Summary
Overview
Work History
Education
Skills
Additional Information
Timeline
Generic
Ricardo Montalvo

Ricardo Montalvo

Coordinator
Alamo,TX

Summary

Proactive and bilingual Boilermaker offering supervisory experience and excellent problem-solving skills. Looking to bring a successful background in hydro, boltup's, tower's and exchanger installation expertise to increase a company's services and market share. Reliable Foreman with more than 18 years of construction site experience. Project oversight, team management and blueprint interpretation skills. Bilingual and successful in meeting tight job deadlines.

Overview

19
19
years of professional experience

Work History

Boilermaker

UPS Industrial
Deerpark , Tx
11.2023 - 01.2024
  • Dismantled equipment or devices to gain access and remove defective parts or components.
  • Inspected and lubricated valves; removed, replaced, or installed components to correct operating deficiencies.
  • Maintained compliance with all safety procedures from both client and employer.
  • Tightened or replaced bolts and gaskets to repair leaks.
  • work on heaters,drum,pumps,blinding,exchanger, hydro
  • Utilized specialized tools and machinery to complete repairs and installation.

Boilermaker Supervisor

Repcon Industrial
Deer park , Tx
12.2022 - 11.2023
  • Managed efficient teams of up to 10 employees.
  • Monitored daily progress and work quality to provide guidance and direction to mechanics and installers.
  • Coordinated movement of materials and equipment to job sites.
  • Inspected equipment and structures to determine scope of work (SOW).
  • Measured old structural parts or assemblies to determine dimensional requirements of replacements parts.
  • Monitored equipment, tools and system upgrades to compile data into detailed reports for upper management.
  • Interpreted blueprints, sketches, and specifications for each job.
  • Supervised team of installers and mechanics to complete work on time and to company standards.
  • Identified mechanical problems and determined best solutions for correction.

Boilermaker general Forman

S&B Engineering
Deerpark, Tx
08.2019 - 11.2022
  • Inspected and lubricated valves; removed, replaced, or installed components to correct operating deficiencies.
  • Dismantled equipment or devices to gain access and remove defective parts or components.
  • Interpreted blueprints, sketches, and specifications for each job.
  • Tightened or replaced bolts and gaskets to repair leaks.
  • Coordinated movement of materials and equipment to job sites.
  • Cleaned and maintained boilers and associated equipment to increase efficiency and performance level.
  • Assembled and installed boilers, tanks and vats according to blueprints and specifications.

Pipe supervisor

RCS Industrial
Pasadena , TX
01.2019 - 06.2019
  • Applied strong leadership talents and problem-solving skills to maintain team efficiency and organize workflows.
  • Gathered, organized and input information into digital database.
  • Maintained overall safe work environment with employee training programs and enforcement of safety procedures.
  • Devised and implemented processes and procedures to streamline operations.
  • Conducted regular reviews of operations and identified areas for improvement.
  • Improved office operations by automating client correspondence, record tracking and data communications.

Boilermaker Foreman

Brown & Root Industrial Services
Deer park , Tx
08.2018 - 11.2018
  • Inspected and lubricated valves; removed, replaced, or installed components to correct operating deficiencies.
  • Identified issues and addressed each immediately.
  • Dismantled equipment or devices to gain access and remove defective parts or components.
  • Removed boiler casings, grades, handrails, manhole, and hole covers to facilitate access to boilers or other vessels for repair.
  • Tightened or replaced bolts and gaskets to repair leaks.
  • Managed efficient teams of up to 10 employees.

Field Supervisor

Able Industrial
La Porte , Tx
01.2013 - 06.2018
  • Investigated issues and developed effective solutions.
  • Planned and scheduled field activities according to set timelines and order of operations.
  • Met with customers to resolve issues and build productive relationships.
  • Evaluated performance and progress, and made proactive adjustments.

Boilermaker

Timec industrial
Pasadena , Tx
12.2011 - 01.2013
  • Interpreted blueprints, sketches, and specifications for each job.
  • Built and repaired process tanks, storage tanks and water treatment tanks.
  • Identified issues and addressed each immediately with job foreman.
  • Used hand signals to notify crane operator to lift components to specific positions.
  • Assembled and analyzed towers,exchanges,drums,pumps,vessels

Boilermaker

Turn2 Specialty Companies
Baytown, Tx
02.2024 - Current
  • Utilized specialized tools and machinery to complete repairs and installation.
  • Measured old structural parts or assemblies to determine dimensional requirements of replacements parts.
  • Maintained compliance with all safety procedures from both client and employer.
  • Assembled and installed boilers, tanks and vats according to blueprints and specifications.
  • Used hand signals to notify crane operator to lift components to specific positions.
  • Tightened or replaced bolts and gaskets to repair leaks.
  • blind equipment for entry drums,Towers,heaters
  • hydro piping & bolting up equipment for final

Boilermaker

Petrochem Field Services Inc
Humble, TX
10.2010 - 12.2011
  • Arranged and stored materials, machines, tools and equipment.
  • Accurately read blueprints and repair manuals to identify mechanical problems and fix them.
  • Ensured that all boiler valves and gauges had been installed correctly by assessing completed work.
  • Replaced parts that were defective when boilers were not functioning properly.
  • Inspected and lubricated valves; removed, replaced, or installed components to correct operating deficiencies.
  • Dismantled equipment or devices to gain access and remove defective parts or components.
  • Identified issues and addressed each immediately with job foreman.

Insulator/Foremen

Hales & Associates
Greensboro, NC
04.2006 - 04.2010
  • Prepared insulation and other materials prior to beginning each project, placing a focus on efficiency and waste reduction.
  • Measured and marked dimensions of work materials and surfaces using tools such as scribes, dividers, squares and rulers.
  • Affixed insulation to exposed surfaces of equipment as directed.
  • Demonstrated a thorough understanding of and skill for insulation preparation and installations.
  • Repaired, removed or applied insulation on industrial and mechanical equipment including heat exchangers, tanks and pumps.

Education

Boilermaker V4 NCCER Plus # 8773966

Basic Rigging Nccer Plus #8773966

Skills

  • Cutting and threading
  • Installation and inspection
  • Hand and power tools
  • Problem resolution
  • Team building
  • Safety oversight
  • Job site management
  • Team management

Additional Information

Marty knight 832-262-6336 General Foreman

Carlos Villarreal 956-499-8866 GF

Ronnie Thompson 601-669-0206 Superintendent

Rudy Castro 910-214-9307 Superintendent

Timeline

Boilermaker

Turn2 Specialty Companies
02.2024 - Current

Boilermaker

UPS Industrial
11.2023 - 01.2024

Boilermaker Supervisor

Repcon Industrial
12.2022 - 11.2023

Boilermaker general Forman

S&B Engineering
08.2019 - 11.2022

Pipe supervisor

RCS Industrial
01.2019 - 06.2019

Boilermaker Foreman

Brown & Root Industrial Services
08.2018 - 11.2018

Field Supervisor

Able Industrial
01.2013 - 06.2018

Boilermaker

Timec industrial
12.2011 - 01.2013

Boilermaker

Petrochem Field Services Inc
10.2010 - 12.2011

Insulator/Foremen

Hales & Associates
04.2006 - 04.2010

Boilermaker V4 NCCER Plus # 8773966

Basic Rigging Nccer Plus #8773966
Ricardo MontalvoCoordinator