Nuclear Monitoring Technician focused on worker wellness and safety. Driven to foster safe environment by monitoring radiation exposure times and prescribed safe levels of radiation. Proficient in educating personnel in radiation safety procedures, including protective clothing and equipment use. Enthusiastic eager to contribute to team success through hard work, attention to detail and excellent organizational skills.
Rx Head Nozzles and Grids replacement
Conducted routine survey, brief the workers on
Continue high risk job coverage while removed thimble tubes out of RX Head core barrel.
baffle bolts
Working Outage at Wolf Creek Power Station provide job coverage for the Reactor vessel water peening project. Take dose rates and contaminations survey on the robots and equipments that going under the reactor head. Collected air samples to determine if respiratory required, keep workers inform on radiological levels and conditions. Briefed workers on radiation levels in work areas and required precautions.
Worked outage at plant Palisades Nuclear Power Station and Waterford Power Plant, duties included Initial containment (ctmt) survey, Briefed workers on radiation levels in work areas and required precautions. Job coverage in the HRA And HCA at the RCP, Steam Generator platforms.
Grand Gulf Power Station and Peach Bottom Nuclear Plant
My Work station was at turbine deck, Condensate Bay, performed Initial down post survey, provide job coverage, and high risk job coverage and routines survey. Overhead scaffold survey prior use,
Set up HEPA vacuums, contamination areas, set up air samples, survey scaffolds prior workers used. RP continues job coverage for maintenance when changing actuator, and valve separator. Down posted feedwater pumps from contaminated to non-contaminated, RP support while replace Bypass valves, and valve packing.
I worked outages at those following Plants: North Anna Power Station, Milestones Nuclear Power Plant, Hatch Power Station.
Duties included: Instruments source check using Sherperd calibration, for Ion Chambers,, RO-20- 9-4 , G, AMP50 4100. Survey tools and equipment coming out containment building, perform daily and weekly contamination and dose rate surveys. Take air sample for noble gas, particulate, radioidine, and trillium. Take dose rate survey for radiography RT shots.
Initial containment entry down posted, RP containment rover, control tools and equipment that going out of equipment hatch. Routine survey, scaffold survey, daily source check instruments ion chambers, telepoles, amp 50, amp100, L-177 frisker. Continue RP coverage during resin transfer sluice. RP coverage while valve tech workers breach valves. RP Support at the cavity refuel floor smears and dose rate tools out the cavity water.
I worked outages at those following Plants: Indian Point Power Station, Grand-Gulf Power Plant , Milestone Nuclear Plant.
Smears tools and equipments that came out the Radiation Control Area (RCA) set up hepa vacuum for job breach. Locked High Radiation guard, perform routine general surveys , instruments daily source check.
worked at those following Plants: Indian Point, Turkey Point Power Plant. I was Assign to the refuel floor, decon tools and equipment as come out from the reactor cavity ,CTMT decon rover, installed drip catch, set up HEPA vacuum, build ballpin, decon tools and equipment as they coming out from the equipment hatch.
Radiography boundary guard, Alara shielding install and removed lead, mop and Maslin refuel floor building, cavity decon.
I worked at those following Plants: St lucie, Limerick, Kewaunee, surry, North Anna, Parlo Verde, Duane Arnold, River Bend Nuclear Power Plants.
Meter qualified, dose rated bags and tools, support RP at the equipment hatch, decon tools and equipment that's going out of containment. Perform cavity decon, build hot particles ballpin, installed and removed lead for ALARA shielding. Change trash , decon support RP at the . Cleaned boric acid on plant components at different locations. Decon cables, tools that came out the reactor cavity pool in the fuel building .
Worked at Turkey Point and St Lucie Power Plant.
Supported and helped different work groups including , electricians, carpenters, pipefitters etc. confined space monitor, FME monitor, firewatch. Loaded, unloaded and moved material to and from storage and production areas, used all type power tools , excavation, pour concrete, sweep and mop floor transported heavy materials using tugs, hand trucks and pallet jacks throughout work zone.
I have been in the nuclear power plant industries for 17 years from Laborer to Sr RP Tech
NUF exam, Fully Sr RP qualified, Osha 8 training card, Multitasking abilities, Adaptability, Excellent work ethic