Summary

Deputy Piping Manager with 31 years’ experience in Construction of Refineries, Fertilizers, Power plants, Gas plants and Cross-Country Pipelines. Well versed Knowledge and experience in Refinery and fertilizer construction, Shutdowns / Turn around works. Familiar with international standards for construction of structural, piping fabrication, erection & commissioning activities of refinery and power plants and cross-country pipelines.

Overview

31
31
years of professional experience

Work History

Piping superintendent

M/s JGC IRAQ Basrah FCCU -Project
06.2024 - Current
  • Execution of piping and Module connection in Vis breaker and HDT
  • Planning and scheduling for piping works with Overall monitoring for piping testing system.

Deputy Piping Manager

M/s JGC Singapore - SRC MOGAS Project (SRC Singapore)
10.2015 - Current
  • Execution of piping system in Cogen and OSBL Unit.

Mechanical Superintendent

M/s JGC Vietnam - DQR ADDITIONAL SRU-2 PROJECT SRU-2 PROJECT- Dung Quat- Vietnam
05.2014 - Current
  • Piping Tie-in activities during Refinery Turnaround
  • Static and rotary equipment installation in SRU
  • Fabrication and erection of steel structure in SRU unit
  • Preparation of piping test pack mark up and coordinating testing activities

Deputy Shop Manager

M/s JGC IRAQ Basrah FCCU -Project (DEE shop Fabrication)
07.2022 - 05.2024
  • Execution of piping and support fabrication at shop based in India.
  • Co-ordination with site for shipping and fabrication execution

Piping superintendent

M/s JGC Algeria SPA - Hassi rmel Boosting phase-III Project
03.2017 - 12.2020
  • Execution of piping system in Gas gathering and compression system
  • Planning and scheduling for piping works with Overall monitoring for piping testing system.
  • Remote support for QC-Piping test pack activities

Piping Superintendent

M/s JGC Singapore - SHDS PROJECT. EXXON MOBIL SINGAPORE SHDS Project. Jurong Island
03.2013 - 04.2014
  • Piping fabrication, erection & testing activities
  • Full jacket piping, contra trace & steam tracing works and co-ordination with AE/AI inspection

Piping Superintendent

M/s JGC Qatar - BARZAN ONSHORE PROJECT. RASLAFAN.QATAR Barzan on shore project. Raslafan. Qatar
11.2012 - 02.2013
  • Monitoring piping constructions activities.
  • Preparation construction schedules, area coordination

Piping Chief Supervisor

M/s JGC ARABIA LTD - Manifa CPU, Manifa Saudia Arabia Manifa central processing unit. Saudi Arabia
10.2011 - 10.2012
  • Monitoring piping constructions activities in crude storage unit.
  • Co-ordination with Field Engineering & QC for piping construction and field changes
  • Hydro testing loops line check & mechanical clearance

Piping Chief Supervisor

M/s JGC ARABIA LTD - NCP Project. Jubail, Saudia Arabia Ethylene cracker unit. NCP Project, Jubail KSA.
08.2009 - 08.2011
  • Monitoring piping constructions activities in Ethane cracker unit.
  • Co-ordination for CGC compressor, propylene compressor, with 4 stages piping installation and alignment works.
  • Assistance for Steam blow out and mechanical run for compressor

Piping Supervisor

M/s JGC Singapore. SRC Green fuel Project Jurong Island Singapore SRC Green fuel project, Singapore
04.2009 - 07.2009
  • Hydro testing loops line check & mechanical clearance
  • Construction co-ordination for daily activities
  • Piping tie-in works
  • System completion and pre commissioning assistance

Piping / Mechanical Supervisor

M/s JGC MIDDLE EAST FZE - DOLPHIN ON SHORE PROEFCT. FLARE STACK SHUTDOWN. RASLAFAN.QATAR Stream -1 Flare stack shutdown project. Raslafan. Qatar
01.2009 - 02.2009
  • Flare stack steam line replacement during 18 days shutdown.
  • Installation utility piping in Flare and erection additional supports during shutdown.
  • Inspection for damaged portion for repair work.
  • Coordinating with Rope access team for higher elevation work.

Piping Supervisor

M/s JGC ARABIA LTD - PETRO RABIGH ROPP PROJECT. Petro Rabigh, Rabigh, Saudia Arabia Ethane cracker, High Olefins FCC Unit, Rabigh, Saudi Arabia
04.2007 - 12.2008
  • FCCU RG/RX and fractionators Column connected piping erection
  • CGC Compressor (4 stage) piping erection and alignment works in ethylene cracker unit
  • Monitoring and co-ordination of piping fabrication
  • Co-ordination with Field Engineering & QC for piping spool clearances & NDT follow up
  • Hydro testing loops line check & mechanical clearance

Piping Supervisor

M/s CHIYOTA - TECHNIP JOINT VENTURE(CTJV) - RAS GAS LNG UNIT TRAIN-6&7 EXPANSION - RAS LAFFAN, QATAR Liquefied Natural Gas plant, Ras Gas, Qatar
07.2006 - 02.2007
  • Supervision of piping erection of 132” underground sea cooling water lines.
  • Preparation and evaluation of erection schedule, method statements.
  • Preparation of weekly and monthly construction schedules with sub contractors
  • Follow up with subcontractor for daily activities at site

Piping Supervisor

M/s TECHNIP Abu Dhabi Ltd – Tail Gas Treatment Project Kuwait National Petroleum Company, Shuibha Refinery, Kuwait Tail Gas Treatment Project, Shuibha Refinery Kuwait
07.2005 - 06.2006
  • Supervision of Piping erection activities in existing Sulphur Unit. (48” Flare line) and Preparation of tie in schedules and dossiers
  • Fabrication and testing and Tie-in for Jacket sulfur lines in SRU UNIT
  • Co-ordination with operation for shutdown and startup activities

Piping Supervisor

M/s TECHNIP Abu Dhabi Ltd – VRRP Project Kuwait National Petroleum Company, Mina Abdullah Refinery, Kuwait Vacuum Re-Run Revamp Project. MAB Refinery Kuwait (2 TRAINS)
09.2004 - 06.2005
  • Monitoring Piping erection activities in Vacuum Distillation Unit
  • Piping Tie-in works during plant shutdown (35 no’s) (Under Ground & Above Ground)
  • Vacuum tower lines dismantling and rerouting
  • Supervision of Steam tracing, insulation and painting works

Senior Engineer

M/s Larsen & Toubro Limited – ECC Division, India. From July 1994 to Aug 2004 IOCL Mathura Refineries Ltd, MSQ up gradation Project, Mathura, Uttar Pradesh
01.2004 - 08.2004
  • Costing & Estimation, Preparation of Rate analysis for sub contractors.
  • Preparation monthly, weekly and daily work schedule

Chennai Petroleum Corporation Ltd. Phase-III expn, NHT/CRU Units, Chennai, Tamil Nadu
09.2002 - 01.2004
  • Fabrication & Erection of Process & Utility Piping Systems (155500-inch dia)
  • Piping test pack punch clearing at testing

NPCIL Kudankulam Atomic Power Plant Project Kudankulam, Tamil Nadu
07.2001 - 07.2002
  • Installation of HVAC system, (Ducting, Chilled water piping) for Infrastructures Structural Steel fabrication & Erection for Warehouses & Over head Tank
  • ETP Package installation and commissioning

330 MW Combined cycle Gas Power Plant, Pillai perumalnallur, Tamil nadu
09.2000 - 07.2001
  • Commissioning assistance for power plant Synchronizations including Naphtha Mooring system from Offshore

M/s Hindustan Petroleum Corporation Ltd. Sulphur Recovery Unit, Vizag, Andhra Pradesh
11.1998 - 06.2000
  • Shop fabrication for piping system
  • Consultant: SIRTEGC NIGI spa. Italy

Vizag – Vijayawada Cross country Oil Pipeline Project for Hindustan Petroleum Corporation Ltd, Vizag, Andhra Pradesh
12.1997 - 03.1998
  • Cross country pipeline, Installation of Pigging Stations and Terminals

Nagarjuna Fertilizers and Chemicals Ltd Phase II Expansion Project, Kakinada, Andhra Pradesh
10.1997 - 11.1997
  • Fabrication & Erection of UREA GRADE piping (SS 316 + A 510)

Mangalore Refinery and Petrochemicals Ltd, Tiebreaker Unit, Mangalore, Karnataka
03.1995 - 07.1996
  • Fabrication & Erection of Steam tracing System of 16 Kms for entire plant

Tamandu Petro Products Ltd, EPI Chloro Hydrin Project, Chennai, Tamil Nadu
07.1994 - 03.1995
  • Fabrication and Erection Process & Utility Piping Systems

Education

Diploma - Business Management

National Institute of Management Technology
01.2000

Diploma - Mechanical Engineering

The Seshasayee Institute of Technology
01.1994

Skills

  • Construction supervision
  • Inspection coordination
  • Documentation control
  • Welding techniques

Timeline

Piping superintendent

M/s JGC IRAQ Basrah FCCU -Project
06.2024 - Current

Deputy Shop Manager

M/s JGC IRAQ Basrah FCCU -Project (DEE shop Fabrication)
07.2022 - 05.2024

Piping superintendent

M/s JGC Algeria SPA - Hassi rmel Boosting phase-III Project
03.2017 - 12.2020

Deputy Piping Manager

M/s JGC Singapore - SRC MOGAS Project (SRC Singapore)
10.2015 - Current

Mechanical Superintendent

M/s JGC Vietnam - DQR ADDITIONAL SRU-2 PROJECT SRU-2 PROJECT- Dung Quat- Vietnam
05.2014 - Current

Piping Superintendent

M/s JGC Singapore - SHDS PROJECT. EXXON MOBIL SINGAPORE SHDS Project. Jurong Island
03.2013 - 04.2014

Piping Superintendent

M/s JGC Qatar - BARZAN ONSHORE PROJECT. RASLAFAN.QATAR Barzan on shore project. Raslafan. Qatar
11.2012 - 02.2013

Piping Chief Supervisor

M/s JGC ARABIA LTD - Manifa CPU, Manifa Saudia Arabia Manifa central processing unit. Saudi Arabia
10.2011 - 10.2012

Piping Chief Supervisor

M/s JGC ARABIA LTD - NCP Project. Jubail, Saudia Arabia Ethylene cracker unit. NCP Project, Jubail KSA.
08.2009 - 08.2011

Piping Supervisor

M/s JGC Singapore. SRC Green fuel Project Jurong Island Singapore SRC Green fuel project, Singapore
04.2009 - 07.2009

Piping / Mechanical Supervisor

M/s JGC MIDDLE EAST FZE - DOLPHIN ON SHORE PROEFCT. FLARE STACK SHUTDOWN. RASLAFAN.QATAR Stream -1 Flare stack shutdown project. Raslafan. Qatar
01.2009 - 02.2009

Piping Supervisor

M/s JGC ARABIA LTD - PETRO RABIGH ROPP PROJECT. Petro Rabigh, Rabigh, Saudia Arabia Ethane cracker, High Olefins FCC Unit, Rabigh, Saudi Arabia
04.2007 - 12.2008

Piping Supervisor

M/s CHIYOTA - TECHNIP JOINT VENTURE(CTJV) - RAS GAS LNG UNIT TRAIN-6&7 EXPANSION - RAS LAFFAN, QATAR Liquefied Natural Gas plant, Ras Gas, Qatar
07.2006 - 02.2007

Piping Supervisor

M/s TECHNIP Abu Dhabi Ltd – Tail Gas Treatment Project Kuwait National Petroleum Company, Shuibha Refinery, Kuwait Tail Gas Treatment Project, Shuibha Refinery Kuwait
07.2005 - 06.2006

Piping Supervisor

M/s TECHNIP Abu Dhabi Ltd – VRRP Project Kuwait National Petroleum Company, Mina Abdullah Refinery, Kuwait Vacuum Re-Run Revamp Project. MAB Refinery Kuwait (2 TRAINS)
09.2004 - 06.2005

Senior Engineer

M/s Larsen & Toubro Limited – ECC Division, India. From July 1994 to Aug 2004 IOCL Mathura Refineries Ltd, MSQ up gradation Project, Mathura, Uttar Pradesh
01.2004 - 08.2004

Chennai Petroleum Corporation Ltd. Phase-III expn, NHT/CRU Units, Chennai, Tamil Nadu
09.2002 - 01.2004

NPCIL Kudankulam Atomic Power Plant Project Kudankulam, Tamil Nadu
07.2001 - 07.2002

330 MW Combined cycle Gas Power Plant, Pillai perumalnallur, Tamil nadu
09.2000 - 07.2001

M/s Hindustan Petroleum Corporation Ltd. Sulphur Recovery Unit, Vizag, Andhra Pradesh
11.1998 - 06.2000

Vizag – Vijayawada Cross country Oil Pipeline Project for Hindustan Petroleum Corporation Ltd, Vizag, Andhra Pradesh
12.1997 - 03.1998

Nagarjuna Fertilizers and Chemicals Ltd Phase II Expansion Project, Kakinada, Andhra Pradesh
10.1997 - 11.1997

Mangalore Refinery and Petrochemicals Ltd, Tiebreaker Unit, Mangalore, Karnataka
03.1995 - 07.1996

Tamandu Petro Products Ltd, EPI Chloro Hydrin Project, Chennai, Tamil Nadu
07.1994 - 03.1995

Diploma - Mechanical Engineering

The Seshasayee Institute of Technology

Diploma - Business Management

National Institute of Management Technology