Summary
Overview
Work History
Education
Skills
Timeline
Generic

RENE HERNANDEZ

STOCKTON,CA

Summary

Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.

Overview

24
24
years of professional experience

Work History

Tile Setter

SELF-EMPLOYED
06.2010 - Current
  • Conducted thorough site assessments before installation to identify any potential issues and provide accurate quotes to clients.
  • Completed high-quality installations with precision cutting and fitting of tiles for residential and commercial projects.
  • Inspected floors before, during and after tile installation and reported identified concerns.
  • Increased client referrals through exceptional craftsmanship and attention to detail in all completed projects.
  • Operated machines to mix mortar, thinset and grout according to standard formulas.
  • Maintained a safe work environment through proper use of tools, equipment, and adherence to safety protocols.
  • Reduced material waste by efficiently planning layouts and cuts before commencing installation procedures.
  • Provided clear communication with clients regarding project timelines, budgets, and potential challenges during the installation process.
  • Collaborated with contractors and architects to execute complex designs, resulting in visually appealing spaces.
  • Consistently met deadlines for high-pressure projects, ensuring customer satisfaction and repeat business opportunities.
  • Prepared for new installations and repair work by removing original materials and debris.
  • Learned about various tile types, sizes and installation techniques and stayed current on industry changes.
  • Installed tile flooring in residential homes and commercial buildings.

Construction Worker

GARY PIEFER CONSTRUCTION
01.2000 - 06.2010
  • Contributed to a positive work culture by fostering teamwork among staff through open communication channels, which led to higher overall productivity levels during projects.
  • Mixed and poured concrete for variety of projects.
  • Managed safe and efficient use of tools and equipment on construction sites.
  • Assisted with successful, time-sensitive renovations of various structures.
  • Cleaned and maintained tools, equipment and worksites.
  • Operated heavy machinery efficiently, ensuring timely progress on construction projects while minimizing risk of accidents or damage.
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Operated forklifts and boom lifts to complete various tasks.
  • Dug trenches, backfilled holes and compacted earth to prepare for new construction.
  • Helped with erecting scaffolding and ladders.
  • Loaded and unloaded materials and equipment onto and off construction sites.
  • Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
  • Helped with door and window installations.
  • Installed drywall, siding and other structural components.

Education

MORELOS HIGH SCHOOL
MORELOS MEXICO

Skills

  • Flooring Installation
  • Floor leveling
  • Stone setting
  • Blueprint Reading
  • Safety Procedures
  • Layout planning

Timeline

Tile Setter

SELF-EMPLOYED
06.2010 - Current

Construction Worker

GARY PIEFER CONSTRUCTION
01.2000 - 06.2010

MORELOS HIGH SCHOOL
RENE HERNANDEZ