Summary
Overview
Work History
Education
Skills
References
Timeline
Generic

Richard Ellis

Vancouver,WA

Summary

With 30+ years of experience in the scaffold industry I bring a strong and safe work ethic. Can communicate well with customers and craft leaders to evaluate the most effective and efficient access needs in all aspects of the industry. Proficient with most systems of scaffolding. Frame, modular, shoring, swingstage. Knowledgeable professional offering experience and abilities in completing frameworks for structural construction jobs. Bright and detail-oriented in calculating accurate measurements. Focused on safety by keeping work areas neat, following protocols, using equipment and tools appropriately and warning teammates of potential hazards. Detailed General Foreman skillful in planning and executing jobs, hiring crew, organizing supplies and monitoring performance. Knowledgeable about safety procedures, equipment operation and documentation requirements. Valid Washington state license with clean driving record.

Overview

34
34
years of professional experience

Work History

Carpenter General Foreman

BMWC Constructors
01.2023 - 04.2024
  • Heavy Industrial building scaffold in gas, solar, and coal fired power plants, chemical plants, oil and gas refineries and tech industries throughout the MidAtlantic, Midwest, Western, and South Western U.S
  • Working on the many projects, expansions, and maintenance that keep Intel Oregon's leading edge manufacturing plant on the forefront of their industry.

Scaffold General Foreman

SDB
08.2020 - 08.2022
  • Facilitated smooth transitions between project phases by ensuring timely dismantling of scaffolds and seamless handoffs to other trade crews.
  • Increased project efficiency by coordinating with cross-functional teams to ensure smooth scaffolding installations and dismantling processes.
  • Coordinated closely with project managers to develop accurate estimates for scaffolding needs on various construction sites.
  • Optimized scaffold utilization by developing detailed erection plans, minimizing waste of materials and resources.
  • Enhanced job site safety by implementing strict scaffold inspection protocols and conducting regular audits.
  • Reduced downtime on projects by effectively managing labor resources and ensuring timely completion of tasks.
  • Mentored junior foremen, imparting valuable industry knowledge and best practices to the next generation of leaders in the field.
  • Adapted quickly to changing project requirements, demonstrating flexibility in adjusting plans accordingly without compromising safety or quality standards.
  • Maintained excellent client relationships by addressing concerns promptly and providing exceptional customer service throughout projects.
  • Evaluated new scaffolding technologies and systems, incorporating innovative solutions that increased efficiency and reduced labor costs.
  • Ensured compliance with OSHA regulations, maintaining a safe work environment for all employees.
  • Conducted thorough training sessions for new hires on safe work practices specific to scaffolding operations.
  • Enforced company policies regarding safety procedures and personal protective equipment use among workers onsite.
  • Assembled, erected and dismantled scaffolding structures to meet project needs.
  • Disassembled scaffolding and equipment when projects were completed or after each shift according to strict schedules.
  • Verified all scaffolding materials were stored safely and securely.
  • Followed OSHA regulations and safety standards when installing and working with scaffolding.
  • Assisted with tying off and securing scaffolding to building structures to optimize safety.
  • Worked in team-focused environment to collaboratively complete projects on time and within budget.
  • Safely installed and dismantled scaffolding from aerial lifts and larger lifts.
  • Trained new employees on proper safety procedures for working on scaffolding.
  • Inspected scaffolding for safety and structural integrity before each use.
  • Utilized problem-solving skills to troubleshoot and resolve issues with scaffolding structures.
  • Utilized ladders, small lifts and rope access systems to safely access hard-to-reach areas.
  • Assembled and disassembled tiered seating for public events.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Inspected equipment and tools used for safe operation.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.
  • Directed projects according to schedule and quality demands.
  • Prepared and submitted reports on job progress and safety conditions to upper management.
  • Provided feedback to workers on job performance and safety procedures.
  • Developed and maintained positive relationships with clients and other stakeholders.
  • Created and implemented plans to maximize efficiency of workers.
  • Administered disciplinary actions to workers violating safety regulations and company policies.
  • Supervised training of new construction and extraction workers on safety practices and procedures.
  • Evaluated and updated safety protocols to reduce risks on construction and extraction sites.
  • Investigated and reported on accidents, injuries and near-miss incidents.
  • Established and enforced safety regulations, procedures and standards for construction and extraction workers.
  • Devised and implemented safety protocols to reduce risks on construction and extraction sites.

Scaffold Coordinator

Safway
08.2009 - 08.2020
  • Planned each job with appropriate safety measures, addressing weight limits and fall protection.
  • Facilitated clear communication among team members, resulting in improved coordination and efficiency during scaffold assembly.
  • Managed budgetary constraints by accurately estimating materials needed for each project and reducing waste through efficient planning processes.
  • Established a culture of continuous improvement by consistently reviewing processes and implementing new techniques to enhance overall performance.
  • Optimized labor distribution based on individual skill sets leading to increased overall team performance.
  • Promoted a positive work environment by addressing conflicts quickly and fairly, leading to high employee satisfaction rates among crew members.
  • Improved scaffold stability with diligent inspection of connections, supports, and bracing systems.
  • Tracked supplies, employee hours and costs.
  • Maximized crew productivity by effectively delegating tasks based on individual strengths and abilities.
  • Decreased accidents on the job site by enforcing strict safety protocols and providing ongoing training for team members.
  • Maintained strong relationships with suppliers ensuring prompt delivery of materials at competitive prices.
  • Enhanced worksite safety by conducting thorough inspections and addressing potential hazards.
  • Collaborated with project managers to develop detailed plans for scaffolding requirements, ensuring proper support for construction projects.
  • Maintained accurate inventory of materials, ensuring timely delivery to job sites and minimizing downtime.
  • Completed projects ahead of schedule with effective time management skills and efficient resource allocation.
  • Exceeded client expectations by delivering high-quality scaffolding solutions that met specific requirements in a timely manner.
  • Increased customer satisfaction levels by successfully handling client concerns and providing timely updates on project progress.
  • Ensured compliance with OSHA regulations through regular training sessions and adherence to safety guidelines.
  • Coordinated job schedules and bids to maximize work and revenue.
  • Streamlined scaffold assembly process for increased efficiency and reduced project timelines.
  • Mentored junior team members in scaffold construction techniques, fostering professional growth within the team.
  • Saved company resources through accurate estimation of materials required for each project while minimizing waste.
  • Assembled, erected and dismantled scaffolding structures to meet project needs.
  • Disassembled scaffolding and equipment when projects were completed or after each shift according to strict schedules.
  • Followed OSHA regulations and safety standards when installing and working with scaffolding.
  • Verified all scaffolding materials were stored safely and securely.
  • Assisted with tying off and securing scaffolding to building structures to optimize safety.
  • Worked in team-focused environment to collaboratively complete projects on time and within budget.
  • Safely installed and dismantled scaffolding from aerial lifts and larger lifts.
  • Built custom scaffolding structures to specifications for diverse applications.
  • Trained new employees on proper safety procedures for working on scaffolding.
  • Inspected scaffolding for safety and structural integrity before each use.
  • Utilized problem-solving skills to troubleshoot and resolve issues with scaffolding structures.
  • Utilized ladders, small lifts and rope access systems to safely access hard-to-reach areas.
  • Assembled and disassembled tiered seating for public events.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.
  • Prepared and submitted reports on job progress and safety conditions to upper management.
  • Directed projects according to schedule and quality demands.
  • Provided feedback to workers on job performance and safety procedures.
  • Developed and maintained positive relationships with clients and other stakeholders.
  • Devised and implemented safety protocols to reduce risks on construction and extraction sites.
  • Assisted in recruiting and hiring new construction and extraction workers.
  • Communicated with stakeholders on job milestones.

Scaffold Foreman

Vertical Access Solutions
08.2006 - 08.2009
  • Planned each job with appropriate safety measures, addressing weight limits and fall protection.
  • Enhanced worksite safety by conducting thorough inspections and addressing potential hazards.
  • Mentored junior team members in scaffold construction techniques, fostering professional growth within the team.
  • Maintained strong relationships with suppliers ensuring prompt delivery of materials at competitive prices.
  • Facilitated clear communication among team members, resulting in improved coordination and efficiency during scaffold assembly.
  • Managed budgetary constraints by accurately estimating materials needed for each project and reducing waste through efficient planning processes.
  • Maintained accurate inventory of materials, ensuring timely delivery to job sites and minimizing downtime.
  • Collaborated with project managers to develop detailed plans for scaffolding requirements, ensuring proper support for construction projects.
  • Optimized labor distribution based on individual skill sets leading to increased overall team performance.
  • Maximized crew productivity by effectively delegating tasks based on individual strengths and abilities.
  • Increased customer satisfaction levels by successfully handling client concerns and providing timely updates on project progress.
  • Improved scaffold stability with diligent inspection of connections, supports, and bracing systems.
  • Decreased accidents on the job site by enforcing strict safety protocols and providing ongoing training for team members.
  • Completed projects ahead of schedule with effective time management skills and efficient resource allocation.
  • Exceeded client expectations by delivering high-quality scaffolding solutions that met specific requirements in a timely manner.
  • Ensured compliance with OSHA regulations through regular training sessions and adherence to safety guidelines.
  • Established a culture of continuous improvement by consistently reviewing processes and implementing new techniques to enhance overall performance.
  • Inspected scaffold erections for condition and compliance with standards.
  • Streamlined scaffold assembly process for increased efficiency and reduced project timelines.
  • Promoted a positive work environment by addressing conflicts quickly and fairly, leading to high employee satisfaction rates among crew members.
  • Assembled, erected and dismantled scaffolding structures to meet project needs.
  • Disassembled scaffolding and equipment when projects were completed or after each shift according to strict schedules.
  • Verified all scaffolding materials were stored safely and securely.
  • Followed OSHA regulations and safety standards when installing and working with scaffolding.
  • Assisted with tying off and securing scaffolding to building structures to optimize safety.
  • Worked in team-focused environment to collaboratively complete projects on time and within budget.
  • Safely installed and dismantled scaffolding from aerial lifts and larger lifts.
  • Inspected scaffolding for safety and structural integrity before each use.
  • Built custom scaffolding structures to specifications for diverse applications.
  • Trained new employees on proper safety procedures for working on scaffolding.
  • Utilized problem-solving skills to troubleshoot and resolve issues with scaffolding structures.
  • Utilized ladders, small lifts and rope access systems to safely access hard-to-reach areas.
  • Assembled and disassembled tiered seating for public events.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Inspected equipment and tools used for safe operation.
  • Prepared and submitted reports on job progress and safety conditions to upper management.
  • Directed projects according to schedule and quality demands.
  • Provided feedback to workers on job performance and safety procedures.
  • Developed and maintained positive relationships with clients and other stakeholders.
  • Administered disciplinary actions to workers violating safety regulations and company policies.

Journeyman Scaffold Builder

NW Scaffolding
01.2005 - 08.2006
  • Optimized scaffold dismantling procedures by utilizing appropriate tools and methods, resulting in reduced labor costs and increased efficiency.
  • Garnered recognition for exceptional craftsmanship through the consistent delivery of high-quality scaffold construction within allotted time frames.
  • Enhanced job site safety by meticulously constructing and dismantling scaffolding structures according to industry standards.
  • Strengthened teamwork dynamics through active participation in training sessions focused on improving technical knowledge within the crew.
  • Demonstrated versatility in constructing diverse types of scaffolds such as suspended, rolling, tube-and-coupler systems for various projects needs.
  • Mitigated risk levels at the worksite by strictly adhering to OSHA guidelines while performing tasks involving heights or hazardous materials exposure.
  • Minimized project delays through proactive identification of potential issues or hazards relating to the scaffolding system.
  • Facilitated smooth communication between team members through clear direction on project goals and expectations during scaffold builds.
  • Implemented cost-effective solutions by selecting appropriate materials for each project based on budget constraints and specific requirements.
  • Contributed to company reputation for excellence in service with consistent attention to detail when assembling complex scaffold configurations.
  • Reduced construction time by efficiently collaborating with team members on scaffold erection and maintenance tasks.
  • Ensured project deadlines were met by coordinating with contractors, architects, and engineers on scaffold requirements.
  • Elevated client satisfaction rates with timely installation of weather protection systems such as tarps or canopies on scaffolding structures.
  • Increased worker productivity by consistently providing secure platforms for various construction tasks.
  • Showcased expertise in rigging equipment use, ensuring safe lifting procedures during material handling processes.

Ivy Hi Lift
01.1998 - 11.2004
  • Commercial, and Residential scaffold, began estimating.

Scaffold Foreman

Ivy Hi Lift
09.1995 - 10.1998
  • Erect, Modify, Dismantle Industrial, Commercial, and Residential Systems scaffold, frame scaffold, shoring, motorized platforms.
  • Install, implement, and use fall arrest systems.
  • Design and Estimate scaffold as requested by customers.

Carpenter Leadman

Cascade General
08.1990 - 08.1995
  • Erect, Dismantle, modify scaffold for all crafts involved with the maintenance, repair, refitting, or conversion of any marine ships, vessels, or submarines
  • Build or supply all weather protection associated with the work.
  • Install, implement, and use fall arrest and fall protection systems.

Education

Skills

  • Framing Construction
  • Worksite safety
  • Finish Carpentry
  • Hand and power tools
  • Valid State driver's license
  • Blueprint Reading
  • Commercial construction experience
  • Structural Repairs
  • Client Communication
  • Project Planning
  • Scaffolding Setup
  • Blueprint Interpretation
  • Project Management
  • Scaffolding construction
  • Project estimation and bidding
  • OSHA Regulations
  • Staff Management
  • Construction background
  • Flexible and Adaptable
  • Heavy Lifting
  • Safety Procedures
  • Team Coordination
  • Safety Compliance
  • Decision Making and Prioritization
  • Power Tool Maintenance and Care
  • Site Maintenance
  • Commercial and residential jobs
  • Lumber Cutting
  • Physical Stamina
  • Demolition and Cleanup
  • Interpreting Blueprints
  • OSHA Compliance

References

  • Dean Courser, PCI scaffold, Kent, WA (206)327-0046
  • Aaron Nicholson, Vertical Access Solutions, Pittsburg, PA, (412)787-9102
  • John Sullivan, Vigor shipyard, Portland, OR. (503)807-6448

Timeline

Carpenter General Foreman

BMWC Constructors
01.2023 - 04.2024

Scaffold General Foreman

SDB
08.2020 - 08.2022

Scaffold Coordinator

Safway
08.2009 - 08.2020

Scaffold Foreman

Vertical Access Solutions
08.2006 - 08.2009

Journeyman Scaffold Builder

NW Scaffolding
01.2005 - 08.2006

Ivy Hi Lift
01.1998 - 11.2004

Scaffold Foreman

Ivy Hi Lift
09.1995 - 10.1998

Carpenter Leadman

Cascade General
08.1990 - 08.1995

Richard Ellis