Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Rob Galvez

Magna

Summary

Detail-oriented Foreman with expertise in project coordination, safety compliance, and team leadership. Proven ability to manage multiple projects while ensuring quality standards and effective communication with contractors.

Overview

22
22
years of professional experience
5
5
Certifications

Work History

Foreman/Journeyman Glazier

Faus Glass
Salt Lake City
10.2023 - 01.2026
  • Coordinated daily schedules for crew members and project timelines for each project.
  • Trained new employees on safety protocols and operational procedures.
  • Monitored weekly for inventory materials, and ordered supplies as needed.
  • Communicated effectively with contractors to address project specifications, concerns, diagnosed problems, and found solutions.
  • Assisted in troubleshooting installation issues to maintain workflow efficiency, but worked with colleagues to ensure we could have a positive game plan to avoid problems.
  • Conducted site inspections to assess project progress and team performance.
  • Provided guidance, direction, and positive morale to ensure a safe and positive work environment.
  • Ensured OSHA compliance with safety regulations and quality standards on-site.
  • Supervised all tasks of personnel assigned to various tasks during the workday.
  • Reviewed and inspected all equipment daily to make sure it was in working order.
  • Instilled expectations, accountability, and motivated crews to consistently meet or beat goals.
  • Communicated with employees to demonstrate high standards and mitigate issues. There is a solution to every situation, in my opinion.
  • Supervised multiple projects to uphold schedule requirements and quality demands.
  • Created detailed reports daily on job progress, and submitted them to management on time. Progress, production and what was needed to be finished before punch-list.
  • Communicated regularly with subcontractors regarding project timelines. Work schedules for glass, cranes, boomlifts etc

Education

High School Diploma -

San Marcos HS
San Marcos, CA
05-1999

Skills

  • >Residential

-vinyl windows for 7 years

-hack outs

-reglaze

-taping, caulking/tooling

-customer service with home owners

-measuring for new windows

  • >Curtain wall

-measure RO to ensure correct on plans/pre read plans before installation

-establish grid lines for control lines to start layout process, find Elevation shots per contractor

-pull from grid/offset grid lines to find BOS to ensure correct reveal to meet outside facade as per detail

-layout F/T clips with center lines off a control line, shoot BOS and F/T clips center lines to head or slab above

-establish C/L for wind load clips/welders

-make sure all waterproofing is done if needed before stick build / laying down clips

-stack verts/check plum, rack, square, and most importantly verify correct elevation

-install horizontals/zone dams

-glaze, temp off safely before pressure plate

-add permanent pressure plate with correct details , weep holes up and correct spec for torque for pressure plate screws per plans

- add beauty cap weep holes down

  • >unitized

-so much detail I will just input what jobs I was part of or was lead on (willing to discuss any questions to this system)

-The SLC Airport, did layout, elevation, setting, on Concourse A, TSA, both bridges, Customs building , delta sky box, Clear stories, interior curtain wall , Hyatt hotel (layout), setting as well

  • >Storefront/interior TI's

-Arcadia

-Truelite

-CRL

-FHC

My strong suits in these systems are establishing correct RO for Frame to fit correctly , Bedding sub sills, shoot elevation then recheck from sub sill to head/thermal break if head can is part of system, attention to details weather a punched opening or Door frame make sure frame has correct reveal, plumb square, and level

-door hardware such as drop plates, closures, panics, throw rods,mle power converters, mag locks,mle in panics, understanding of ADA codes, glass door concealed overhead closers (hold open/no hold),patch fittings,head/ground pivots(understanding the math that is needed from pivot to collar ),1/2"-3/8" butt glaze joints,wilson partition systems vestibules, egress

  • Project management
  • Quality assurance
  • Safety compliance
  • Problem solving
  • Employee training
  • Construction supervision
  • Blueprint interpretation
  • Project deadlines
  • Job planning

Certification

OSHA 30

Timeline

Foreman/Journeyman Glazier

Faus Glass
10.2023 - 01.2026

High School Diploma -

San Marcos HS
Rob Galvez