Seeking a career with a progressive organization where I can utilize my skills, knowledge and experience to progress an advance while maintaining a safe, quality, an productive work environment.
Overview
20
20
years of professional experience
Work History
Single Facer Operator
Smurfit Westrock
San Antonio, Texas
07.2019 - 10.2026
Monitored corrugator facer operations for Smurfit Westrock corrugated board production.
Adjusted glue, steam, and speed settings during facer runs.
Checked board alignment and surface quality against packaging line standards.
Fed liners and medium into facer equipment with steady material flow.
Stamping Machine Operator
Joyson Safety Systems
San Antonio, Texas
05.2016 - 03.2019
Operated and maintained 2 and 3 ton stamping machines, ensuring safe and efficient production.
Maintained all 5S procedures.
Loaded and unloaded materials and dies for setup using an overhead crane, facilitating smooth production transitions.
Executed die and material setups for each machine during production runs.
Band all unused material to store safely when not in use.
Ensured high quality in all produced parts by adhering to company protocols and quality standards.
Punch Machine Operator
E.P.M.P
Seguin, Texas
06.2015 - 05.2016
Loaded programs and set up Amada Queen and King punch machine for production runs.
Sharpened all tools regularly to ensure functionality.
Gathered and logged materials into inventory for all work orders to ensure availability.
Punched and submitted first pieces to Q.C. for qualification checks to maintain quality standards.
Performed minor maintenance on the machine to ensure optimal operation.
Applied lubrication to the machine to ensure smooth operation.
Clean Room Tech
GREENE TWEED & CO LLC
, Texas
01.2011 - 04.2015
Coordinated work orders to ensure timely completion.
Molded multiple types of semiconductor o-rings and wafer holders using compression molding chambers.
Deburred and stretched trimmed all parts according to part specifications. Inspected all parts for voids and rejects.
Washed parts in ultrasonic tanks to eliminate potential contaminants; managed loading and unloading of post cure ovens.
Extruded raw materials into specified preform shapes using extrusion equipment.
Maintained clean and safe work environment in compliance with all procedures.
Aircraft Composite Tech
Jeff Bonner R&D
San Antonio, Texas
12.2009 - 10.2010
Constructed master molds from m.d.f. boards according to drawings and prepared them for priming and lamination.
Laminated/wet layups on master tools using various tooling cloths and epoxy resins, created multiple resin stop vacuum bags for detailed molds, and demolded tools while prepping them for clean room. Performed grinding and trimming, ensuring precise alignment using various scales and scribes.
Layup/Cleanroom
Laid up composite components including ceiling and valence panels, bidets, sinks, ducts, take offs, window reveals, and custom shower parts using prepregs such as L-501, Kevlar, Phenolic, and Carbon Fiber. Worked with cores like Honeycomb and Flex core, Airex and Divincell foam core, and Rohacell core, bonding them together and vacuum bagging all parts. Wrote and ran programs for autoclave and post cure ovens, demolding parts and creating oven charts, and presenting first pieces to Q.C.
Poduction Lead
Link New Tech
Selma, Texas
07.2008 - 12.2009
Managed daily operations and monitored workloads in the warehouse to ensure timely shipment of all orders.
Maintained an accurate inventory count for all parts.
Trained all new employees how to assemble our automotive fluid flush machines.
Conducted thorough inspections of all machines after assembly to ensure quality and functionality.
Carefully packaged and prepared all machines for shipment once assembly was completed.
Efficiently loaded and unloaded delivery trucks using a forklift to maintain workflow in the warehouse.
Aircraft Composite Tech
Aviation Technologies
SAN ANTONIO, Texas
05.2006 - 07.2008
Laid up different window revel molds using prepregs in a clean room environment.
Trimmed all window revels using air tools, jigs and fixtures according to drawings.
Prepped all composite parts for paint using body filler to fill voids.
Boned custom fiberglass trailers together using wet lay-ups and bonds.
Assisted with installation of Boeing KC-135 floorboards in compliance with specifications.
Stripped the plane of all floorboards. Routed out new one using different templates fixtures and jigs.
Prepped all floorboards for paint.
Installed all boards and hardware on plain once done from paint.
Performed minor welding, flame spraying, and forklift operation.