Summary

Dedicated Carpenter Foreman with extensive experience in concrete pouring and crane signaling. Known for implementing effective safety measures and mentoring team members for optimal project outcomes.

Overview

9
9
years of professional experience

Work History

Carpenter Foreman

Archer Western Construction
Salem, Virginia
02.2023 - Current
  • Set up the Bidwell and poured multiple bridge decks.
  • Signaled cranes to set into place, multiple concrete and steel girders.
  • I have done a lot of MSE walls, from everything in the substructures to the superstructures.
  • Implemented safety measures to minimize risks during construction activities.
  • Trained and mentored employees, offering assistance and insight into completing job tasks when needed.
  • Implemented better methods of production to strengthen best practices.
  • Prepared and planned worksites to help jobs run smoothly.

Carpenter

Orders Construction
Max Meadows, Virginia
01.2020 - 02.2023
  • Interpreted blueprints and specifications for project execution.
  • Lifted and positioned heavy steel beams into place.
  • Ironworker: Splicing steel beams and bolting up diaphragms.
  • Broke down and set up multiple lattice-boom cranes.
  • Set up pile hammers and drove H-pile.
  • Worked with EFCO forms to pour all of our structures.
  • Done multiple emergency bridge deck repairs (accelerated jobs).
  • Set up Bidwells, and poured multiple bridge decks.

Laborer

Sloan Construction
Charlotte, North Carolina
01.2017 - 12.2019
  • I worked with latex overlays.
  • Operated heavy machinery to assist with construction projects.
  • Set up pile hammers and drove H-piles.
  • Worked with both wood forming and metal forms for structures.
  • Rigged and set into place, large concrete girders.

Education

High School Diploma -

Fort Chiswell High School
Max Meadows, VA
05-2016

Skills

  • Blueprint interpretation
  • Safety compliance
  • Crane signaling
  • Concrete pouring
  • Steel framing
  • Workforce management
  • Problem-solving abilities
  • Heavy equipment operations
  • Carpentry projects
  • Heavy lifting

References

References available upon request.

Timeline

Carpenter Foreman

Archer Western Construction
02.2023 - Current

Carpenter

Orders Construction
01.2020 - 02.2023

Laborer

Sloan Construction
01.2017 - 12.2019

High School Diploma -

Fort Chiswell High School