricating and installing piping systems according to blueprints and project specifications with a strong commitment to safety and efficiency in all projects. Currently seeking to transition into a management role, where I can apply my field experience to project coordination, scheduling, and team support while continuing to grow in construction.

Overview

1
1
year of post-secondary education
9
9
years of professional experience

Work History

Pipe welder/Fitter

Nash Plumbing and Mechanical
Panama City, FL
02.2024 - Current
  • Fabricated piping systems in accordance with project blueprints and specifications.
  • Planned work based off blueprints and drawings to ensure piping systems were built to spec.
  • Installed chillers, heat exchangers, air handlers, and boilers, ensuring safety compliance and adherence to project timelines.
  • Coordinated work with other trades, facilitating on-schedule task completion.
  • Executed preventative maintenance on tools and equipment, minimizing potential downtime.

Foreman/pipe welder

Air Design Systems Inc.
Pensacola, FL
06.2023 - 02.2024
  • Performed maintenance checks on tools and equipment, ensuring reliability and readiness for projects.
  • Fabricated piping assemblies to meet project requirements and quality standards.
  • Interpreted blueprints and technical drawings to guide accurate pipe installations.
  • Installed and dismantled equipment such as chillers, boilers, heat exchangers, and air handlers, adhering to project timelines.
  • Operated heavy equipment to facilitate material movement on job sites. including lull, forklifts, skid steer, and excavators for material movement and site operations.
  • Trained new employees and collaborated with management to clarify expectations and job requirements.

Pipe fitter

McDonald Construction Services
Shalimar, FL
10.2022 - 06.2023
  • Fabricated piping systems by following blueprints, ensuring project specifications were met and minimizing rework.
  • Performed comprehensive fitting, bolt-up, and pressure testing on pipe systems to validate leak-free operation and uphold system integrity.
  • Executed the installation and removal of chillers, boilers, heat exchangers, and air handlers, while maintaining documented safety compliance.
  • Performed material take offs and coordinated with management on job requirements.
  • Operated forklifts, lull, skid steers, and excavators to position materials effectively, improving workflow on construction site.

Pipe welder

Nash Plumbing and Mechanical
Pensacola
09.2017 - 10.2022
  • Maintained welding equipment and tools to ensure continuous operation.
  • Installed equipment such as chillers, boilers, heat exchangers and air handlers
  • Operated heavy machinery for material handling and site preparation to facilitate project execution.

Education

Welding -

PSC Century Campus
Century
08.2016 - 05.2017

HIGH SCHOOL DIPLOMA -

Tate High School
Cantonment

Skills

  • Pipe fabrication
  • Safety mindset
  • Teamwork
  • Team management
  • Leadership
  • Conflict resolution

Timeline

Pipe welder/Fitter

Nash Plumbing and Mechanical
02.2024 - Current

Foreman/pipe welder

Air Design Systems Inc.
06.2023 - 02.2024

Pipe fitter

McDonald Construction Services
10.2022 - 06.2023

Pipe welder

Nash Plumbing and Mechanical
09.2017 - 10.2022

Welding -

PSC Century Campus
08.2016 - 05.2017

HIGH SCHOOL DIPLOMA -

Tate High School
PEYTON HAMMOCK