Construction Manager
Mastec Inc
04.2023 - Current
Identified and resolved construction issues promptly to prevent delays.
Communicated daily with vendors to keep project fully operational.
Collaborated with contractors, architects, engineers, and public agencies to complete projects within timeline limitations and budget constraints.
Supervised team of Superintendents and Field Engineers to maintain productivity and quality of work.
Collaborate with project designers to interpret construction designs and make necessary adjustments to accommodate site-specific conditions while ensuring compliance with design specifications.
Oversee and supervise construction activities, ensuring they are executed according to established plans, quality standards, safety protocols, and within budget and time constraints.
Construction Manager
Mastec Inc
10.2021 - 04.2023
Identified and resolved construction issues promptly to prevent delays.
Communicated daily with vendors to keep project fully operational.
Collaborated with contractors, architects, engineers, and public agencies to complete projects within timeline limitations and budget constraints.
Supervised team of Superintendents to maintain productivity and quality of work.
Work closely with the client to address concern, report accurately, and ensure satisfaction during the construction phase.
Implement, develop, and maintain construction practices project specific and best practices.
Sr. Superintendent
Kiewit
01.2020 - 10.2021
Underground piping superintendent
Mechanical superintendent bypass stacks
Mechanical superintendent equipment layout and setting
HRSG vendor pipe superintendent
Collaborated with management, technical crew members and fellow supervisors to organize efficient operations and achieve demanding schedule targets.
Trained general contractors on company protocol and led quality assurance initiatives, maintaining high customer satisfaction ratings.
Enhanced company development initiatives by solving complex issues and suggesting corrective action.
Complied with all safety protocols in plan coordination, eliminating potential risks.
Drove project objectives on day-to-day operational level by working closely with clients, decision-makers and vendors.
Developed work schedules for all team members to maximize shift coverage.
HRSG Field Superintendent
Mcdermott
04.2018 - 12.2019
Coordinating craft safety training and enforcing safe work practices at all times
Planned the craft manpower and interfacing with Industrial Relations for craft recruitment, hiring, and skills training program
Managed anywhere from 2-4 general foreman's with 3-4 foreman's and 10 man crews
Planned and oversaw the building of 2 Vogt HRSG and piping of each from beginning to hydro
Preparing the weekly work plans in conjunction with the area planners
Preparing material requisitions for all tools and consumables required to execute the work and coordinating with procurement to obtain materials
Ensuring current revision documents are utilized for piping installation
Interfacing with the field engineering staff to resolve installation conflicts and fabrication errors and to obtain technical assistant for the craft supervisors and work force
Coordinating and supporting all piping-related subcontractor work activities
Providing input to the quantity tracking application and reporting weekly installed quantities to the responsible field engineer. Maintaining a high level of housekeeping throughout the work area
Performing employee reviews for subordinate personnel and assisting in their development
Collaborated with materials purchasing specialist to meet production requirements and quality standards
Determined and recommended methods to address improvement opportunities
Pipe Superintendent
Gemma Power Systems
08.2017 - 03.2018
Oversaw the entire building turnover process, while enhancing communication between all construction management
Reported the quality of performance on site to all site construction managers
Avoided construction delays by efficiently following through with all site inspections in a timely manner
Determined the project schedule, which included the sequence of all construction activities
Performed regular job site observations to provide direction for all employees
Conducted routine quality audits to ensure that work was progressing per the specifications and initiated corrective actions
Prepared and followed through on all required punch lists
Plan the manpower and equipment required to execute the job
Coordinate with other discipline superintendents with established building or area construction work activities and plans
Implemented systems to improve process efficiency and reduce the project duration
Supervised over Union sub contractors to ensure deadlines and quality specifications were met
Pipefitter General Foreman
Fluor
11.2016 - 08.2017
Trained and supervised all incoming employees
Scheduled all contractors and materials deliveries
Conducted weekly production and operations contractor meetings, which facilitated stronger communication and the ability to resolve critical issues
Reported to the superintendent on conformance with the contract schedule
Built Work/ test packages to ensure foreman had all information to deliver the best product in a timely fashion
Direct and adjust work scope to ensure deadlines are met
Provide solutions for all problems brought to me
Lead the preparation and implementation of the 3-week look-ahead and four-week rolling schedule and budget control with support from field engineering and project controls
Was responsible for the cost, schedule and optimization of craft labor and maintaining the four week look ahead schedule for labor and equipment
Coordinate safety training and enforce safe work behaviors and practices at all times in conjunction with environmental safety and health supervisor
Inspect building and area for unsafe conditions, behaviors and practices and take appropriate corrective actions to mitigate and eliminate
Pipefitter Foreman
Performance Contracting inc
10.2016 - 11.2016
Eliminated risks by correctly identifying potential safety hazards
Interpreted blueprints to determine locations, quantities and sizes of materials required
Built work/ hydro packages to assist in planning of the job
Daily update on all production performed
Managed man hours to ensure deadlines
Turned over systems to the client
Walk down systems to assure quality
Read drawings to determine appropriate materials and procedures for each project
Offered guidance and training to junior team members
Prepared detailed records of all project tasks from start to finish
Pipefitter Foreman
Kellogg Brown and Root
02.2016 - 10.2016
Prepared and followed through on all required punch lists
Worked with construction administration consultants to plan field observations on schedule
Weld map of all welds completed in my area
Completed a biweekly look ahead
Observed hydrostatic and dimension tolerance tests to evaluate weld quality and conformance to specifications
Detected faulty operation of equipment and defective materials and promptly resolved issues
Worked with certified pipe welders by providing accurate pipe preparation and fitting
Read blueprints to determine appropriate materials and procedures for each project
Expanded trade knowledge by networking with colleagues and participating in courses and seminars
Assembled and installed a variety of valves and fittings
Pipefitter Foreman
Kellogg Brown and Root
05.2014 - 02.2016
Installed valves, hangers, supports and flanges inside piping systems
Interpreted blueprints to determine locations, quantities and sizes of materials required
Plan, manage, and map all welds done in my area
Prepare fits, flange faces, and various bolt makeups to specifications given.
Expanded trade knowledge by networking with colleagues and participating in courses and seminars
Read blueprints to determine appropriate materials and procedures for each project
Observed hydrostatic and dimension tolerance tests to evaluate weld quality and conformance to specifications
Detected faulty operation of equipment and defective materials and promptly resolved issues
Fabricated shop parts directly from blueprints
Layout material ahead of my crew with a minimum of a 2 week look ahead on task to come
Boilermaker/ Weldout Foreman
Kellogg Brown and Root
11.2013 - 05.2014
Inspected structures to avoid any obstruction and delays throughout the project
Worked closely with our quality team and the client to turn over our duct work
Required to do a detailed inspection of all welds and work completed before calling for inspection
Inspection of various welded materials such as Hasteloy, Inconel, and Carbon Steel
Completing one week look ahead for my crew
Reading and interpreting Blue prints to determine the material was installed and welded correctly
Prepared detailed records of all project tasks from start to finish
Ensured my crew had everything they needed to complete the task at hand at all times
Managed time properly to ensure we beat deadlines set by employer
Pipefitter
Kellogg Brown and Root
08.2012 - 10.2013
Installed valves, hangers, supports and flanges inside piping systems
Eliminated risks by correctly identifying potential safety hazards
Secured pipes to structures with clamps, brackets and hangers
Expanded trade knowledge by networking with colleagues and participating in courses and seminars
Read blueprints to determine appropriate materials and procedures for each project
Worked with certified pipe welders by providing accurate pipe preparation and fitting
Obtained precise results by performing accurate hydrotesting
Offered guidance and training to junior team members
Prepared detailed records of all project tasks from start to finish
Pipefitter
Brunswerk
05.2009 - 06.2012
Conducted hydrostatic water testing.
Provided accurate measurements and estimates for all projects.
Consistently assumed additional responsibilities and worked extended hours to meet project deadlines.
Monitored inventory and reported items to be restocked for each job.
Fit various types of supports.
Interpreted blueprints to determine locations, quantities and sizes of materials required.
Erect piping on location with accuracy
Determined if piping spools should be welded before or after erection