Summary
Overview
Work History
Education
Timeline
Generic

Richard Butler

Deer Park,TX

Summary

*Well-versed in testing connections, repairing components and charging refrigeration systems. Demonstrated success in working alone or as part of a team to complete refrigeration maintenance, repairs and installations quickly and accurately.

*Proficient Quality Control Inspector adept at completing both destructive and non-destructive testing of materials and finished products. Versed in documentation and reporting as well as process improvements. Over 14 years of experience in quality inspection chemical environments supporting quality improvements and reducing errors.

Overview

14
14
years of professional experience

Work History

HVAC

Self Employed
12.2019 - 10.2023
  • Removed old equipment from customers' homes and cleaned up areas to prepare for new installations.
  • Assembled air ducts, pipes, discharge valves and flues to central heating and cooling equipment.
  • Installed components to improve HVAC system performance.
  • Utilized pressure gauges and soap-and-water solutions to test pipe and tubing joints for leaks.
  • Designed HVAC systems and specified components for successful installation and operation

Pipe Welder/QC Welding Inspector

ETS
03.2019 - 12.2019
  • Inspected incoming and outgoing materials for accuracy and quality.
  • Communicated with production team members about quality issues.
  • Inspected quality of products, taking note of functionality, appearance and other specifications.
  • Performed visual inspections and non-destructive tests where appropriate.

Pipe Foreman

Saulsbury Industries
01.2018 - 05.2018
Read prints, troubleshoot problems, direct manpower, and report progress and completion percentages. map out welds, fill out weld reports, time sheets, fill out rod slips.

Pipe Fitter/foreman

L-Con Constructors Personnel
01.2017 - 01.2018
read isos, cut weld, fit, grind, field measurement's, field route pipe, Read prints, troubleshoot problems, direct manpower, and report progress and completion percentages. map out welds, fill out weld reports, time sheets, fill out rod slips.

Pipe Qc Inspector

APTIM
10.2016 - 01.2017

Get permits, Read prints, troubleshoot problems, direct manpower, and report progress and completion percentages. map out welds, fill out weld reports, Ensure that Contractor personnel attend Safety Talk prior work commencement and adhere to all relevant local HSE requirements/procedures. Ensure that relevant PPE is used. Review piping and mechanical work-pack Documentation Requirements for Installation, Fabrication, Testing and Inspection to ensure that all the verifications have been carried out and the appropriate check list been completed and signed off properly; Review specifications, codes, standards, procedures and verify where exceptions are taken together with the necessary engineering approval sign off. Ensure all referenced documents (latest revisions) are included in the work pack and that the Installation/Fabrication Contractor understands and complies with the requirements for specification and quality

Pipefitter

Ohmstede Industrial
08.2016 - 10.2016
cut, grind, weld, bevel, layout saddles, dummy legs, Read prints, troubleshoot problems, direct manpower, and report progress and completion percentages. map out welds, fill out weld reports, time sheets, fill out rod slips.

Pipe Foreman

KBR Recruitment
05.2016 - 08.2016
Read prints, troubleshoot problems, direct manpower, and report progress and completion percentages. map out welds, fill out weld reports, time sheets, fill out rod slips.

QC Inspector

Saulsbury Industries
11.2015 - 05.2016

Read prints, troubleshoot problems, direct manpower, and report progress and completion percentages. map out welds, fill out weld reports, time sheets. Monitor suppliers/contractors works for compliance to ensure that all required NDT examination are carried out by the contractor in accordance to the approved ITP, review and approve the reports issued. Ensure that the respective NDT level inspectors witness UT and review Radiographic films where required by the ITP ensuring that NDT results meet the specified requirements. Coordinate and inspect the piping mechanical arrangement and alignment are inline with the design parameters definition requirements. Monitor the final visual and dimensional checks of completed piping systems; Attend hydro testing of piping and mechanical systems and sub-systems. Coordinate and review the work pack completion inspection and documentation required for final acceptance and contract close out. Where requirements for Punch Listing ensue, develop work pack Punch List close out. Ensure that the mechanical completion dossier is duly completed.

Pipe Foreman

Performance Contractors
08.2014 - 11.2015
Read prints, troubleshoot problems, direct manpower, and report progress and completion percentages. map out welds, fill out weld reports, time sheets, fill out rod slips. pull permits do JLG training, 

Pipefitter / fabicator

S&B Engineering Morgan's Point Office
04.2014 - 08.2014
bolt up torque, fit pipe, layout grind pipe, cut pipe, tack pipe, build pipe supports, 

Pipe QC Inspector

Tellepsen Industrial
01.2014 - 04.2014

Monitor suppliers/contractors works for compliance to ensure that all required NDT examination are carried out by the contractor in accordance to the approved ITP, review and approve the reports issued. Ensure that the respective NDT level inspectors witness UT and review Radiographic films where required by the ITP ensuring that NDT results meet the specified requirements. Coordinate and inspect the piping mechanical arrangement and alignment are inline with the design parameters definition requirements. Monitor the final visual and dimensional checks of completed piping systems; Attend hydro testing of piping and mechanical systems and sub-systems. Coordinate and review the work pack completion inspection and documentation required for final acceptance and contract close out. Where requirements for Punch Listing ensue, develop work pack Punch List close out. Ensure that the mechanical completion dossier is duly completed.

lead pipefitter

H&M industrial
10.2012 - 12.2013
Read prints, troubleshoot problems, direct manpower, and report progress and completion percentages. map out welds, fill out weld reports, time sheets, fill out rod slips.

Pipefitter Helper /pipefitter /foreman

APTIM
06.2009 - 10.2012
Read prints, troubleshoot problems, direct manpower, and report progress and completion percentages. map out welds, fill out weld reports, time sheets, fill out rod slips.

Education

Diploma - Process Technology

Lee College
Baytown, TX
08.2010

High School Diploma - process tech

Dayton High School
Dayton, TX
2009

Timeline

HVAC

Self Employed
12.2019 - 10.2023

Pipe Welder/QC Welding Inspector

ETS
03.2019 - 12.2019

Pipe Foreman

Saulsbury Industries
01.2018 - 05.2018

Pipe Fitter/foreman

L-Con Constructors Personnel
01.2017 - 01.2018

Pipe Qc Inspector

APTIM
10.2016 - 01.2017

Pipefitter

Ohmstede Industrial
08.2016 - 10.2016

Pipe Foreman

KBR Recruitment
05.2016 - 08.2016

QC Inspector

Saulsbury Industries
11.2015 - 05.2016

Pipe Foreman

Performance Contractors
08.2014 - 11.2015

Pipefitter / fabicator

S&B Engineering Morgan's Point Office
04.2014 - 08.2014

Pipe QC Inspector

Tellepsen Industrial
01.2014 - 04.2014

lead pipefitter

H&M industrial
10.2012 - 12.2013

Pipefitter Helper /pipefitter /foreman

APTIM
06.2009 - 10.2012

Diploma - Process Technology

Lee College

High School Diploma - process tech

Dayton High School
Richard Butler