Overview
Work History
Timeline
Generic

Randall Kellerman

Assembly Project Tech 1
Manhattan,PA

Overview

24
24
years of professional experience

Work History

Assembly Project Tech

First Quality Products
McElhattan, PA
09.2021 - Current
  • Successfully works with Assembly Shop Technician colleagues, which address design, fabrication, and application issues that are related to the First Quality Products project/process scope. These project/process scopes or requests are addressed accordingly, working closely with the project or process engineers.
  • Develop, review, or correct blueprints, design drawings, and process applications, in consideration of the needs, abilities, and interests of the project application design or design group.

Engineering Technician

First Quality Hygienic
121 North Road, McElhattan , PA
12.2000 - 09.2021
  • Conducted environmental impact assessments for engineering projects, ensuring sustainability.
  • Maintained detailed records of all engineering activities including test results, calculations and other relevant information.
  • Entered and distributed work orders to other technicians. Including work orders completed
  • Managed inventory of engineering supplies and equipment, ensuring availability for projects.
  • Facilitated collaboration between departments to streamline project completions. Tube winding, tampon production, and packaging equipment projects and process applications.
  • Assembled and tested components, wiring and systems, locating and correcting faults to optimize production results.
  • Reviewed designs for compliance with current industry practices and field conditions.
  • Performed diagnostics and testing to locate root causes and resolve issues for optimal performance.
  • Developed maintenance plans for manufacturing equipment.
  • Monitored project progress, identifying any issues and recommending solutions to improve efficiency.
  • Created detailed work instructions for assembly line personnel based on established engineering protocols.
  • Assisted in the design and development of engineering projects, contributing technical expertise.
  • Conducted statistical studies to analyze or compare production costs for sustainable or non-sustainable designs.es
  • Conducted statistical studies to analyze or compare production costs for sustainable or non-sustainable designs.
  • Implemented quality control procedures to maintain high standards in engineering projects. Wrote and implemented validation protocols, IQ, OQ
  • Prepared reports documenting results of engineering experiments and investigations.
  • Designed or modified engineered schematics using computer-aided design software.

Timeline

Assembly Project Tech

First Quality Products
09.2021 - Current

Engineering Technician

First Quality Hygienic
12.2000 - 09.2021
Randall KellermanAssembly Project Tech 1