Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Ricardo Barron

Phoenix,AZ

Summary

Hardworking Tile Installer/supervisor with solid background managing diverse projects. Keep employees on-task and projects under-budget with effective management. Skilled at completing daily assignments and contributing to team success. Always willing to take on any task. Adapts quickly to new needs and policies.

Overview

20
20
years of professional experience

Work History

HVAC Installer ( Brazer)

CMK Heating and Cooling
01.2024 - Current
  • Completed complex brazing projects for customized client specifications with attention to detail and tight deadlines.
  • Collaborated with team members to complete large-scale brazing assignments efficiently and accurately.
  • Participated in continuous improvement initiatives by sharing expertise and suggesting improvements to current brazing processes.
  • Achieved precise brazing results by carefully preparing joint surfaces and applying appropriate flux.
  • Improved overall brazing quality by maintaining clean work areas and keeping equipment in good working condition.

Remodeler

Echo Dry Restoration
11.2020 - 08.2023
  • Utilized advanced tools and equipment to complete complex remodeling projects with precision and speed.
  • Maintained safe work environments by adhering to proper safety protocols and conducting regular inspections of job sites.
  • Delivered top-notch tiling work for bathroom remodels that enhanced both appearance and functionality of the space.
  • Continuously educated myself on industry trends and best practices to provide clients with innovative solutions and stay ahead of the competition.

Foreman

Foley Tile LLC.
01.2018 - 10.2020
  • Handled crew recordkeeping, including preparing weekly timesheets, safety logs, and expense reports
  • Drove progress and promoted budget adherence through effective labor and materials allocation
  • Managed stringent deadlines by defining and modifying work sequences to meet construction schedule
  • Enforced worksite safety and adherence to OSHA protocols, providing timely resolution for identified hazards
  • Interpreted project specifications, blueprints, and diagrams to maintain adherence to requirements
  • Coordinated work activities with other construction project activities
  • Estimated material or worker requirements to complete jobs

Installation Contractor

DaVinci Custom Tile and Stone
05.2012 - 12.2018
  • Managed smooth installations
  • Maintained detailed logs of Tile repair, maintenance, and installation jobs
  • Determined nature of required repairs by reading work orders, inspecting equipment, and testing systems
  • Stayed ready to handle expected maintenance needs by keeping tools organized and optimal supply of spare parts
  • Worked effectively with diverse team to accomplish daily objectives and meet long-term goals
  • Maintained full compliance with legal, health, and safety regulations
  • Kept all areas clean, organized and in line with company professional standards

Working Superintendent

AVS Flooring
10.2004 - 02.2012
  • Oversaw work of 18-20 + employees each day, monitoring activities and assigning tasks to cover demands
  • Verified employee performance, checking each job and retraining or disciplining to correct problems
  • Handled high workload by being organized with various assignments, deadlines, and instructions
  • Sealed pores with waterproof compounds and filled cracks with plaster, putty, or grout
  • Cleaned and prepared base surfaces, removing imperfections and debris
  • Helped team handle high-volume work by prioritizing tasks and organizing supplies

Education

High School Diploma -

Trevor G. Brown
Phoenix, AZ
05.2002

Skills

  • System Installation
  • Electrical Wiring
  • OSHA Compliance
  • Leak Testing
  • Power Tools Operation
  • Hardwood installation
  • Waterproofing systems
  • Grout application
  • Material Estimation
  • Tile Installation
  • Subfloor Preparation
  • Expert Installation

Languages

Spanish
Native or Bilingual
English
Full Professional

Timeline

HVAC Installer ( Brazer)

CMK Heating and Cooling
01.2024 - Current

Remodeler

Echo Dry Restoration
11.2020 - 08.2023

Foreman

Foley Tile LLC.
01.2018 - 10.2020

Installation Contractor

DaVinci Custom Tile and Stone
05.2012 - 12.2018

Working Superintendent

AVS Flooring
10.2004 - 02.2012

High School Diploma -

Trevor G. Brown
Ricardo Barron