Dependable and hard working with 6 Years in the solar industry and 4 years in the rebar industry. Thrive in a fast-paced environment and work to complete projects quickly and efficiently. Qualified worker who stays current with public safety and security standards.
Overview
9
9
years of professional experience
Work History
QA/QC
Solv Energy
Lost Hills, CA
01.2025 - 03.2025
Self-motivated, with a strong sense of personal responsibility.
Worked effectively in fast-paced environments.
Skilled at working independently and collaboratively in a team environment.
Proven ability to learn quickly and adapt to new situations.
Worked well in a team setting, providing support and guidance.
Skid Steer Operator
People Ready Temp Agency
Bakersfield, CA
11.2023 - 07.2024
QA/QC all piles such as plumbing the pile making sure it's leveled, making sure they're not twist or bumps and if they are on perfect degrees
Operated skid steer to clear debris and brush from construction sites
Assisted in the loading and unloading of materials, supplies, and equipment onto trucks
Maintained cleanliness of worksite by removing trash and other debris
Solar Foreman
RP Construction
Monterey, California
07.2019 - 01.2023
QA/QC all job site task such as tracker making sure all torque spec are on point, and if there are no miss hardware
QA/QC all modules making sure if they are not damage or backwards and making sure they are not over torque
QA/QC all piles , making sure if they are not out of tolerance, they don't have any twist or bumps
Ensure all site operatives are trained to use any plant and equipment and they are using it safely and for its correct purpose at all times
Meet and/or exceed production goals
Employee safety and training compliance
Ensure the coordination of section of works on larger project or entire medium sized project or several smaller projects
Rod Buster
Johasee Rebar (LMS Reinforcing Steel Group)
Bakersfield, California
08.2016 - 12.2018
QC all task making sure if it's all fab and tied correctly, making sure there are 3 inches away from the frame and form
Tie rebar, place rebar, measure rebar, cut rebar, carrying rebar, made correct and accurate improvements to the textdot specifications, build Reinforcing rebar pads, columns, walls, foundation and footers to get ready for concrete pour
Selected and placed rods in forms spacing and fastening them together using wire and pliers
Worked under foreman and general Forman
Placed blocks under rebar to hold the bars off the deck when reinforcing floors
Cutting rods to require lengths using a band saw or metaba