Seasoned General Foreman with over 30 years of experience in the Mechanical Insulation industry. Strong analytical and communication skills with in-depth understanding of documentation, safety and inventory needs. Focused on working with accuracy and efficiency to control costs and satisfy project requirements.
Overview
30
30
years of professional experience
Work History
General Foreman
Insulation Contracting & Supply
06.1989 - 06.2019
Supervised daily operations and workflow management across multiple on site insulation projects.
Coordinated scheduling and resource allocation to optimize project efficiency.
Trained and mentored Apprentices on safety protocols and installation techniques.
Implemented quality control measures to ensure compliance with industry standards.
Liaised between field engineers and trade workers align construction projects with drawings and specifications.
Kept teams properly supplied with materials, tools, plans and supplementary assistance to meet project deadlines.
Ordered necessary supplies and materials required for installation of new work and remodeling of existing systems.
Collaborated with subcontractors for seamless coordination of work scopes, ensuring smooth project execution from start to finish.
Reviewed blueprints, specifications and drawings to fully understand project scope ahead of time.
Showcased exceptional adaptability when faced with unexpected project challenges, rapidly adjusting strategies and reallocating resources to maintain progress and minimize delays.
Delivered project updates to superintendent and detailed issues that could halt work progress.
Improved project efficiency by effectively delegating tasks and managing a team of skilled workers.
Demonstrated strong leadership abilities in managing diverse teams to achieve common goals while fostering a positive work environment.
Enhanced job site safety through regular inspections, hazard assessment, and implementation of corrective measures.
Achieved timely completion of projects with strict adherence to budget constraints and quality standards.
Completed final walkthroughs at job sites to close out projects.
Performed job safety analysis on daily basis to mitigate risks for all workers and visitors to job sites.
Worked alongside team to accomplish work goals according to schedule.
Streamlined communication between teams, enhancing collaboration and project outcomes.
Collaborated with project managers to develop strategies for cost-effective solutions.
Conducted regular inspections to assess work quality and adherence to specifications.
Resolved on-site issues promptly, maintaining project timelines and minimizing disruptions.
Assigned daily duties to each employee based upon individual strengths.
Analyzed blueprints to look ahead for material needed
Contributed to company growth by consistently delivering exceptional results, leading to repeat business opportunities from satisfied clients.
Maintained cost-effective inventory of spare parts to help achieve production goals.
Prepared daily time cards and assisted in preparation of estimates and scope of work statements.
Elevated team morale through the implementation of effective recognition programs that acknowledged outstanding individual contributions.
Inspected completed work to verify quality standards and compliance with criteria.
Checked equipment to determine if maintenance was required.
Reviewed project details to specify correct materials and equipment for job sites.
Oversaw daily operations at site, keeping team production moving at optimal pace.
Investigated and reported on accidents, injuries and near-miss incidents.
Provided feedback to workers on job performance and safety procedures.
Prepared and submitted reports on job progress and safety conditions to upper management.
Administered disciplinary actions to workers violating safety regulations and company policies.