Hired as a pipe foreman, promoted to superintendent three months later.
completed projects- I-26/74 merge in polk co NC, road widening Wyoming/Mercer wv, and Rockingham by-pass rockingham NC.
Site Superintendent
Asphalt contractors& site work
Lavalette, WV
02.2016 - 10.2017
completed various projects which included site grading and utilities.
Apartment complex for Huntington Housing, 2 O'Reilly's, and helped with various other commercial projects.
Crane Leader
AK Steel
Ashland, KY
09.2013 - 12.2015
Caster pouring molten metal/ samples from steel, directing loading of steel to train cars for transport.
Site Superintendent
opell excavating
Ashland, KY
01.2007 - 01.2013
Utility company
Various projects in OH, KY, WV, and PA. including;
Water transfer for fracking, which includes auger bores and directional bores at streamways. welded many poly stringers for the compression pads.
Installed new water system to replace old for the township fo Frankfort Oh, which includes main line, hot taps, 75 fire hydrants, switching meters and taps for houses.
instlation of new Water line for Ross county water in Oh, which includes main line, creek crossings, hydrants, valves, ect.
For natural energies, gas welded and installed poly gas lines in various locations.
installed new sewer in Mt Orb OH./ sewer plant in hillsboro OH.
bored under big sandy river for kenova water.
Site Superintendent
Davis & Burton
Ashland , KY
03.1998 - 11.2006
Started as a laborer, grade checking then pipe layer. Various site projects Walmarts and such.