Summary
Overview
Work History
Education
Skills
Timeline
Generic

Richard A Serna

Safford ,AZ

Summary

Dynamic carpenter with extensive experience at Western Industrial Resources, skilled in blueprint interpretation and precision measuring. Proven track record of enhancing workflow efficiency and exceeding client expectations through quality craftsmanship. Strong problem-solving abilities and a commitment to safety ensure successful project completion within tight deadlines.

Overview

7
7
years of professional experience

Work History

Carpenter

Western Industrial Resources
Apache Junction, AZ
08.2025 - Current
  • Constructed frameworks and structures using various materials including wood, metal, and composites.
  • Operated power tools and equipment safely to execute precise carpentry tasks.
  • Interpreted blueprints and technical drawings to ensure accurate project execution.
  • Collaborated with team members to complete projects efficiently and on schedule.
  • Built forms
  • Tired and fabricated rebar
  • Poured and finished concret

Carpenter

Schmueser and Associates
Benson, AZ
05.2025 - 08.2025
  • Constructed frameworks and structures using various materials, ensuring adherence to safety protocols.
  • Interpreted blueprints and technical drawings to meet project specifications accurately.
  • Operated hand tools and power tools efficiently to complete carpentry tasks independently.
  • Collaborated with team members to troubleshoot issues and ensure project timelines were met.

Carpenter Journey Man

Western Industrial Resources
Morenci, AZ
11.2021 - 05.2025
  • Constructed and installed framing, flooring, and cabinetry using various hand and power tools.
  • Interpreted blueprints and technical drawings to ensure accurate project execution.
  • Utilized safety protocols to maintain a clean and hazard-free work environment.
  • Collaborated with team members to coordinate project timelines and resource allocation.
  • Trained apprentices on proper tool usage, safety standards, and carpentry techniques.
  • Implemented process improvements that enhanced workflow efficiency and reduced material waste.
  • Conducted quality inspections of finished products to ensure adherence to specifications.
  • Participated in continuous learning and professional development opportunities to stay updated on industry trends, tools, and techniques.
  • Collaborated with team members to complete complex projects within tight deadlines, improving overall productivity.
  • Exceeded client expectations by consistently delivering projects ahead of schedule without compromising quality standards.
  • Maintained a safe work environment by adhering to safety regulations and guidelines, minimizing workplace accidents.
  • Cut, shaped and installed siding, roofing and framing to protect interior of properties from harsh weather conditions.
  • Measured materials to determine sizes and quantity required for construction project.
  • Installed drywall, ceilings, trim and fabricated replacement trim and moldings.
  • Assembled and installed furniture and cabinetry.

Farm Hand

Big Hemp Ranch
Safford, AZ
12.2020 - 11.2021
  • Operated and maintained farm equipment for planting and harvesting processes.
  • Assisted in the care and feeding of livestock to ensure optimal health.
  • Monitored crop growth, identifying pests and diseases for timely intervention.
  • Collaborated with team members to implement sustainable farming practices.
  • Executed daily irrigation tasks to maintain soil moisture levels effectively.
  • Conducted routine maintenance on tools and machinery to enhance operational efficiency.
  • Collaborated with other farm workers to complete tasks efficiently according to established schedules and protocols.
  • Supported successful harvests through diligent planting, weeding, and pruning efforts.
  • Harvested crops at peak ripeness, ensuring highest quality produce for market.

Carpenter Helper

Western Industrial
Morenci, AZ
11.2019 - 11.2020
  • Assisted in measuring and cutting materials according to project specifications.
  • Supported lead carpenter in assembling structures and installations on job sites.
  • Maintained tools and equipment, ensuring proper functioning and safety standards.
  • Collaborated with team members to achieve project milestones and timelines.
  • Learned safety protocols for handling hazardous materials and equipment usage.
  • Contributed to maintaining clean work environment, promoting efficiency on job sites.
  • Collaborated with team members to complete projects on time and within budget constraints.
  • Demonstrated adaptability in performing various tasks such as framing, roofing, siding installation, or drywall hanging as needed for different projects.
  • Aided in the installation of doors, windows, cabinetry, flooring, and trim work as required for each project''s needs.
  • Demonstrated attention to detail when finishing surfaces through sanding or painting processes to meet client expectations for quality craftsmanship.
  • Maintained a positive, professional attitude while interacting with clients, vendors, or inspectors to ensure smooth project progress.
  • Enhanced job site safety by maintaining a clean, organized workspace and properly storing tools and equipment.
  • Improved project efficiency by assisting carpenters in measuring, cutting, and assembling materials.

Engine Crew Member

US Forest Service
Safford, AZ
05.2019 - 10.2019

Cut fire lines ran the fire truck for fire suppression used chain saws to cut trees and brush

Education

High School Diploma - Carpentry

Pima High School
Pima, AZ
05.2019

Skills

  • Blueprint interpretation
  • Framing construction
  • Cabinet installation
  • Power tool operation
  • Precision measuring
  • Rebar fabrication
  • Concrete pouring
  • Workflow efficiency
  • Tool maintenance
  • Surface finishing
  • Drywall installation
  • Hazard prevention
  • Problem-solving
  • Finish carpentry
  • Measuring and cutting
  • General laborer
  • Demolition work
  • Flooring installation
  • Drywall hanging
  • Woodworking techniques
  • Painting and staining
  • Remodeling projects
  • Carpentry techniques
  • Door installation

Timeline

Carpenter

Western Industrial Resources
08.2025 - Current

Carpenter

Schmueser and Associates
05.2025 - 08.2025

Carpenter Journey Man

Western Industrial Resources
11.2021 - 05.2025

Farm Hand

Big Hemp Ranch
12.2020 - 11.2021

Carpenter Helper

Western Industrial
11.2019 - 11.2020

Engine Crew Member

US Forest Service
05.2019 - 10.2019

High School Diploma - Carpentry

Pima High School
Richard A Serna