Over 15 years of extensive experience in SHES management, recognized as a dedicated HSE professional with a proven track record of enhancing safety culture and ensuring full compliance in the Oil & Gas, Construction, and Infrastructure sectors. Expertise in designing and executing strategic health, safety, and environmental programs that drive sustainable improvements and foster a proactive approach to risk management within teams. A strong commitment to continuous development is demonstrated through structured training initiatives, active workforce engagement, and consistent application of safety standards aimed at achieving operational excellence. Passionate about cultivating a safe work environment that empowers employees while minimizing risks and maximizing productivity.
Project: Locations Handled: Roles & Responsibilities:
Client: Qatar Energy LNG
Main Contractor: TECNICAS REUNIDAS
Employer: CNCEC ELECO (China National Chemical Engineering & Construction Corporation)
Role: SHES Coordinator
Duration: December 2023 – Present
Responsibilities
PROJECTS HANDLED ROLES & RESPONSIBILITIES
1. NFE EPC-1 Desalination Plant
Main Contractor: CTJV | Client: QELNG | Role: SHES Coordinator
2. Al Kharsaah Solar Power Project
Main Contractor: Power China Sinohydro Corporation Ltd. | Client: Siraj 1 | Role: HSE Coordinator
3. Lusail Commercial Boulevard (18 Multi-storey Buildings)
Main Contractor: Redco Al Mana | Role: HSE In-Charge
4. Lusail Burj Damac Waterfront Tower (24-Storey Building)
Main Contractor: Draieh Contracting | Client: Burj Damac | Role: HSE Engineer
5. Qatar Energy – Dukhan Operation Buildings & Plant
(Fire Protection, Fire Alarm, SCBA Maintenance)
Role: HSE Coordinator / Officer
6. Q-Chem Plant (Fire Protection Maintenance)
Role: HSE Coordinator
7. Contraco Headquarters Building
Client & Main Contractor: Contraco | Role: HSE Engineer
8. Qatar University (College Building Project)
Main Contractor: Gulfar | Role: HSE Coordinator
9. Laffan Refinery (KAHRAMAA Substation)
Client: KAHRAMAA | Role: HSE Coordinator
PROJECTS HANDLED Kahramaa Substation Projects
Phase 12 – GTC 643A / 643D / 2014
Phase 11 – GTC 488C / 2012
Phase 10 – GTC 395 / 2010
Doha Mall