GENERAL FOREMAN / WALKING NEW JOBS, DOING SUPERVISION OVER TA's , AND FABRICATION. MAKING SURE OUR GROUP IS VERYFING MATERIALS BEFORE INSTALLATION AND FOLLOWING ALL THE STEPS REQUIRE BY THE OWNER
Pipe Foreman over TA's , projects and e jobs
* Fabrication
* Start with the Company as a Pipe Fitter for few TA's , New Construction at LHC9 , then a got moved as Pipe Foreman
Pipe Foreman ,been working with Company on TA's at ExxonMobil Baytown, ExxonMobil Chalmette, ExxonMobil Torrence , ExxonMobil Joliet.
* Fabrication
* Demo excisting lines
* Replacing valves, pipe, exchangers
Pipe Foreman on 3 different block at Holy Frontier Refinery
* Replacing pipe, valves , tied in to pumps
* Demo excisting lines
* Isolation flare lines
-Pipe Formen over a TA's at ExxonMobil Beaumont and then I went to assist a TA at ExxonMobil Chalmette LA
- TA at Augusta ,GA
* Fabrication
* Selling packages to owner
* Removing big board piping and replacing
NEW CONSTRUCTION JOB
- FABRICATION
- HANGING PIPE
- INSTALLING NEW PIPE
- INSTALLING VALVES
- TIED INS
PIPE FOREMAN ON TA'S AT EXXONMOBIL BEAUMONT , EXXONMOBILE TORRENCE, CA
* FABRICATION
* DEMO EXCISTING LINES
* INSTALLING NEW PIPE AND VALVES
NEW CONSTRUCTION PROJECT
- HANGING PIPE
- FABRICATION
- FIELD WORK
NEW CONSTRUCTION AT POWER PLANT
- FABRICATION
- HANGING ,INSTALLING NEW PIPE
- COMITIONING
NEW CONSTRUCTION AT B-7200
- FABRICATION
- COMITIONING/ START UP
NEW CONSTRUCTION A GAS PLANT
- FABRICATION
- HANGING AND INSTALLING NEW PIPE
- TIED IN ON PUMPS
- Been with the start up crew
- Hydro
- turbine work
- Installing dummy spools for pressure test
START MY JOB AS A HRLPER FOR US CONTRACTORS FEB 2002 AT UNIT 5 NEW CONST, THEN I WORKED A LOT OF NEW CONSTRUCTION AND FEW TA'S A BOILER MAKER
- PREPING PIPE
- BOLT UPS
- REPLACING TRAYS
- BLINDING