Highly productive Journeyman Electrician known for high production and efficiency in task completion. Specialize in electrical installations, troubleshooting, and maintenance with strong knowledge of safety protocols. Key skills include blueprint reading, wiring layout design,strong work ethicss and electrical system repair. Great communication skills problem-solving, and time management to ensure projects are completed on schedule. Focused on success and achieving great craftsmanship to our team. Always dedicated and quickly adapt to new challenges.
Overview
8
8
years of professional experience
Work History
Journeymen Electrician
Midstream Industrial Controls
Channelview , Texas
04.2022 - 12.2024
Installed, maintained and repaired Electrical systems equipment and Instruments
Read blueprints and P&ID to determine the layout details of a particular job
Successfully installed Disconnects Junction box/panels and PLC cabinets
Installed and fabricated 3/4 to 2" ridgid conduit for system
Replaced faulty switches, outlets, receptacles, circuit breakers when necessary
Installed level switches, level indicators, temperature transmitters and Pressure transmitter Instruments
Determine correct wire/cable footage for system
Pulled insulated cables into correct conduits and cable tray routes
Point to point continuity verification before terminating system
Terminate Power and control cables on proper landing points as shown on blueprints and P&IDs with correct phasing and visible correct tags
Tested electrical systems and circuit continuity using ohmmeters, voltmeters and meggers
Follow safety protocol and procedures for LOCKOUT/TAGOUT
Used hand tools and power tools such as bandsaw, knock out set, 535, Chicago benders,greenlee 555. Drills and 1000v rated insulated hand tools
Journeymen Electrician
Burns and Mcdonnell
Appleton, Wisconsin
06.2020 - 04.2022
Read blueprints or schematic diagrams to determine the layout of job scope
Planned layout and installation of wiring and fixtures based on project specifications and building codes.
Installed various lighting systems, and basic control systems
Assisted with new installation and upgrades of plant equipment.
MCC Power and controls Terminations
Installed 120/480v systems
Installed and Terminated low-medium voltage switchgear
Continuity point to point Verification before terminating
Megged all power cables 1000v for 1 minute duration
3 phase motor Terminations
Follow all LOTO safety protocols and procedures before energizing any system
Journeymen Electrician
ETEC Industrial services
Portland, Texas
01.2017 - 05.2020
Installed conduit systems, various lighting systems, and basic control systems
Read blueprints or schematic diagrams to determine the layout of a particular job scope
Pull correct size insulated wires into correct Electrical equipment
Megg 750MCM cables for transformers and switch gears 1000v 1 minute test
Verifying point to point continuity
Assisted with new installation and upgrades of plant equipment.
Terminate 240V-480V 3 phase transformers
Fabricated and installed 1 1/2" - 5" plasti bond pipe into duct bank
Troubleshoot electrical issues on equipment up to 480V
Repaired light fixtures, outlets,receptacles, relays and circuit breakers breakers panels based on detailed evaluations
Effective and respectful communication and interaction with other employees, supervisors and plant client