Summary
Overview
Work History
Education
Skills
Additional Information
Timeline
Generic

Rick Drew

Centerville,TX

Summary

I am a seasoned management -Team member. Competent in team, budget,schedule,oversight, manage multiple projects at all varying phases.

I started my career as a laborer in the construction industry after returning from the Army. My entry into the business was as a skilled laborer and earned my way from that by working as foreman, superintendent, construction manager, Logistics manager to project manager. During this time I also supplemented my career as a skilled carpenter as well.

I enjoy all aspects of business- work environment, and continue to utilize my previous experiences to different levels of business from construction methods, manufacturing, logistics.

I have had the opportunity to utilize my experience at different levels and enjoy different business work environments. I enjoy work, and the new challenges new opportunities it brings. I have had numerous security clearances - background checks through the years for my employment.

I believe in the LS Tractor as I own one along with LS Implements. I have hade Zero issues with it and look to trade up to another model for our small ranch here in Centerville.

I appreciate this opportunity

Overview

17
17
years of professional experience

Work History

Construction Supervisor

Noble Building And Development
12.2022 - Current
  • Supervised field crews to maximize quality and work efficiency.
  • Maintained safe work environment by enforcing company policies, procedures, and regulatory standards throughout each project phase.
  • Completed projects on time and within budget by effectively managing resources and schedules.
  • Reported quality of performance on site to site construction managers.
  • Delivered reports to construction manager to detail project updates and likely completion dates, noting delays, and causes.
  • Completed accurate material and labor estimates for jobs ranging from small to large budgets.
  • Delegated assignments based on plans, project needs, and knowledge of individual team members.
  • Increased client satisfaction with clear communication, timely updates, and quick resolution of issues.
  • Supervised material usage and contractor man-hours to keep projects in line with budgetary restrictions.
  • Ensured compliance with local building codes, regulations, and industry best practices through diligent oversight of all construction activities.
  • Collaborated with architects, engineers, and designers to develop comprehensive plans that met client requirements while adhering to established budgets and timelines.
  • Developed strong relationships with subcontractors, vendors, and suppliers to ensure timely delivery of materials at competitive prices.
  • Reduced safety incidents by implementing rigorous safety training programs for all workers.
  • Mitigated risks by conducting thorough site assessments and implementing appropriate safety measures.
  • Delivered high-quality projects by maintaining a rigorous focus on quality assurance and control throughout construction process.
  • Collaborated with management and fellow supervisors to organize operations and achieve demanding schedule targets.
  • Coordinated construction planning, material resources, and staff scheduling to achieve on-time, under-budget completion numerous profitable projects .Reduced excess spending by effectively utilizing given resources.
  • Optimized resource allocation by continuously monitoring progress and adjusting staffing levels as needed.
  • Identified and eliminated safety risks through additional training.
  • Maintained safe practices and operated within budget constraints by training construction workers on best practices and established protocols.
  • Eliminated project lags by inspecting work-in-progress, tracking lead times and testing work to achieve quality control specifications.
  • Mentored junior staff members through ongoing guidance, support, and knowledge sharing to foster their professional growth within industry.
  • Conducted post-project evaluations to identify areas for improvement in future initiatives while celebrating successes along the way.
  • Streamlined processes through implementation of new technologies and software tools for project management tasks.
  • Improved project efficiency by streamlining communication between construction teams and stakeholders.

Project Manager-QA-QC

KSB Construction
03.2014 - 01.2022
  • Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.
  • Planned, designed, and scheduled phases for large projects.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Established effective communication among team members for enhanced collaboration and successful project completion.
  • Developed comprehensive project plans with clear timelines, milestones, and budget requirements, ensuring timely delivery of high-quality results.
  • Delivered exceptional customer satisfaction by proactively addressing client concerns and meeting or exceeding expectations throughout the engagement process.
  • Monitored progress against established goals, adjusting schedules and resources as needed to keep projects on track.
  • Developed strong relationships with stakeholders through regular communication updates, fostering trust and confidence in the team''s ability to deliver results.
  • Collaborated closely with senior management to align project objectives with strategic company initiatives, ensuring that efforts contributed to overall business growth.
  • Identified plans and resources required to meet project goals and objectives.
  • Achieved project deadlines by coordinating with contractors to manage performance.
  • Provided detailed project status updates to stakeholders and executive management.
  • Coordinated cross-functional teams and resolved conflicts, maintaining a positive work environment throughout the project lifecycle.
  • Coordinated with cross-functional teams to resolve project issues and mitigate risks.
  • Managed projects from procurement to commission.
  • Managed risk assessments and implemented mitigation strategies to minimize potential issues during project execution.
  • Provided detailed technical and operational direction in project challenges, consistently meeting deliverables according to deadlines.
  • Negotiated contracts with vendors and suppliers, securing quality materials at competitive prices for efficient use of resources.
  • Coordinated material procurement and required services for projects within budget requirements.
  • Implemented continuous improvement initiatives to optimize project outcomes while maintaining costeffectiveness.
  • Effectively managed scope creep by establishing clear boundaries on requested changes while keeping projects aligned with original objectives and budgets.
  • Ensured regulatory compliance by closely monitoring applicable laws and regulations within the industry sector throughout each stage of the project life cycle.
  • Enhanced overall project success by conducting thorough post-project evaluations and incorporating lessons learned into future efforts.
  • Maintained open communication by presenting regular updates on project status to customers.
  • Scheduled and facilitated meetings between project stakeholders to discuss deliverables, schedules and conflicts.
  • Reported regularly to managers on project budget, progress, and technical problems.
  • Monitored project progress, identified risks and took corrective action as needed.
  • Verified quality of deliverables and conformance to specifications before submitting to clients.

Project Manager- Technical Inspector

Jacobs Engineering
04.2017 - 06.2019

This Position was for US Department of Defense, managing construction-Technical Inspections, and Government- Contractor oversight for construction operations on US. Air Force Base.

Project Manager-Logistics

Roll-Lift Americas
02.2015 - 12.2017
  • Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.
  • Planned, designed, and scheduled phases for large projects.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Established effective communication among team members for enhanced collaboration and successful project completion.
  • Developed comprehensive project plans with clear timelines, milestones, and budget requirements, ensuring timely delivery of high-quality results.
  • Delivered exceptional customer satisfaction by proactively addressing client concerns and meeting or exceeding expectations throughout the engagement process.
  • Monitored progress against established goals, adjusting schedules and resources as needed to keep projects on track.
  • Achieved project deadlines by coordinating with contractors to manage performance.
  • Developed strong relationships with stakeholders through regular communication updates, fostering trust and confidence in the team''s ability to deliver results.
  • Collaborated closely with senior management to align project objectives with strategic company initiatives, ensuring that efforts contributed to overall business growth.
  • Identified plans and resources required to meet project goals and objectives.
  • Provided detailed project status updates to stakeholders and executive management.
  • Coordinated cross-functional teams and resolved conflicts, maintaining a positive work environment throughout the project lifecycle.
  • Prepared and submitted project invoices for review and approval.
  • Developed and initiated projects, managed costs, and monitored performance.
  • Managed projects from procurement to commission.
  • Provided detailed technical and operational direction in project challenges, consistently meeting deliverables according to deadlines.
  • Negotiated contracts with vendors and suppliers, securing quality materials at competitive prices for efficient use of resources.
  • Negotiated and managed third-party contracts related to project deliverables.
  • Created accurate budgets based on resource requirements, allowing for optimal allocation of funds across all aspects of the projects.
  • Coordinated material procurement and required services for projects within budget requirements.
  • Prepared detailed reports on project status for stakeholders, ensuring transparency and alignment with objectives.
  • Drafted project reports to identify successful outcomes, insights and future recommendations.
  • Mentored junior team members in project management best practices to enhance their skills and contribute to better overall performance.

Logistics Manager

Barnhart Renewable Energy
01.2007 - 11.2014
  • Enhanced customer satisfaction by closely monitoring order fulfillment and addressing issues promptly.
  • Ensured regulatory compliance in all aspects of logistics operations, including transportation safety standards and customs requirements.
  • Directed shipping and receiving of wide range of products daily.
  • Improved on-time delivery rates by optimizing transportation routes and scheduling.
  • Managed a team of logistics professionals, providing coaching and guidance for career development and skill enhancement.
  • Conducted regular audits of logistics practices to identify areas for improvement and implement corrective actions accordingly.
  • Meticulously tracked shipments from origin to destination, proactively addressing any delays or issues that arose during transit.
  • Coordinated driver dispatch to accomplish daily delivery requirements.
  • Planned and supervised shipments from production to end-user and scheduled daily and weekly routes.
  • Resolved shipping discrepancies by coordinating customer and courier communications.
  • Coordinated dispatching of drivers to accomplish daily delivery requirements.
  • Monitored logistics performance and identified improvement opportunities.
  • Efficiently managed budgets, ensuring optimal allocation of resources towards critical projects while minimizing unnecessary expenditures.
  • Kept corporate departments and customers updated on critical shipments.
  • Developed strong relationships with vendors, leading to improved pricing and service levels.
  • Oversaw the procurement process, establishing strategic partnerships with suppliers to reduce lead times and minimize stockouts.
  • Negotiated favorable terms with carriers, resulting in significant cost savings for the organization without compromising service quality.
  • Negotiated transportation and logistics contracts to reduce shipping costs.
  • Established contingency plans for potential disruptions in the supply chain, ensuring business continuity during unforeseen circumstances.
  • Implemented advanced forecasting techniques to anticipate demand fluctuations and optimize inventory levels accordingly.
  • Developed warehouse system that provided best cost with appropriate service levels to achieve organizational goals.
  • Reduced warehouse storage costs with effective space utilization strategies.
  • Secured discounts from third-party logistics service providers to deliver substantial cost savings.
  • Oversaw warehouse staff and maintained efficiency in fast-paced environment.
  • Trained new staff on job duties, company policies, and safety procedures for rapid onboarding.
  • Created and enforced detailed organization processes to increase quality and service standards.
  • Developed and maintained knowledgeable and productive team of employees.
  • Organized records of vehicles, schedules and completed orders.
  • Integrated warehouse operations with existing and new business processes.
  • Led improvement initiatives to advance operational efficiencies and increase revenue.
  • Tracked production and quality control systems to proactively identify deficiencies.
  • Prospected for leads to build pipeline and convert to sales opportunities.

Education

Some College (No Degree) - Fires Direction Control

US Army Artillery
Fort Sill, OK

High School Diploma -

South Hillls High
Pittsburgh, PA
05.1971

Skills

  • Scheduling and Planning
  • Materials Management
  • Concrete Work
  • Staff leadership and direction
  • Customer Relations
  • Site Safety Management
  • Permit processing
  • OSHA Regulations
  • Project Budgeting
  • Environmental Compliance
  • Bid estimation
  • Construction Estimating
  • Cost Control
  • Blueprints
  • Construction Software Proficiency
  • Permit acquisition
  • Value Engineering
  • Teamwork and Collaboration
  • Attention to Detail
  • Dedicated Work Ethic
  • Construction supervision
  • Critical Thinking
  • Safety policies and procedures
  • Project Leadership
  • Heavy Lifting
  • Wood and Metal Framing
  • Worksite safety
  • Interpersonal and written communication
  • OSHA Compliance
  • Effective Communication
  • Crew Leadership
  • Daily Reporting
  • Physical Stamina
  • Project deadlines
  • Site Inspection
  • Cost Estimation
  • Project Management

Additional Information

I have the following Certifications:


a. Competent Person -Equipment Operations

b. OSHA 30

c. First Aid

d. Fork Lift , Skid Loader,Boom Lift, Scissor Lift.



Software:

1. Microsoft Office Suite

2. Procore Project Management

3. CraftStar Estimating

4. Timberline Systems

.

Timeline

Construction Supervisor

Noble Building And Development
12.2022 - Current

Project Manager- Technical Inspector

Jacobs Engineering
04.2017 - 06.2019

Project Manager-Logistics

Roll-Lift Americas
02.2015 - 12.2017

Project Manager-QA-QC

KSB Construction
03.2014 - 01.2022

Logistics Manager

Barnhart Renewable Energy
01.2007 - 11.2014

Some College (No Degree) - Fires Direction Control

US Army Artillery

High School Diploma -

South Hillls High
Rick Drew