Summary
Overview
Work History
Education
Skills
Professional Licenses And Societies
Position Held
Certification
Accomplishments
Affiliations
Timeline
Generic

RICHARD WOOCKMAN

Senior Project Manager
Chapin,SC

Summary

Extensive experience in the electrical power generation field including Senior Project Management of Nuclear Plant Construction and Startup, Fossil, Gas-Turbine and Emergency Diesel power plants and associated systems. Recent Project Management Oversight of two (2) AP1000 Nuclear Generating Units including Construction and Startup Testing through commercial operation. Restart of several Nuclear Electrical Generating Facilities and a Nuclear Fuel Fabrication Facility. Site Security upgrades to a Nuclear Facility. Digital Control System upgrades for robotic equipment and automation. Senior Project Manager bringing highly credible technical leadership to direct multi-functional project teams engaged in full system development and implementation in high tech environments. Experienced overseeing diverse teams of developers, analysts and quality professionals engaged in complex projects with budgets up to $750 million. Solid understanding of project management tools. Project Management Professional and certified green belt in Six Sigma methodology.

Overview

44
44
years of professional experience
1
1
Certification

Work History

Senior Project Manager Oversight for Georgia Power Corporation

Vogtle Unit 3 & 4
Waynesboro, Ga
11.2019 - 12.2023
  • Provide Project Management/Oversight for the Vogtle Units 3&4 AP1000 construction and startup testing activities including Nuclear Island (NI) and Turbine Island (TI) Equipment and Systems
  • Oversight monitoring and assessments (internal and external) related to the installation and testing of Systems to support specific plant Modes and Milestones
  • Oversight included the PLS (Plant Control Systems) and PMS (Plant Monitoring Systems) associated with the Digital hardware and software systems from and to the Main Control Room and Remote Shutdown Room
  • Milestones related to Open/Closed Reactor Vessel Testing; Containment Integrated Local Leak Rate Testing; Passive Core Cooling Testing; Hydro of Reactor Coolant and Secondary Systems and Hot Functional testing to simulate operational parameters without Fuel in the Reactor
  • Oversight of the various Modes including Fuel Receipt and Fuel Load, Modes 6 through 1, various power level testing up through and including Commercial Operation.
  • Liaised between senior management, project team members and clients to ensure effective communication throughout the duration of the project.
  • Identified potential risks associated with projects and developed mitigation strategies.
  • Monitored progress of projects against established timelines and budgets.
  • Created detailed reports on project status, issues, risks and opportunities.
  • Analyzed data from completed projects in order to identify areas for improvement.
  • Evaluated performance metrics for ongoing projects in order to assess progress towards goals.
  • Visited locations to observe operations and determine opportunities to streamline processes and achieve cost reductions.
  • Identified project needs by reviewing project objectives and schedules.
  • Communicated with key stakeholders to determine project requirements and objectives.
  • Produced thorough, accurate and timely reports of project activities.
  • Created project status presentations for delivery to customers or project personnel.

Senior Project Manager for Sintering Furnace Upgrades and Electrical Distribution System Replacement

Columbia Nuclear Fuels Fabrication Facility
Hopkins, SC
05.2018 - 11.2019
  • Provide PM Oversight and Upgrades of Nuclear Fuel Fabrication Equipment and systems
  • Upgrade of electrical distribution systems to provide personnel safety and equipment reliability.
  • Managed project scope, timeline and budget in alignment with company objectives.
  • Developed comprehensive project plans to be shared with stakeholders.
  • Coordinated resources across multiple departments and teams to ensure successful completion of projects.
  • Liaised between senior management, project team members and clients to ensure effective communication throughout the duration of the project.
  • Identified potential risks associated with projects and developed mitigation strategies.
  • Collaborated with stakeholders to develop realistic expectations for deliverables.
  • Monitored progress of projects against established timelines and budgets.
  • Created detailed reports on project status, issues, risks and opportunities.
  • Assessed resource requirements and allocated personnel accordingly.
  • Resolved conflicts between team members in order to maintain productivity levels.
  • Evaluated performance metrics for ongoing projects in order to assess progress towards goals.
  • Enhanced development and drove continuous improvement of project delivery process by providing strong program leadership.
  • Implemented change management processes when issues arose to keep project moving forward and adjust to shifted priorities.
  • Delivered high level of service to clients to extend relationship and encourage further projects.
  • Spearheaded key projects, resulting in high customer satisfaction and increased business revenues.
  • Visited locations to observe operations and determine opportunities to streamline processes and achieve cost reductions.
  • Devised implementation plans and performed cost-benefit and ROI analyses.
  • Conferred with project personnel to identify and resolve problems.
  • Submitted budget estimates, progress reports and cost tracking reports.
  • Created project status presentations for delivery to customers or project personnel.
  • Submitted project deliverables to clients, consistently adhering to quality standards.

Project Manager for Fire Protection and Detection upgrades

Arkansas Nuclear ONE Generating Station
Russelleville, Ar
09.2017 - 04.2018
  • Provide Senior PM Oversight and Upgrades for Fire Protection and Detection Systems to support Nuclear Regulatory Guidelines.
  • Developed comprehensive project plans to be shared with stakeholders.
  • Coordinated resources across multiple departments and teams to ensure successful completion of projects.
  • Liaised between senior management, project team members and clients to ensure effective communication throughout the duration of the project.
  • Monitored progress of projects against established timelines and budgets.
  • Ensured compliance with relevant regulations during all stages of a project's lifecycle.
  • Evaluated performance metrics for ongoing projects in order to assess progress towards goals.
  • Conducted post-project evaluations in order to assess effectiveness of strategies employed.
  • Implemented change management processes when issues arose to keep project moving forward and adjust to shifted priorities.
  • Delivered high level of service to clients to extend relationship and encourage further projects.
  • Visited locations to observe operations and determine opportunities to streamline processes and achieve cost reductions.
  • Brought in additional project personnel and resources to meet demands.
  • Managed project scope, timeline and budget in alignment with company objectives.

Project Manager in (PMO) and Subcontracts Representative

V.C. Summer Nuclear Generating Station
Jenkinsville, S.C.
10.2016 - 08.2017
  • Provide PM Oversight, Installation and testing of new Fire Protection and HVAC Systems and Contracts.
  • Managed project scope, timeline and budget in alignment with company objectives.
  • Developed comprehensive project plans to be shared with stakeholders.
  • Coordinated resources across multiple departments and teams to ensure successful completion of projects.
  • Liaised between senior management, project team members and clients to ensure effective communication throughout the duration of the project.
  • Identified potential risks associated with projects and developed mitigation strategies.
  • Created detailed reports on project status, issues, risks and opportunities.
  • Implemented process improvement initiatives aimed at increasing efficiency within the organization.
  • Resolved conflicts between team members in order to maintain productivity levels.
  • Evaluated performance metrics for ongoing projects in order to assess progress towards goals.
  • Assessed project risks and devised mitigation strategies to avoid potential roadblocks.
  • Oversaw budgets for project, tracked expenses and timelines and communicated with key stakeholders on milestones.
  • Visited locations to observe operations and determine opportunities to streamline processes and achieve cost reductions.
  • Identified project needs by reviewing project objectives and schedules.
  • Communicated with key stakeholders to determine project requirements and objectives.
  • Produced thorough, accurate and timely reports of project activities.
  • Created project status presentations for delivery to customers or project personnel.

Project Manager, Lead Installation Representative, Field Engineer, Test Engineer

Fort Calhoun Nuclear Generating Station
Blair, Nebraska
01.2008 - 10.2016
  • PM oversight of new Containment Internal Structures (Columns and Beams), Security Systems upgrades and modifications to comply with cyber security requirements
  • Turbine Digital Control System upgrades including installation and testing.
  • Conducted regular status meetings with internal teams and external partners to track progress against established milestones.
  • Collaborated closely with senior management on long-term strategic planning initiatives related to projects in development or execution stages.
  • Maintained records of all documents related to each project including specifications, change orders, invoices.
  • Coordinated resources across multiple departments and teams as needed for successful completion of projects.
  • Actively sought out feedback from stakeholders throughout the duration of a project in order to identify areas needing improvement or adjustment.
  • Managed multiple projects with competing deadlines simultaneously.
  • Identified risks associated with each project and developed strategies for mitigating those risks.
  • Built and established strong partnerships with teams, vendors and contractors.
  • Led meetings with internal team members, consultants and contractors.
  • Conducted periodic inspections of job sites for quality and progress.
  • Drove continuous improvement of project delivery process by providing strong leadership.
  • Furnished project updates to various stakeholders, informing on strategy, adjustments and progress.
  • Monitored performance of project team members to provide performance feedback.
  • Conferred with project personnel to identify and resolve problems.
  • Created project status presentations for delivery to customers or project personnel.

Project Manager

Palo Verde Nuclear Generating Station
Wintersburg, Az
06.2000 - 12.2007
  • Management of Units #1, #2 and #3 Steam Generator Replacement activities
  • Performed QA oversight of Replacement Steam Generator Fabrication in Milan, Italy for Palo Verde.
  • Developed and maintained positive working relationships with staff, customers, and vendors.
  • Conducted regular status meetings with internal teams and external partners to track progress against established milestones.
  • Drafted reports summarizing progress made on projects for review by executive leadership team.
  • Participated in cross-functional teams responsible for developing innovative solutions for complex problems.
  • Coordinated resources across multiple departments and teams as needed for successful completion of projects.
  • Facilitated resolution of conflicts between team members when necessary.
  • Actively sought out feedback from stakeholders throughout the duration of a project in order to identify areas needing improvement or adjustment.
  • Managed multiple projects with competing deadlines simultaneously.
  • Created and implemented processes to ensure successful completion of projects.
  • Communicated effectively with stakeholders to ensure project goals are met on time and within budget.
  • Built and established strong partnerships with teams, vendors and contractors.
  • Identified needs and coordinated resource allocation to deliver quality standards on time and within budget.
  • Conducted periodic inspections of job sites for quality and progress.
  • Drove continuous improvement of project delivery process by providing strong leadership.
  • Reviewed project risks and devised proactive strategies to avoid potential roadblocks.
  • Proposed, reviewed and approved modifications to project plans.
  • Submitted project deliverables to clients, consistently adhering to quality standards.
  • Created project status presentations for delivery to customers or project personnel.
  • Negotiated with project stakeholders or suppliers to obtain resources or materials.

Project Shift Manager

Fort Calhoun Nuclear Generating Station
Blair, Nebraska
05.2006 - 12.2006
  • On temporary assignment to support the successful and record setting replacement of Steam Generators, Pressurizer and Reactor Head.
  • Developed and maintained positive working relationships with staff, customers, and vendors.
  • Resolved conflicts between staff members in a professional manner.
  • Responded quickly and effectively to emergency situations as they arose.
  • Inspected work areas regularly for cleanliness and organization standards.
  • Communicated with other shift managers to facilitate continuum of customer service.
  • Upheld company standards and compliance requirements for operations.
  • Reported employee behavioral issues, losses and customer complaints to upper-level management.
  • Read and interpreted work order specifications and information to plan, schedule and carry out jobs effectively.

Test Engineer, QA

D.C. Cook Generating Station
Bridgman, Mi
12.1999 - 06.2000
  • Initiation and testing on Unit #2 including LOP/LOCA, Diesel and Flow Balance Modification
  • QA auditor.
  • Developed test plans and strategies for products.
  • Conducted functional, performance, stress and regression tests.
  • Executed manual and automated tests in different environments.
  • Documented defects found during testing process.
  • Provided technical guidance to junior team members on testing processes and procedures.
  • Verified that all components meet design specifications and standards.
  • Evaluated current test processes and recommended best practices for improvement.
  • Analyzed test results to detect issues and track root causes.
  • Created test data for validating scenarios based on functional requirements.
  • Evaluated test results and prepared system-level reports to detail findings and validate system performance.
  • Wrote technical reports on test and analysis results and presented findings to stakeholders.
  • Gathered feedback from internal and external customers throughout planning and test phases.
  • Compared and analyzed actual to expected results and reported deviations for resolution.
  • Managed resource allocation and networked to manage planning and operations in testing cycle.
  • Maintained detailed recordkeeping and updated project documentation to compile reports.
  • Coordinated routine activities for various test teams, scheduled drive tests and cluster assignments.
  • Inspected raw materials and machinery to identify defects and malfunctions.
  • Performed testing to determine functionality or optimization.
  • Communicated with clients and coworkers about analysis results.
  • Finished projects on time and within budget.
  • Coordinated activities with suppliers, contractors or other departments.
  • Analyzed design or requirement information for equipment or systems.
  • Researched feasibility, design or performance of components or systems.
  • Determined design criteria or specifications.
  • Completed regulatory documents concerning safety issues.
  • Conferred with technical personnel to prepare designs or operational plans.
  • Conducted analyses addressing failure, reliability or yield improvement.
  • Formulated plans using detailed drawings.

Functional Test Engineer

Crystal River Generating Station
Crystal River, Fl
04.1999 - 12.1999
  • Initiation and functional testing of plant modifications including Digital Emergency Feedwater Initiation and Control, Digital Reactor Protection System, Integrated Control System, new emergency feedwater pump.
  • Reviewed test plans and identified areas of improvement.
  • Performed functional testing on applications to ensure that the requirements are met.
  • Conducted regression testing to identify errors in system functionality.
  • Analyzed existing systems and identified areas for improvement.
  • Created test data and documented results of tests performed.
  • Identified, reported, and tracked defects in bug tracking software.
  • Collaborated with developers to troubleshoot problems found during testing cycles.
  • Assisted in developing a comprehensive set of test cases for various components of the application.
  • Executed manual tests according to provided specifications and procedures.
  • Documented detailed steps for reproducing issues encountered during testing cycles.
  • Participated in design reviews to provide feedback on usability, scalability, security.
  • Performed integration testing between different modules and components of the application.
  • Communicated effectively with team members regarding project status and risks.
  • Monitored performance metrics post-release and recommended improvements accordingly.
  • Analyzed test results to detect issues and track root causes.
  • Created test data for validating scenarios based on functional requirements.
  • Created and submitted detailed bug reports about encountered anomalies in builds.
  • Evaluated test results and prepared system-level reports to detail findings and validate system performance.
  • Compared and analyzed actual to expected results and reported deviations for resolution.
  • Wrote technical reports on test and analysis results and presented findings to stakeholders.
  • Verified development and maintenance of regression test suites, analyzing compliance with prescribed standards and alignment with outcome tolerances.
  • Managed resource allocation and networked to manage planning and operations in testing cycle.
  • Coordinated routine activities for various test teams, scheduled drive tests and cluster assignments.
  • Inspected raw materials and machinery to identify defects and malfunctions.
  • Tested functionality, performance and compliance of each product against design specifications to maintain strong development standards and high customer satisfaction.
  • Wrote and updated manual test cases for team use, maintaining optimal organization for maximum productivity.
  • Created and maintained database of common and known testing defects.
  • Worked with off-site teams to complete timely tests and facilitate smooth product releases.

System Engineer

Clinton Power Station
Clinton, Illinois
02.1998 - 04.1999
  • Responsible for two, EMD, 3865 KW tandem Diesel Units, one EMD 2600 KW Diesel Unit and support systems, Maintenance Rule evaluation, System Restart Readiness review, DG system upgrades
  • Developed test plans and test cases to ensure quality assurance of system components.
  • Developed, configured and maintained systems in a multi-platform environment.
  • Reviewed blueprints and specifications for new installations or modifications.
  • Investigated customer complaints regarding faulty equipment operations or malfunctions.
  • Performed preventive maintenance on electrical systems and equipment.
  • Developed test plans to evaluate performance of electrical components.
  • Conducted safety inspections, identified potential hazards, and implemented corrective actions.
  • Installed, maintained, and repaired wiring, control systems, motors, lighting fixtures, and other electrical equipment.
  • Assisted with the development of procedures for emergency repairs as needed.
  • Programmed programmable logic controllers to ensure efficient operation of automated machinery.
  • Performed troubleshooting activities to diagnose and repair issues with electrical system components.
  • Tested electrical systems using specialized instruments such as oscilloscopes and meggers.
  • Monitored power distribution systems to ensure reliability of service in accordance with safety regulations.
  • Provided technical support for the installation of new plant production equipment.
  • Analyzed data from tests to determine necessary repairs or adjustments required to maintain optimal performance levels.
  • Resolved complex problems related to malfunctioning electrical systems by diagnosing root cause issues and implementing solutions accordingly.
  • Maintained records of all maintenance activities performed in an organized manner.
  • Updated schematics and drawings of existing electrical systems as needed.
  • Troubleshot machine breakdowns and provided preventive maintenance services to machines.
  • Responded to breakdowns and resolved issues effectively and efficiently.
  • Efficiently executed shut downs for planned maintenance.
  • Created step-by-step procedures for day-to-day tasks to streamline workflow and improve efficiency.
  • Tested and inspected machinery or equipment to diagnose machine malfunctions.
  • Contacted suppliers and equipment manufacturers to obtain specialized operational information.
  • Developed and implemented operations manuals, policies and procedures and maintenance program schedules.
  • Diagnosed and repaired mechanical issues according to industry standards.
  • Tested circuitry and electronic components according to engineering instructions, technical manuals or knowledge of electronics.
  • Performed diagnostics and testing to locate root causes and resolve issues for optimal performance.
  • Read and interpreted technical manuals, drawings and schematics to make accurate repair decisions.
  • Set up and operated specialized or standard test equipment to diagnose, test or analyze performance of electronic components, assemblies or systems.
  • Leveraged outstanding communication, interpersonal and people skills to work well with clients.
  • Evaluated engineering proposals and drawings to assess feasibility and conformance with sound electrical engineering practices and safety standards.

Project Engineer

MKW Power Systems, for Dade County Water & Sewer Dept
Miami, FL
07.1995 - 02.1997
  • Responsible for testing (8) 2850 KW EMD EDG’s including factory warranty runs, full load testing, PLC, microprocessor control logic startup and checkout including integration with existing breaker schemes.
  • Developed project plans, budgets and timelines to ensure successful completion of projects.
  • Managed resources such as equipment, materials, personnel and subcontractors to achieve project goals.
  • Conducted risk assessments and created mitigation strategies for potential risks associated with projects.
  • Provided technical advice and guidance on design concepts and construction methods.
  • Collaborated with stakeholders to identify opportunities for process improvement in the delivery of projects.
  • Resolved conflicts between vendors, contractors, internal staff or other stakeholders related to project objectives.
  • Reviewed blueprints, drawings and specifications for accuracy and completeness prior to construction commencement.
  • Identified cost saving measures that could be implemented without compromising safety or quality standards during the project life cycle.
  • Conducted regular inspections at job sites in order to monitor safety protocols being followed by contractors.
  • Maintained accurate records of all expenses incurred during the course of a given project.
  • Documented lessons learned from completed projects which could be used in future endeavors.
  • Maintained project schedule by monitoring project progress, coordinating activities and resolving problems.
  • Supervised installation of materials and equipment for compliance with drawings and specifications.
  • Coordinated project plans to execute major upgrades and successfully guided technical teams in achieving project goals.
  • Modified and approved technical documentation according to customer specifications.
  • Prepared cost analyses, tracked change orders and managed schedules to improve project performance.
  • Maintained detailed knowledge of internal specifications and design standards as well as applicable regulatory requirements.
  • Determined project responsibilities by identifying and assigning personnel to project phases and elements.
  • Created accurate project specifications, documenting in technical manuals.
  • Formulated plans using detailed drawings.
  • Analyzed design or requirement information for equipment or systems.
  • Conferred with technical personnel to prepare designs or operational plans.

Senior Test Engineer

Point Beach Generating Station
Two Rivers, Wisconsin
05.1994 - 07.1995
  • Initiation and Testing Emergency Diesel Generator Integrated Safeguards procedures related to the EMD EDG tie-in project for LOSS OF OFFSITE POWER testing, Voltage Regulator and Governor testing.

Senior Test Engineer

Quad Cities Nuclear Station
Illinois
01.1994 - 05.1994
  • Initiation and Testing of (2) New 3800 KW EMD Emergency Tandem Diesels for site SBO with 480/4160V Switchgear and Transformers including all support systems
  • DCS installation and testing.

Startup Engineer

Comanche Peak Steam Generating Station
Glen Rose, TX
03.1992 - 12.1993
  • Testing of two 7 MW DeLaval Emergency Diesel Generators to verify control circuit logic and Breaker trip logic for EDG's, Integrated Safeguards Testing for Units 1 and 2
  • Assisted with Unit #2 Power Ascension.

Functional Test Engineer

Crystal River Generating Station
Crystal River, Fl
08.1991 - 03.1992
  • Initiation and Testing of numerous plant modifications to support a planned outage.

Startup Engineer

Turkey Point Power Plant
Florida
01.1990 - 07.1991
Russelleville
  • Initiation and Testing of Emergency Diesel Generators, control circuit logic and instrumentation for four (4) EMD EDGs and their associated support equipment and integrated safeguards testing for the original EDG’s.

Modifications Engineer

Palo Verde Generating Station
Phoenix, Arizona
04.1989 - 01.1990
  • Installation and testing of numerous modifications for all (3) three units

System Engineer

Waste Isolation Pilot Project
Carlsbad, N.M.
01.1989 - 04.1989
  • Initiation and Testing of Fire Protection and Security Systems at the Waste Isolation Pilot Project.

Functional Test Engineer

Crystal River Generating Station
Crystal River, Fl
09.1987 - 12.1988
  • Perform Diesel system upgrades and testing
  • Appendix ‘R’ modification and testing.

System Engineer

Palo Verde Generating Station
Phoenix, Arizona
09.1985 - 09.1987
Wintersburg
  • Responsible for Walkdowns and Turnover of Fire Protection and Radwaste Systems on Unit #3.

Functional Test Engineer

Crystal River Generating Station
Crystal River, Fl
10.1984 - 08.1985
  • Perform Installation and Testing of new Emergency Feedwater Initiation and Control System

Startup Engineer

Palo Verde Generating Station
Phoenix, Arizona
07.1982 - 10.1984
  • Perform startup testing activities for Unit #1 plant systems to support plant operation

Digital Programmable Control Systems Specialist

Brunswick/General Dynamics
Lincoln, Nebraska
10.1979 - 08.1982
  • Perform installation and testing activities for Brunswick/General Dynamics Defense Contractor fabrication and assembly facility
  • Responsible for the development of the new programmable controller design, installation and testing
  • Also installed and performed startup testing of the 2nd Stage of the MX Missile Fabrication machines (Robotics)
  • Also installed and performed startup testing of the Fabrication Machines (Robotics) for the Light Anti-tank Weapons (LAW) to be supplied to NATA defense forces.

Education

Associate of Arts - Electronic Technology

Southeast Community College Area
Milford, NE
01-1971

Skills

  • Client liaison
  • Meeting facilitation
  • Meeting participation
  • Project Scheduling
  • Project Planning
  • Client Relationship Management
  • Security Testing
  • Performance Testing
  • Test procedures
  • Quality assurance procedures
  • Cost Control
  • Remote testing
  • Risk Management
  • Root Cause Analysis
  • Project oversight
  • Project forecasting
  • Project Manpower Management
  • Reports for senior management
  • Project Performance Forecasting

Professional Licenses And Societies

  • Project Management Professional Certification (PMP)
  • PMI Member
  • Qualified Six Sigma (Green Belt)

Position Held

  • Project Shift Manager
  • Senior Project Manager/Oversight
  • Work Management
  • System Engineer
  • Subcontracts Oversight Rep
  • Project Scheduling
  • Lead Installation Rep
  • Nuclear Test Engineer (ANSI III)
  • Nuclear Commissioning
  • Field Engineer
  • Qualified Planner
  • Quality Assurance

Certification

  • Project Manager Professional (PMP)
  • Six Sigma Green Belt

Accomplishments

Accomplishments:

A commitment to completing large and small projects to support carbon footprint reduction in the United States.

Recent Senior Project Management Vendor Oversight of the first digital AP1000 Nuclear Generating Units in the United States.

The successful restart of over six (6) Nuclear Electrical Generating Facilities to support U.S. electrical power needs without a carbon footprint.

The successful upgrade of a Nuclear Fuel Fabrication Facility to support Nuclear Regulatory Commission re-licensing to support continued operation of numerous Nuclear Electrical Generating Production world wide.

Affiliations

Maintaining a Work-Life Balance through strong family and friend relationships while pursuing Continuous Learning to support a qualified and happy work environment.

  • Project Management Institute

Timeline

Senior Project Manager Oversight for Georgia Power Corporation

Vogtle Unit 3 & 4
11.2019 - 12.2023

Senior Project Manager for Sintering Furnace Upgrades and Electrical Distribution System Replacement

Columbia Nuclear Fuels Fabrication Facility
05.2018 - 11.2019

Project Manager for Fire Protection and Detection upgrades

Arkansas Nuclear ONE Generating Station
09.2017 - 04.2018

Project Manager in (PMO) and Subcontracts Representative

V.C. Summer Nuclear Generating Station
10.2016 - 08.2017

Project Manager, Lead Installation Representative, Field Engineer, Test Engineer

Fort Calhoun Nuclear Generating Station
01.2008 - 10.2016

Project Shift Manager

Fort Calhoun Nuclear Generating Station
05.2006 - 12.2006

Project Manager

Palo Verde Nuclear Generating Station
06.2000 - 12.2007

Test Engineer, QA

D.C. Cook Generating Station
12.1999 - 06.2000

Functional Test Engineer

Crystal River Generating Station
04.1999 - 12.1999

System Engineer

Clinton Power Station
02.1998 - 04.1999

Project Engineer

MKW Power Systems, for Dade County Water & Sewer Dept
07.1995 - 02.1997

Senior Test Engineer

Point Beach Generating Station
05.1994 - 07.1995

Senior Test Engineer

Quad Cities Nuclear Station
01.1994 - 05.1994

Startup Engineer

Comanche Peak Steam Generating Station
03.1992 - 12.1993

Functional Test Engineer

Crystal River Generating Station
08.1991 - 03.1992

Startup Engineer

Turkey Point Power Plant
01.1990 - 07.1991

Modifications Engineer

Palo Verde Generating Station
04.1989 - 01.1990

System Engineer

Waste Isolation Pilot Project
01.1989 - 04.1989

Functional Test Engineer

Crystal River Generating Station
09.1987 - 12.1988

System Engineer

Palo Verde Generating Station
09.1985 - 09.1987

Functional Test Engineer

Crystal River Generating Station
10.1984 - 08.1985

Startup Engineer

Palo Verde Generating Station
07.1982 - 10.1984

Digital Programmable Control Systems Specialist

Brunswick/General Dynamics
10.1979 - 08.1982

Associate of Arts - Electronic Technology

Southeast Community College Area
RICHARD WOOCKMANSenior Project Manager