Goal-oriented individual with a pleasant personality and a tenacity that knows no restrictions. A motivated leader with strong organization skills and prioritization abilities. I have performed work all over the country. With experience in welding API 1104, B31.3 codes, API D1.1 and ASME Section IX, blueprints, organizing jobs, and converting difficult environments into safe and effective outcomes.
Meticulous and systematic welder bringing top-notch skills in inspection, testing and quality assurance. Proven skills in meeting demanding standards, maintaining safety and strengthening job site attitude. Skilled at creating detailed reports, maintaining records and working with management to resolve concerns.
Overview
11
11
years of professional experience
1
1
Certification
Work History
Welding Foreman
WHC Energy Services
01.2024 - Current
Enhanced welding quality by implementing rigorous inspection processes and providing feedback to team members.
Reduced project completion time by effectively managing resources and prioritizing tasks for the welding team.
Increased safety measures by conducting regular training sessions on proper equipment usage and workplace practices.
Collaborated with other foremen to streamline workflow, improving overall productivity across multiple projects.
Completed a seven electrical pump station for Targa Gas
Chief
Cleveland Integrity Services Inc.
05.2023 - 12.2023
Planned, directed, and controlled execution of administrative and compliance activities.
Reviewed Construction approved drawings and begin to build reports for welding and X-ray reports.
Allocated duties and activities of personnel, routinely inspect employee's equipment, appearance and work methods.
Reported status of operations to Project Managment, managing and directing day-to-day operations and supervising several divisions.
Reviewed upcoming projects and submitted manpower quotes and man hour projected costs
Welding Foreman
WHC Energy Services
05.2022 - 05.2023
Inspected products, components and materials for defects and compliance with tolerance standards.
Utilized visual inspection techniques as well as performing detailed measurements with hand-held tools and devices.
Streamlined QA processes by working closely with development teams and staying abreast of changing product demands.
Proposed and implemented improvements to reduce errors and rejected items.
Performed visual inspections and non-destructive weld tests where appropriate.
Oversaw daily operations at site, keeping team production moving at optimal pace.
Certified Welding Inspector
Gulf Field Services
03.2022 - 05.2022
Assist a large inspection team to work with the contractor(Michels) to build 134 miles of 42" in the state of Louisiana for Energy Transfer. I work as a dual certified (welding/coating) on a road bore crew.
Welding/Coating Inspector
Cleveland Integrity Services Inc.
03.2021 - 03.2022
Conducted inspections, tests and measurements of steel pipelines and Coating materials to verify adherence with regulations and desired specifications throughout PNG/Duke Pipelines.
Evaluated contractors recoating to assign grades and marked quality level, rejection status or acceptance through PNG/Duke standards.
Experienced minor to major steel corrosion and multiple coating systems used and exposed.(HBE-95, TC-20, Synergy, CTE, FBE, ARO)
Certified Welding Inspector
UPI
10.2020 - 02.2021
Worked with WHC to construct a new build out on (2) turbine compressor station with coolers, scrubber, fuel gas piping, instrument air piping, and stopple installs on the existing 36" line for station suction and discharge. Project involved communication between two inspection firms, engineering, gas company, third party contractors and product vendors. Produced job welding map/ log and MTR map/log. Had nine welders on site daily and kept track of certs, piping, mapping, and visual inspection on 2600+ welds within a four-five month period.
Welder
Hanging H
07.2020 - 08.2020
Conducted highly skilled special welds with extremely low tolerances for industrial operations on Kinder Morgan CO2 high pressure launcher and receiver 30” valve replacements. Prepared hydro test material list for KM approval and torqued up Stats plug removal tool and bicep tool.
Chief Inspector/Senior Welding Inspector
Quanta Services Inc.
12.2019 - 05.2020
Overseen the Welding procedures, welder testing, pipe tally, Company specs followed by contractor, held good communication between inspection office, x-ray company, construction manager, contractor, and company inspector representative on 23.34 miles of 24" pipeline for Sendero Gateway Project. Took over the Chief Inspector position towards the middle of the project. Organized paperwork and electronic filed job; overseen utility, coating, and welding inspectors and worked beside contractor to give the customer a professional product.
Chief Inspector
Tulsa Inspection Resources Inc.
09.2019 - 11.2019
40 miles of 16" .375 x60. Line runs from south of Pecos, TX to Wink, TX. Have to coordinate daily with multiple gas companies on line crossings and digs. Kept paperwork together in a professional and organized manner. Worked together with Salt Creek Midstream Inspection on making sure company specs are followed. Took on new faces in the inspection office that I have not worked with before and create a strong team. Resolved issues quickly and had forward vision on any issues that looked to problems ahead. Project finished mechanical completion date on time.
Chief Inspector
CIS / Southern Star Gas
07.2019 - 08.2019
Chief inspector over a heater and meter skid upgrade in Billings MO. Electrical, utilities, welding, coating, environmental, and safety. Worked with two gas companies to keep shutdown on schedule without any major delays. Keep job book over project in a professional order and sent in daily reports and weekly safety and environmental reports. Managed quality assurance program including on site evaluations, and internal audits. (July 21st - August 31st)
Pipe Welder
PSC Rockford
06.2019 - 07.2019
Installed 19 miles of 42" .600 wall x70 mainline pipeline through Freestone County in Texas. Left job with a 1.4% repair rate with 48 pipe welders. (June 10th- July 10th)
Welding Inspector
Cleveland Integrity Services Inc.
04.2019 - 06.2019
Over seeing a 12" line reroute in Woodward County, OK. Job consists of safety, environment, utility, coating, welding, and hydro testing for Southern Star Gas. Work daily with Southern Star inspection department and the State of Oklahoma to have a project that stays on schedule with safety being first priority and having a finished project with the absolute best product the contractor provided. (April 21st - June 8th)
Senior Welding Inspector
Cleveland Integrity Services Inc.
02.2019 - 03.2019
Over seen two contractors of the Williams Echo Springs Gas Plant expansion. Job consisted of utility, electrical, welding, and safety inspection. Concrete testing, hydro vac around live lines, Large lifts over live and loaded lines, along with keeping tract of contractor welders and the quality of welds being turned out. Tested multiple welders and evaluated the PID's over the plant shutdown for the hot tie ins for the expansion. (February 24th - March 30th)
Pipe Welder
Precision Pipeline LLC
08.2018 - 12.2018
Constructed 42” 888 wall pipeline through the state of West Virgina(Mountain Valley Pipeline) Used 1104 code with Real Time NDT. (September 13th - December 8th)
Pipe Welder
Michel's
04.2018 - 07.2018
Constructed a dual lay 20” and 16” lines near Altoona PA. Placed on testing to fab piping for water filling and dewatering operations. (April 1st - July 29th)
Pipe Welder
Precision Pipeline LLC
05.2017 - 10.2017
Tie-in's on 42" dual lay. Used SMAW and CRC automatic FCAR processes. 1104 code UT NDT (May 21st - October 8th)
Pipe Welder
Energy Services South
12.2016 - 03.2017
Constructed 50 miles of 12" 250 wall main line. 1104 code with RT NDT
Pipe Welder
Strike
07.2015 - 12.2016
2"-30" main line and fab to in-service repairs.
Pipe Welder
Venable's
03.2015 - 07.2015
Constructed 16" main line from Ardmore to Sherman, TX.
Welder Fabricator, QC, Weld Boss
Magnum Services
11.2014 - 03.2015
Constructed multiple well sites/tank batteries for Devon in South Texas. Ordered fittings, piping, X-ray services, over seen production and managed design of well pads. B313 code/1104 code
Repair Welder
Flint Energy
06.2014 - 11.2014
Constructed a four engine compressor station for Kinder Morgan in Cuero TX. Welded on 2" to 42" pipe that was tied into an existing 30" line from 1980's. Was also the repair welder to repair any defects found with the 1104 code.
Pipe Welder
Two Rivers Pipeline Construction
05.2013 - 08.2013
Installed a 12" mainline for Sunoco through OK to Bowie TX.