Professional walking specialist with track record of dependable and efficient service. Known for maintaining consistent schedules and delivering client satisfaction. Collaborative team player who adapts quickly to changing needs and focuses on achieving results.
Overview
1
1
Certification
37
37
years of professional experience
Work History
Silver Bay Seafood
RW Mechanical
Kodiak, Alaska
01.2021 - 01.2022
- Redesigned refrigeration and mechanical systems for optimal processing equipment functionality
Self-motivated, with a strong sense of personal responsibility.
Worked effectively in fast-paced environments.
Skilled at working independently and collaboratively in a team environment.
Lineage Logistics Cool Port
SubZero
Oakland, California
01.2018
- Design and coordination for mechanical and refrigeration for the 280,000 Sq. ft. cold storage with 20,000 pallet positions
- Design and coordination for ammonia refrigeration system with main freezer is -10 F with two convertible rooms at -10 F to 35 F and cross aisle and docks at 35 F
- Pre-engineered metal building docks with structural steel frame and IMP skin
Lineage Logistics Cool Port | Oakland, California | 2018 | SubZero
NewCold
SubZero
Burley, Idaho
01.2018 - 01.2019
- Designed and coordinated mechanical and refrigeration systems for 305,000 sq. ft. ASRS cold storage distribution facility, optimizing space for 25 million cubic feet
- Implemented oxygen reduction system to enhance safety in facility with double interlock fast-acting airlock doors
NewCold | Burley, Idaho | 2018 - 2019 | SubZero
Silver Bay Seafood
SubZero
False Pass, Alaska
01.2018 - 01.2019
Developed 12-acre greenfield site lacking supporting infrastructure.
- 69,444 sq. ft. processing facility
- 34,530 SF of multiple bunkhouses for 400 bed housing complex, kitchen, and recreational facility
- Design | build process with scope of work including refrigeration, electrical, mechanical and process piping
- Fabricated and installed structural steel with insulated metal panel wall system to enhance facility durability
- Developed ammonia refrigeration system utilizing recirculating seawater condensers for energy efficiency
Constructed full power generation station to support facility operations.
- Installed four water wells supporting processing operations, fire sprinkler systems, and personnel needs
Self-motivated, with a strong sense of personal responsibility.
Worked effectively in fast-paced environments.
Skilled at working independently and collaboratively in a team environment.
Rick Walker
Fisher Construction Group
Moses Lake, WA
11.2023 - Current
Directs activities of workers engaged in construction process, establishes and implements plans for construction including start and completion dates, fulfills staffing requirements for each phase of construction, schedules workers, subcontractors and material suppliers. Inspects work in progress to ensure conformity to specifications and assures construction schedules are met. Managed the on-site safety program.
Selected Recent Projects:
Simplot-Ontario Oregon
Simplot Project Rainier Plant and PWT | Moses Lake, Washington
- 441,803 sq. ft. French fry manufacturing plant connected to 227,019 sq. ft. automated storage retrieval system (ASRS) facility on 94 acres site
- 1.7 million pounds of potatoes processed per day
- Dryer, fryer and freeze tunnel on second level
- 1.13 Miles of new rail track installed
- 1.5 miles of new HDPE pressurized water line
- 44,748 Sq. ft. Process water treatment buildings – reverse osmosis system
- 6,455 sq. ft. Dissolved Air Flotation (DAF) and Screening Building
- 6,256 sq. ft. Dewatering & Clarifier Building
- 19,092 sq. ft. Ultrafiltration (UF)/Reverse Osmosis (RO) Building
Self-motivated, with a strong sense of personal responsibility.
Worked effectively in fast-paced environments.
Skilled at working independently and collaboratively in a team environment.
NewCold
SubZero
Tacoma, Washington
01.2016 - 01.2017
- Designed and coordinated mechanical and refrigeration systems for 310,000 sq.ft. ASRS cold storage distribution facility
- 140 ft. tall fully automated high bay freezer
- Oversaw construction of 140 ft. tall fully automated high bay freezer
- Implemented oxygen reduction system to enhance safety and efficiency in cold storage operations.
NewCold | Tacoma, Washington | 2016 - 2017 | SubZero
Silver Bay Seafoods
SubZero
Valdez, Alaska
01.2015 - 01.2016
Managed 61,781 sq. ft. seafood processing area in compliance with safety standards.
- Designed and built seafood processing systems, including refrigeration, electrical, mechanical, and process piping utilizing ammonia refrigeration system
- Constructed 170’ x 50’ freeze tunnel to enhance seafood preservation capabilities