Summary
Overview
Work History
Education
Skills
Accomplishments
Certification
Languages
Timeline
Generic

Ricardo Gonzalez

South Houston,TX

Summary

Dynamic Pipefitter Foreman with a proven track record at S&B Infrastructure, adept at reducing project timelines through effective team management and innovative technologies. Skilled in pipefitting and fabrication, I prioritize safety while delivering exceptional results, demonstrating strong leadership and a commitment to quality in every project.

Overview

3
3
years of professional experience
1
1
Certification

Work History

Pipefitter Foreman

S&B Infrastructure
09.2023 - 04.2025
  • Performed quality assurance checks regularly identifying potential issues early allowing for swift corrective action minimizing negative impacts on overall timelines.
  • Reduced project timeline for pipefitting projects by effectively managing team assignments and schedules.
  • Implemented cutting-edge technologies to enhance productivity and streamline project workflows.
  • Coordinated pre-construction meetings facilitating efficient planning discussions between stakeholders involved critical to successful project execution.

Pipefitter

S&B Contractors And Engineers
12.2022 - 08.2023
  • Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.
  • Threaded pipes using piping machines.
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
  • Fabricated pipe sections and components to specification using cutting, threading and welding equipment.
  • Promoted a safe work environment by adhering to company safety policies and procedures at all times during pipefitting operations.
  • Contributed to overall company success by maintaining a strong work ethic, adaptability, and commitment to delivering exceptional service on all projects undertaken.

Pipefitter

UPS Industrial
10.2022 - 11.2022
  • Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.
  • Threaded pipes using piping machines.
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
  • Fabricated pipe sections and components to specification using cutting, threading and welding equipment.
  • Promoted a safe work environment by adhering to company safety policies and procedures at all times during pipefitting operations.

Pipefitter

S&B Industries
05.2022 - 10.2022
  • Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.
  • Threaded pipes using piping machines.
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
  • Fabricated pipe sections and components to specification using cutting, threading and welding equipment.
  • Promoted a safe work environment by adhering to company safety policies and procedures at all times during pipefitting operations.

Education

High School Diploma - Construction & Fabrication

Pasadena Memorial High School
Pasadena, TX
06.2015

Skills

  • Pipefitting
  • Fabricating
  • Management

Accomplishments

  • Achieved Result through effectively helping with Task.
  • Achieved result by completing Task with accuracy and efficiency.

Certification

Pipefitter nccer plus

Languages

English
Native or Bilingual

Timeline

Pipefitter Foreman

S&B Infrastructure
09.2023 - 04.2025

Pipefitter

S&B Contractors And Engineers
12.2022 - 08.2023

Pipefitter

UPS Industrial
10.2022 - 11.2022

Pipefitter

S&B Industries
05.2022 - 10.2022

High School Diploma - Construction & Fabrication

Pasadena Memorial High School
Ricardo Gonzalez