Civil Engineer with 12 years of experience working in various capacities and for a diverse collection of employers (governmental - DOT to municipal; private - PB to Kowelman). Proven to adapt well in any work environment and always takes pride in accuracy and attention to design details.
Manage all aspects of company bills and billing. Answer client billing questions. Keep connected with staff regarding the state of certain cases. Reconcile Operating and Trust accounts with monthly statements; reconcile Trust account with Client account records. Keep the company balance sheet current and complete yearly corporate tax returns.
Design engineer - Pavement drainage and pipe design, driveway/intersection design, staging design for approx. $5M roadway widening for City of Cedar Rapids; Design monitoring of several small projects (largest was $1M+) in the town of Dysart, IA. Design of several smaller projects for other public clients.
Yard piping and general site design for wastewater treatment plant expansion for MSD in St. Louis. Site design and construction staking information for several projects, including a 40-acre site for a Lowes and Schnucks Grocery, and a Target retail store. Revised plans (by others) during construction of a roadway so the project could be built. Final site design for the Engineering building at University of Missouri - Rolla.
Preliminary design and review of utilities for the Cross County Collaborative Metrolink (light rail), reviewed drainage plans for expansion of Lambert International Airport, performed general design for Cool Springs Road extension.
Preliminary design for several roadways and roadway extensions, drainage design and roadway alignments. Design studies on various roadways within the City of Maryland Heights, MO.
Site designs for business and residential sites; provided all information for setting property pins, drainage calculations, roadway alignments.
Design of storm and sanitary sewer for separation project; preliminary design of recreational path along Missouri River; construction inspection for storm sewer project.
Inspection of state roadway replacement; inspected and documented removal and installation of improvements; surveyed for placement of storm sewer structures
Inspection and documentation for bridge replacement at I-55/Jefferson St. interchange in Joliet, IL. Measured all removals prior to commencement of work; inspected construction activities (PCC, ACC, and storm sewer placement); checked site vs. plan quantities; surveyed and grade-checked multiple times per lift of pavement; performed concrete testing for quality control.