Summary
Overview
Work History
Education
Skills
Timeline
Generic

RAMIRO GONZALEZ

San Juan,Tx

Summary

Industry worker in Electrical work with over 15 years of experience working for leading electrical companies in the electrical field, both commercial and industrial projects. Connecting and installing power panels,Terminating motors and fan decks,installing flex pipe cable

Overview

14
14
years of professional experience

Work History

Journeyman Electrician

Betchel
Gregory, Texas
10.2024 - 08.2026
  • Installed cabling for lighting fixtures to ensure proper illumination and compliance with design specifications
  • Installed cable and channel trays to support organized electrical infrastructure
  • Install bus ducts for electrical rooms NCC
  • Completed electrical terminations in designated areas
  • Installed equipment fixtures and receptacles to facilitate electrical functionality
  • Reviewed blueprints to ensure accurate installation

Electrician

MMR
Ingleside, Illinois
10.2019 - 10.2023
  • Installed wiring, conduit, and electrical components on MMR industrial job sites.
  • Interpreted blueprints, schematics, and work orders for MMR electrical installations.
  • Troubleshot lighting, power, and control issues using meters and hand tools.
  • Repaired damaged wiring, fixtures, and panels during MMR service work.

Electrician

Wood Group
Freeport, Texas
08.2017 - 03.2019
  • Ran cable tray, installed panels, circuit boxes, and lights
  • Installed and built PLC panels
  • Wired level switches and instruments.
  • installing Jboxes

Electrician

Bay Ltd
ingleside, Tx
07.2015 - 05.2017
  • Installed cable systems for electrical connectivity. Tray & install panels
  • Managed installation of circuit boxes for electrical systems.,Installed lighting fixtures to enhance visibility.,installing and terminating panels
  • Installed instruments on equipment to ensure accurate readings. such as level switches and mvs on equipment

Electrician

Excel Ind
Port Arthur
09.2012 - 06.2015
  • Installed cable trays, panels, circuit boxes, and lights, and terminated connections for optimal functionality.
  • Install motors as well as and Installed conduit for electrical systems in commercial buildings.
  • running conduit ,Troubleshooting using volt meters Installing PLCS

Education

Psja High School

Skills

  • Electrical installation
  • PLC wiring
  • Panel termination
  • Cable tray assembly
  • Bus duct installation
  • Blueprint reading
  • Troubleshooting
  • Safety awareness
  • Analytical thinking
  • Team leadership
  • Team collaboration
  • Oral communication

Timeline

Journeyman Electrician

Betchel
10.2024 - 08.2026

Electrician

MMR
10.2019 - 10.2023

Electrician

Wood Group
08.2017 - 03.2019

Electrician

Bay Ltd
07.2015 - 05.2017

Electrician

Excel Ind
09.2012 - 06.2015

Psja High School
RAMIRO GONZALEZ