Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Phillip King

Call,Texas

Summary

Seasoned Boilermaker bringing demonstrated safety management and performance optimization skills gained during experience in industrial settings. Deliver in-depth training and mentoring to help each improve abilities and advance work quality. Dependable, hardworking and level-headed in addressing diverse problems. Accomplished Boilermaker with more than 10 years handling refractory repair and boiler manhole installations. Certified by the National Center for Construction Education and Research. Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.

Overview

9
9
years of professional experience
1
1
Certification

Work History

Plumber Foreman

McManus Plumbing
08.2022 - Current
  • Repaired plumbing systems, components and equipment.
  • Appropriately fitted pipes by identifying dimensions, sizes and shapes needed to replace faulty pipes.
  • Installed valves, hangers, supports and flanges inside piping systems.
  • Measured, threaded and cut materials to correct angles.
  • Independently worked on projects, while offering process coordination and cooperation with other teams.
  • Implemented maintenance and repair for fixtures, water mains, natural gas, fire systems, and backflow preventers.
  • Selected type and size of piping required for each project.
  • Eliminated risks by correctly identifying potential safety hazards.
  • Complied with state plumbing codes throughout duration of each project.
  • Filled pipe systems with water and air to determine location of leaks.
  • Read blueprints to determine appropriate materials and procedures for each project.
  • Prepared detailed records of all project tasks from start to finish.
  • Interpreted blueprints to determine locations, quantities and sizes of materials required.
  • Offered guidance and training to junior team members.
  • Communicated with customers to provide recommendations on repairs, determine project estimation costs and define project completion dates.
  • Completed preventive maintenance on water heaters, toilets, urinals and plumbing fixtures.
  • Cut openings in structures to accommodate pipes and pipe fittings with [Tool] and [Tool].
  • Requisitioned tools and equipment to select type and size of pipes needed for projects.
  • Expanded trade knowledge by networking with colleagues and participating in courses and seminars.

Boilermaker Foreman

Turner Industries
05.2022 - 08.2022
  • Maintained compliance with all safety procedures from both client and employer.
  • Interpreted blueprints, sketches and specifications for each job.
  • Used hand signals to notify crane operator to lift components to specific positions.
  • Identified issues and addressed each immediately with job foreman.
  • Measured old structural parts or assemblies to determine dimensional requirements of replacements parts.
  • Dismantled equipment or devices to gain access and remove defective parts or components.
  • Repair leaks by tightening or replacing bolts and gaskets.

Boilermaker

Universal Plant Services
04.2022 - 05.2022
  • Maintained compliance with all safety procedures from both client and employer.
  • Measured old structural parts or assemblies to determine dimensional requirements of replacements parts.
  • Inspected equipment, structures and materials to identify cause of errors.
  • Used hand signals to notify crane operator to lift components to specific positions.
  • Identified issues and addressed each immediately with job foreman.
  • Interpreted blueprints, sketches and specifications for each job.
  • Dismantled equipment or devices to gain access and remove defective parts or components.
  • Inspected and lubricated valves; removed, replaced or installed components to correct operating deficiencies.
  • Cleaned and maintained boilers and associated equipment to increase efficiency and performance level.
  • Coordinated movement of materials and equipment to job sites.
  • Assembled and analyzed boilers for defects.
  • Built and repaired process tanks, storage tanks and water treatment tanks.

Boilermaker

Ohmstede Industrial Services
02.2022 - 04.2022
  • Maintained compliance with all safety procedures from both client and employer.
  • Measured old structural parts or assemblies to determine dimensional requirements of replacements parts.
  • Inspected equipment, structures and materials to identify cause of errors.
  • Used hand signals to notify crane operator to lift components to specific positions.
  • Identified issues and addressed each immediately with job foreman.
  • Interpreted blueprints, sketches and specifications for each job.
  • Dismantled equipment or devices to gain access and remove defective parts or components.
  • Inspected and lubricated valves; removed, replaced or installed components to correct operating deficiencies.

Boilermaker Foreman

Echo Maintenance
01.2022 - 02.2022
  • Maintained compliance with all safety procedures from both client and employer.
  • Interpreted blueprints, sketches and specifications for each job.
  • Used hand signals to notify crane operator to lift components to specific positions.
  • Identified issues and addressed each immediately with job foreman.
  • Inspected equipment, structures and materials to identify cause of errors.
  • Measured old structural parts or assemblies to determine dimensional requirements of replacements parts.
  • Dismantled equipment or devices to gain access and remove defective parts or components.
  • Inspected and lubricated valves; removed, replaced or installed components to correct operating deficiencies.

Plumber Foreman

McManus Plumbing
01.2021 - 01.2022
  • Repaired plumbing systems, components and equipment.
  • Appropriately fitted pipes by identifying dimensions, sizes and shapes needed to replace faulty pipes.
  • Installed valves, hangers, supports and flanges inside piping systems.
  • Measured, threaded and cut materials to correct angles.
  • Independently worked on projects, while offering process coordination and cooperation with other teams.
  • Implemented maintenance and repair for fixtures, water mains, natural gas, fire systems, and backflow preventers.
  • Selected type and size of piping required for each project.
  • Eliminated risks by correctly identifying potential safety hazards.
  • Complied with state plumbing codes throughout duration of each project.
  • Filled pipe systems with water and air to determine location of leaks.
  • Prepared detailed records of all project tasks from start to finish.
  • Interpreted blueprints to determine locations, quantities and sizes of materials required.
  • Offered guidance and training to junior team members.
  • Communicated with customers to provide recommendations on repairs, determine project estimation costs and define project completion dates.
  • Trained and supervised all incoming employees.
  • Inspected sewers and piping systems to assess quality and condition.
  • Provided emergency services to install and repair toilets, water heaters, appliances and showers to maintain customer satisfaction ratings.

Boilermaker Foreman

Echo Maintenance
10.2020 - 01.2021
  • Maintained compliance with all safety procedures from both client and employer.
  • Interpreted blueprints, sketches and specifications for each job.
  • Used hand signals to notify crane operator to lift components to specific positions.
  • Identified issues and addressed each immediately with job foreman.
  • Inspected equipment, structures and materials to identify cause of errors.
  • Measured old structural parts or assemblies to determine dimensional requirements of replacements parts.
  • Dismantled equipment or devices to gain access and remove defective parts or components.

Night Shift Foreman

Echo Maintenance
01.2016 - 10.2020
  • Supervised ongoing daily production phases.
  • Located and resolved problems with team production and performance to maintain consistent quality levels.
  • Collaborated with other leaders and executives to direct workflow and support operations.
  • Kept accurate and detailed records of personnel progress and productivity.
  • Monitored daily and weekly key performance indicators to maintain on-track status.
  • Planned, organized and monitored resources to deliver efficient use of labor, equipment and materials.
  • Implemented policies and standard operating procedures for continuous improvement.
  • Managed staff hiring, training, and supervision.
  • Cultivated professional working relationships with peers and supervisors.
  • Reviewed and assessed ongoing operations, developing initiatives for continuous process improvement.
  • Created and implemented strategies for improving operational efficiency and accuracy.

Education

High School Diploma -

Jasper High School
Jasper, TX
05.2005

Skills

  • Work Estimation
  • Tool and Equipment Maintenance
  • Project Requirements
  • Skilled Maintenance and Repair
  • Project Deadlines
  • Worker Training
  • Job Prioritizing
  • Safe Work Practices
  • Hand and Power Tool Operation
  • Repair Requirements Determination

Certification

NCCER


Timeline

Plumber Foreman

McManus Plumbing
08.2022 - Current

Boilermaker Foreman

Turner Industries
05.2022 - 08.2022

Boilermaker

Universal Plant Services
04.2022 - 05.2022

Boilermaker

Ohmstede Industrial Services
02.2022 - 04.2022

Boilermaker Foreman

Echo Maintenance
01.2022 - 02.2022

Plumber Foreman

McManus Plumbing
01.2021 - 01.2022

Boilermaker Foreman

Echo Maintenance
10.2020 - 01.2021

Night Shift Foreman

Echo Maintenance
01.2016 - 10.2020

High School Diploma -

Jasper High School

NCCER


Phillip King