Project: - Musaimeer Pumping Station Outfall (MPSO) – Storm Water Shaft 22. Aug 2020 – Dec 2022
Client: - Ashghal (Public Works Authority - Qatar)
Project Value: QR 980 Million
Status: - On-going
Position: - Project Engineer
- Responsible for execution, commissioning, operations & maintenance of mechanical scope of works for the largest storm water pumping station in the region with pumping capacity of 19700 litres/sec.
- Monitored installation of materials and equipment for compliance with drawings and specifications
- Equipment include Submersible pumps, EOT cranes, Motorised valves, HVAC , MV Diesel Generators, Grab rakes, Mechanical Screens, Grit removal system, Oil & grease removal system & Roller gates.
- Monitored metrics during project execution to maintain compliance with planned costs.
- Delivered concise instructions to technical team to maintain quality control
- Successfully operated and maintained the station during seasonal floods before schedule.
Project: - Consultation of the Commissioning of Mega Reservoirs PRPS Package -E. April 2019-February 2020
Client: - Kahramaa. (Qatar General Electricity & Water Corporation)/ CGGC(China Gezhouba Group)
Project Value: QR 6 Million Annually
Status : Completed.
Position: - Commissioning & Operation Consultant – Mechanical Scope of Works
- Worked as O&M engineer to facilitate main contractor in operating major mechanical systems & to fulfil Kahramaa requirements.
- Responsibilities include advising CGGC Engineers to commission & operate mechanical systems like Main MV Pumps, HVAC, Chilled Water System, Surge Suppression System, Air Compressors, MV Diesel Generators and chlorination.
- Provided technical direction of system development methodologies to improve technical performance
- Assisted main contractor to commission main mechanical equipment and handed over to operation dept. within the target dates.
- Operated & maintained MV pumps & station was connected to public potable water network.
Project: - Musaimeer Pumping Station Outfall (MPSO) – Storm Water Shaft 22. Aug 2019 – Present
Client: - Ashghal
Project Value: Total Project Value QR 2 Billion / Shaft 22 works – QR 150 Million
Status: - Under operation.
Position: - Project Engineer
- Initiated, planned & commissioned fast track Storm water shafts of 35mtr depth with combined pumping capacity of 7000ltr/sec in record time for public works authority valued as variation of QR 110Million with main project Value of QR950 Million.
- Developed and maintained relationships with suppliers to facilitate quality and timely delivery of materials
- Trained and mentored junior engineers, providing guidance and direction
- Coordinated with ashghal emergency committee for operation & maintenance during seasonal floods.
Project: - Construction of Mega Reservoirs PRPS Package -B. Nov 2017- Jan 2019
Client: - Kahramaa. (Qatar General Electricity & Water Corporation)
Project Value: QR 2.5Billion
Status: - Under Operation
Position: - Senior Mechanical Engineer
- Installed, commissioned & operated 12 Main pumps & DN2.4m pipework with capacity of 2.8m³/sec each, in world’s largest concrete water reservoir and pumping station.
- Determined and scheduled priorities as required to progress engineering work
- Station was commissioned in record time to be inaugurated by the King of state.
- Trained junior engineers in pipe line design and material handling.
- Operated the station under various demand condition from public drinking water network and achieved maintenance goals with minimum down time.
Project: - Drainage & Rainfall Monitoring. May 2016 - September 2017
Client: - Ashghal (Public Works Authority) Status: - Completed.
Project Value : QR 28 Million.
Position:- Project Coordinator
- Survey, Installation, Monitoring, Operation & maintenance of Flow & Depth Monitoring equipment in 70% of the sewer network in the country for both Storm & Foul water networks.
- Monitored and surveyed most of the older pumping stations in the country for operational & upgradation review (PS1,PS5, PS6, PS10, PS11, PS13N, PS15, PS32/32A, PS40, PS44, PS70,PS IA2, PS AD2,PS SW1, PS SW2A, PS SW3, PS SW5, PS SW9)
- Completed Impermeable Area Surveys (IAS), Installation & Commissioning of Rainfall monitoring gauges in Water Treatment Plants (Doha-north STW, Doha-south STW, Doha-west STW, Al khor STW, Industrial Area STW, Lusail STW, Shahaniya STW).
- Data from 71 flow & depth monitors & pump run time monitors from 35 older pumping station over a period of 2 years was reported. These data helped client to design & optimise existing drainage network.
- Coordinated operation & maintenance of assets in STWs with client’s operations contractor.
Project: - Doha & Rayyan Sewerage refurbishment Project. Nov 2014- Nov 2017
Client: - Ashghal (Public Works Authority) Project Value: QR110 Million
Status: - Completed.
Position: - Mechanical Engineer
- Project involved construction and operation of 6 out dated sewage pumping stations (PS3/1, PS8/1, PS 8/6, PS15, PS23 & PS31).
- Scope of works include Installation, commissioning, operation & maintenance of Main Pumps, EOT Cranes, Odour Control units, Ventilation Systems & Screening Equipment.
- Assisted Project manager in procurement, design calculations, technical proposals, maintenance plans, bill of materials, contract valuation & claims, vendor selection, mechanical Equipment selection & managing subcontractors.
- Completed construction tasks while providing safe working conditions, staying on budget and meeting project deadlines
- Obtained final completion status by coordinating and dealing with public works authority, municipality and electricity board to obtain necessary approvals
Other skills include tendering, preparing & reviewing project documentation, technical datasheets, drawings, layouts, testing & commissioning sheets, operation & maintenance manuals, spares dispatch, permits, method statement & risk assessment reports.