
Results-driven Production Associate specializing in efficient machine operation and effective material handling. Proven ability to prioritize tasks and maintain production efficiency. Eager to leverage skills and positive attitude for impactful contributions in a dynamic manufacturing environment.
I have 3 years of previous experience working in Cooling Tubes.
Organized workstation to meet demanding
production goals in Highpot area.
Multi tasking and prioritizing workstation
needs.
Prepared Cooling Tube materials (25S and 23S) for
assembly work to keep production workflows running
smoothly.
Communicating with team, size of
Cooling Tube needed to be worked on from their
workstation tables.
Experience in Inventory Count and reporting total finished goods, have used Microsoft Excel and Outlook.
Participated in training course to enhance skills and
knowledge.
Running Highpot machines and changing cavity size.
1 year experience and currently working at Section G Components
Operating Stamping Press Machines, IMMs and Wash
Forklift, Walkie and Electric Pallet Jack Certified
Crane Certified
STAMPING PRESS
Troubleshooting and identifying machines alarm faults at Stamping Press and learned to put in Flux for maintenance related issues.
Knowing the ratio of lube every 3 hours that been use for smoother cuts of the blank materials.
Every 15 minutes the table turns to get a sample of one current collector and must do quality check for and to identify cause of defects through the Stamping Press Machine. Escalating with Tool & Die Personnel for defects still persist at the current Collector.
IMM
Checking the mold parts for any rework and other defect parts and notify to a Lead associate and Quality Technician.
WASH
Every Pallets that is done from the Press will go through the next process and transfer the CC parts from pallet to table and will use a brush tool to remove shavings, particles etc. and feed the Current Collector parts through the machine. It will clean the lubes off the parts and will come out dry and clean will be stack to a pallet and will be the final product before sending it to Zone 0 area.