Ambitious professional pursuing an Insulator opportunity within an established construction enterprise. Bringing a diverse skill set and knowledge base acquired over 6 years of successful industry performance.
Overview
7
7
years of professional experience
1
1
Certification
Work History
Insulation Installer
American National Insulation
Santa Clara, CA
12.2023 - Current
Applied adhesive or mechanical fasteners to secure insulation in place.
Repaired damaged areas by removing old insulation and replacing it with new material.
Trained apprentice team members to meet project quality and efficiency standards.
Ensured proper ventilation within attics or walls when installing new insulation.
Selected appropriate insulation, ranging from mineral wool to fiberglass, based on characteristics of material and use.
Drove vehicle to job sites and organized supplies for crew members.
Measured and marked dimensions of work materials and surfaces using various tools.
Measured and cut insulation materials to fit specific dimensions.
Operated various hand tools including saws, knives, staplers, hammers, drills, and screwdrivers.
Installed high-quality fiberglass insulation in new constructions.
Sealed seams between sheets of rigid board insulation with mastic or tape sealant.
Cleaned up any debris created during the installation process.
Followed safety procedures while working at heights using ladders or scaffolding.
Insulation Installer
Alcal Specialty Contracting
Fremont, CA
06.2017 - Current
Applied adhesive or mechanical fasteners to secure insulation in place.
Removed old insulation and asbestos by following strict safety procedures.
Repaired damaged areas by removing old insulation and replacing it with new material.
Trained aprentice team members to meet project quality and efficiency standards.
Ensured proper ventilation within attics or walls when installing new insulation.
Selected appropriate insulation, ranging from mineral wool to fiberglass, based on characteristics of material and use.
Drove vehicle to job sites and organized supplies for crew members.
Measured and cut insulation materials to fit specific dimensions.
Operated various hand tools including saws, knives, staplers, hammers, drills, and screwdrivers.
Sealed seams between sheets of rigid board insulation with mastic or tape sealant.
Utilized power tools such as pneumatic guns to install fiberglass batts into wall cavities.
Cleaned up any debris created during the installation process.
Used blueprint knowledge to translate project requirements into shop drawings or written instructions.