Summary
Overview
Work History
Education
Skills
Personal Information
Relevant Project Experience
Summary
Languages
References
Timeline
Generic

Randy Carrasco

Presidio

Summary

Experience in building and managing mid and large projects in the oil field, Building safe and productive teams and projects and developing strong client relationships. Resourceful Project Superintendent known for high productivity and efficient task completion. Specialize in effective communication, risk management, and workflow optimization. Excel in leadership, problem-solving, and adaptability to ensure project success while maintaining safety and quality standards.

Overview

15
15
years of professional experience

Work History

Project Superintendent

MACH Energy
06.2022 - Current
  • MPLX/Kinder Morgan - Prover Addition ( Jackrabbit Station )
  • MPLX - Gibson Header Addition ( Jackrabbit Station )
  • MPLX - HPP to PAA ( Jackrabbit Station )
  • MPLX - Epic Connection ( Jackrabbit Station )
  • MPLX - Tornado 1 BTEX Combustor Install
  • MPLX - Tornado 2 BTEX KO Install
  • XTO - Row2 & Row5 Booster Station

Foreman / Superintendent

Wood
01.2013 - 06.2021
  • Managing a variety of projects, including:
  • Safety
  • Package take-offs
  • Planning and scheduling
  • Productions piping, coordination and installation
  • High pressure hydrostatic and pneumatic testing
  • Crane and equipment coordination
  • Equipment installation
  • As-built and redline drawings
  • Inspection
  • Reporting
  • Close out jobs after completion
  • Drafting isometric drawings using P&IDs and Orthos:
  • Working closely with the third party engineers and construction management team to draft up the isometric drawings where none were provided
  • Work closely with plant managers and operators
  • Coordinated with suppliers to address any issues related to delivery times or quality control.
  • Ensured proper storage of material in warehouses or other facilities.
  • Investigated discrepancies between physical inventories and book inventories.
  • Performed daily stock counts to ensure accurate inventory records.
  • Managed movement of materials and product through production.
  • Received incoming shipments and reviewed contents against purchase order for accuracy.
  • Managed inventory levels of supplies necessary for job completion.
  • Supervised projects to uphold schedule requirements and quality demands.
  • Checked project details to verify job site materials and equipment.
  • Communicated with suppliers and coordinated delivery of supplies to job sites.
  • Allocated material and labor resources to promote on-time and under-budget project completion.
  • Relevant Project Experience
  • Navitas Train 1 60mmcfd cryo rebuild
  • Mentone Gas Plant Phase 1 200mmcfd gas processing plant with 1600 GPM Amine
  • N Reeves 175,000BBL oil Stabilization Facility
  • Anadarko Mentone Project Train 1, 200 mmcfd, 42" Slug catcher 2000 barrel - Mentone, Texas
  • Anadarko Ramsey Project Ram 4, 200 mmcfd, 1600 GPM Amine
  • Anadarko Ramsey 5, 200 mmcfd, 160gpm Amine
  • Anadarko Ramsey 6 mmcfd, 42" Slug catcher 2000 barrel - Orla, Texas

Foreman / Superintendent

Saulsbury
01.2010 - 01.2013

Education

High School Diploma -

Presidio High School
Presidio, TX
05-2005

Skills

  • Pipefitting
  • Layouts
  • Drafting
  • Field Measuring
  • As-Builts / P&IDs
  • Orthos / LOTO
  • Hydro testing
  • Fabrication / Installation of piping
  • Inspection
  • Rigging
  • Certified Equipment Operator
  • Material coordination
  • Material procurement
  • Project management
  • Quality control
  • Planning and scheduling
  • Equipment installation
  • Construction supervision

Personal Information

Title: Construction Superintendent

Relevant Project Experience

  • Navitas Train 1, 60mmcfd cryo rebuild
  • Mentone Gas Plant Phase 1, 200mmcfd gas processing plant with 1600 GPM Amine
  • N Reeves, 175,000BBL oil Stabilization Facility
  • Anadarko Mentone Project Train 1, 200 mmcfd, 42" Slug catcher 2000 barrel, Mentone, Texas
  • Anadarko Ramsey Project Ram 4, 200 mmcfd, 1600 GPM Amine
  • Anadarko Ramsey 5, 200 mmcfd, 160gpm Amine
  • Anadarko Ramsey 6, mmcfd, 42" Slug catcher 2000 barrel, Orla, Texas

Summary

10+, Oil & Gas, Refining, Midstream, Downstream, Onshore, Refineries, Gathering Systems, Tank Batteries, Shutdowns / Turnarounds, Upgrades / Rebuilds, Pipefitting, Layouts, Drafting, Field Measuring, As-Builts / P&IDs, Orthos / LOTO, Hydro testing, Fabrication / Installation of piping, Inspection, Rigging, Certified Equipment Operator

Languages

English
Professional
Spanish
Professional

References

References available upon request.

Timeline

Project Superintendent

MACH Energy
06.2022 - Current

Foreman / Superintendent

Wood
01.2013 - 06.2021

Foreman / Superintendent

Saulsbury
01.2010 - 01.2013

High School Diploma -

Presidio High School
Randy Carrasco