Summary
Overview
Work History
Education
Skills
Timeline
Generic

Raymond Barrientos

Arlington,TX

Summary

Utilizes effective problem-solving skills to ensure high-quality finishes on all projects. Knowledge of industry standards and strong understanding of client needs, leading to consistent project success.

Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.

Recent graduate with foundational knowledge in Area of study and hands-on experience gained through academic projects and internships. Demonstrates strong teamwork, problem-solving, and time-management skills. Prepared to start career and make meaningful contributions with commitment and drive.

Tech-savvy innovator with hands-on experience in emerging technologies and passion for continuous improvement. Skilled in identifying opportunities for technological enhancements and implementing effective solutions. Adept at leveraging new tools and methods to solve problems and enhance productivity. Excels in adapting to fast-paced environments and driving technological advancements.

Hardworking and passionate job seeker with strong organizational skills eager to secure entry-level Job Title position. Ready to help team achieve company goals.

Overview

2026
2026
years of professional experience

Work History

Heating, Ventilation, and Air Conditioning Foreman

Metro Mechanical
South Bryan Belt Line Mesquite Tx
2020 - 08.2025
  • Filled out detailed work orders for each job completed.
  • Investigated major malfunctions and breakdowns of heating and air-conditioning systems and used troubleshooting to determine causes.
  • Kept accurate records of time and materials used for each job to compile into service reports.
  • Closed out work orders after verifying completion with customers and reporting discrepancies discovered on job site.
  • Analyzed large-scale plans at warehouse.
  • Arranged floor design featuring supply grilles.
  • Executed welding tasks for curb stub holes beneath warehouse.
  • Adjusted roof curbs to accommodate RTU and exhaust units level.
  • Coordinated with general contractor to arrange roofing schedule.
  • Directed installation of curbs by instructing helpers and subcontractors.
  • Verified proper installation of RTU curbs by subcontractors using safe PPE.
  • Optimized return air flow by dressing out RTU units.
  • Completed installation of snap lock in specified location.
  • Secured proper installation of square duct drops from RTU.
  • Completed copper brazing processes for mop sink assembly.
  • Transported materials from supplier to job site.
  • Certified in operating arrow lift, skytrack boomlift, and forklift.
  • Demolition

Heating, Ventilation, and Air Conditioning Foreman

A And R Air Conditioning & Refrigeration
07.2019 - 08.2020

Completed installation of mini split horizontal furnace upflow unit.

Awaited service technician to activate unit.

Heating, Ventilation, and Air Conditioning Foreman

Chapman Air Conditioning
10750 Sandhill Rd, Dallas, TX 75238
2015 - 2019
  • Streamlined project management, coordinating with contractors and suppliers to ensure smooth installations.
  • Contributed to company growth by actively seeking new business opportunities through networking events and trade shows.
  • Increased customer retention rates by consistently exceeding expectations in both service quality and communication efforts.
  • Expedited project completion times, effectively managing schedules and delegating tasks to team members.
  • Install mini split horizontal furnace and up upflow unit install flex
  • Performed accurate placement of rails during flex to boots installation.
  • Installed boots and flex, completing finish out with grilles.
  • Installed insulation on snap lock systems.
  • Demolition

Painting Contractor

Colby Fields Painting
Mesquite, TX
2020 - 2025
  • Engaged in activities during free time and as a side job.
  • Developed lasting relationships with clients through exceptional communication and responsiveness, leading to repeat business opportunities.
  • Enhanced client satisfaction by delivering high-quality painting services on time and within budget.
  • Maintained a safe work environment with proper handling of tools, equipment, and materials, resulting in zero workplace accidents.
  • Increased team efficiency by implementing streamlined project management strategies for painting projects.
  • Managed project timelines effectively to ensure timely completion without compromising quality or safety standards.
  • Contributed to the company''s growth by generating new business leads through targeted marketing efforts and positive word-of-mouth referrals from satisfied clients.
  • Communicated with clients to ensure alignment and drive sales.

Education

GED -

Dallas Can
1227 N Masters Dr, Dallas, TX 75217

Skills

  • Piping installation
  • Heating and ventilation repairs
  • Duct cleaning
  • Leak testing
  • Ductwork fabrication
  • Heating systems
  • HVAC controls
  • Scheduling coordination
  • Welding techniques
  • Equipment installation
  • System installation
  • HVAC system design
  • Indoor air quality
  • Blueprints and specifications
  • Load calculations
  • Brazing techniques
  • Ventilation systems
  • Energy management
  • Air balancing
  • Cooling systems
  • Plumbing systems
  • Teamwork
  • Teamwork and collaboration
  • Customer service
  • Problem-solving
  • Attention to detail
  • Leadership skills
  • Problem-solving abilities
  • Tools and equipment maintenance
  • Multitasking
  • Dependable and consistent
  • Multitasking Abilities
  • Reliability
  • Excellent communication
  • Organizational skills
  • Team collaboration
  • Active listening
  • Effective communication
  • Hand and power tool operation
  • Adaptability and flexibility
  • Job prioritizing
  • Decision-making
  • Heavy lifting
  • Machinery operations
  • Employee safety training
  • Safety compliance
  • Relationship building
  • Customer relations
  • Data entry and analysis
  • Visual inspection
  • Stress tolerance
  • Employee motivation
  • Safety standards
  • Worker training
  • Maintenance planning
  • Equipment operation
  • Self motivation
  • Interpersonal skills
  • Conflict resolution
  • Goal setting
  • Risk assessment
  • Professionalism
  • Materials and labor costing
  • Strategic planning
  • Schedule management
  • Hazard monitoring and management
  • Work area inspection
  • Staff supervision
  • Time management abilities
  • Inventory management
  • Tool and parts inventory oversight

Timeline

Heating, Ventilation, and Air Conditioning Foreman

A And R Air Conditioning & Refrigeration
07.2019 - 08.2020

Heating, Ventilation, and Air Conditioning Foreman

Metro Mechanical
2020 - 08.2025

Heating, Ventilation, and Air Conditioning Foreman

Chapman Air Conditioning
2015 - 2019

Painting Contractor

Colby Fields Painting
2020 - 2025

GED -

Dallas Can
Raymond Barrientos