Dynamic Operations & Supply Chain Leader with a proven track record in P&L management and strategic planning. Expert in continuous improvement and lean techniques. Adept at mentoring diverse teams, driving business growth through effective collaboration and innovative problem-solving.
Overview
15
15
years of professional experience
Work History
Operations Manager - International
Communications Test Design, Inc. (CTDI)
08.2024 - Current
Responsible for P&L performance of international sites - operations, budgeting and business improvement.
Lead operational initiatives (REV, GM, NIAT growth, BOH reduction) leading to P&L performance.
Oversee, develop and execute strategic plans to drive business growth and profitability.
Lead, mentor, and manage a diverse team of regional managers, and employees across multiple countries.
Establish and enforce operational KPIs to ensure SLAs, and customer expectations are achieved or exceeded.
Collaborate cross-functionally with IT, HR, finance, engineering, etc. to support international operations.
Established analytical techniques to achieve higher GM% on MPS programs involving auction bidding.
Implement continuous improvement initiatives to optimize processes, reduce costs, and enhance service.
Lead QBR and sales opportunities with customers for continuous improvement and sustaining business growth.
Lead monthly P&L performance reviews on each site after closing and identify gaps for opportunities.
Operations & Supply Chain Leader
ABB, Inc.
08.2018 - 08.2024
Manage production and planning of field and level instrumentation departments of union employees.
Lead tier meetings to ensure KPIs such as Safety, Quality, Delivery and Cost are on target.
Lead S&OP meetings/process to ensure MPS is accurate to meet OTD and project deliveries.
Forecast (long & short term), analyze demand, manage ROP, Safety Stock, and other master data (SAP).
Increased OTD from ~50% to ~90% for field & level products using lean & MRP strategies.
Reduced staffing by 50% with maintaining efficiency by implementing a U-shaped cell layout.
Lead VSM activity to improve routings and increased utilization up to 75% by creating product-labor matrix.
Implemented 2 bin inventory control systems (Kaizen) as visual indicators for quick replenishments of parts.
Implemented 2D barcode system (Poka-Yoke strategy) for tagging process to avoid human errors.
Coach/develop, provide feedback and address issues of employees, to ensure true engagement within the team.
Manage Repairs/Returns, including quoting, and reduced repair turnaround LT from 3-4 to 1-2 wks.
Production Scheduler
Thales (Ex-Gemalto, Inc.)
03.2014 - 07.2018
Manage the detailed planning, scheduling & production of smartcards production up to 12 mn/month.
Direct Production Supervisors in resource allocation & capacity planning to execute daily schedule.
Implemented PULL and Level Loading strategy in production lines to increase throughput and reduce WIP.
Implementing the Vault Storage System for storing WIP of semi-finished smartcards up to 9 million.
Direct & train the kitting team to provide materials to production as per the scheduled orders.
Collaborate with Planning, Sales, Shipping and Production to achieve shipments and increase productivity.
Manage the WIP flow and material storage using lean techniques like KANBAN, 5S and visual management.
Manage the overproduction daily to avoid risk of obsolete inventory & discrepancy.
Production Control Planner
Meopta U.S.A., Inc.
09.2013 - 03.2014
Managed monthly production plan based on customer forecast, internal forecast capacity and components.
Generated daily reports of production overview, factory late orders, current revenue and on hand inventory.
Supervised 20 employees for production of final assembly & sub-assemblies of riflescopes.
Analyzed and reviewed Bill of Material against actual usage to ensure accuracy of safety stock and stock levels.
Analyzed the capacity of the work centers and created routes for different product types and orders.
Instituted a Kanban system and Cycle Count & utilize MRP to ensure continual WIP inventory accuracy.
Implemented kitting process to reduce the scrap of the components and increase material visibility.
Analyzed material usage, scrap and apply lean techniques to maintain high production efficiency.
Created reports detailing material usage, inventory levels and cost savings initiatives.
Supervisor/Graduate Student Research Assistant
Assessment & Testing At OSU
01.2012 - 09.2013
Conducted Research Project - OSU Graduate/Undergraduate Alumni Survey
Recruit, train and supervise the call centre staff as well as analyze progress of surveys
Implement test security procedures, identify and review security issues in test storage and administration.
Graduate Teaching Assistant
Industrial Engineering & Management At OSU
07.2012 - 11.2012
Instructed Microsoft Excel/Visual Basic for Applications to freshman, sophomore and junior students
Composed & grade assignments, quizzes, projects, conduct help sessions.
Manufacturing Engineering Intern
Godrej & Boyce Mfg Ltd
10.2010 - 05.2011
Managed the release, control, and follow-up of assigned shop floor work orders from creation to shipment
Support MPS and monitor inventory levels & production schedules to achieve inventory targets and efficiencies
Instituted a Kanban system and Cycle Count & utilize MRP to ensure continual WIP inventory accuracy
Reduced labour by 40% using SPC, Time/Motion Study analysis, Setup time reduction techniques
Reduced floor space utilization by 35% by establishing a cellular layout using VSM & other Lean Techniques
Lead Kaizen Events & Supervised 40 employees in implementing Lean techniques.
Earned 'Kaizen of the Month' Award for Censafe department for ensuring safety.
Education
Master of Science - Industrial Engineering & Management
Oklahoma State University
Stillwater, OK
05.2013
Bachelor of Science - Production Engineering
Fr. Conceicao Rodrigues College of Engineering
Mumbai, MH, India
06.2011
Skills
SAP, QAD, MS Dynamics, JDE
Production Management
Continuous Improvement
Supply Chain Management
Project Management
Strategic Planning
Quality Control
P&L Management
Timeline
Operations Manager - International
Communications Test Design, Inc. (CTDI)
08.2024 - Current
Operations & Supply Chain Leader
ABB, Inc.
08.2018 - 08.2024
Production Scheduler
Thales (Ex-Gemalto, Inc.)
03.2014 - 07.2018
Production Control Planner
Meopta U.S.A., Inc.
09.2013 - 03.2014
Graduate Teaching Assistant
Industrial Engineering & Management At OSU
07.2012 - 11.2012
Supervisor/Graduate Student Research Assistant
Assessment & Testing At OSU
01.2012 - 09.2013
Manufacturing Engineering Intern
Godrej & Boyce Mfg Ltd
10.2010 - 05.2011
Master of Science - Industrial Engineering & Management
Technician (Quality Checker) at Communications Test Design Inc. (CTDI) TullamarineTechnician (Quality Checker) at Communications Test Design Inc. (CTDI) Tullamarine