Professional inspector with strong expertise in quality control and regulatory compliance. Proven track record in leading inspection teams, ensuring safety and precision in every task. Skilled in problem-solving, process optimization, and maintaining high standards. Dependable team player with focus on achieving results and adapting to changing needs. Hard-working Site Manager with 21 years of experience. Educated in OSHA safety requirements and experienced leading team of over [Number] workers. Proficient in carpentry, flooring installation, concrete work, framing, cabinetry, painting, and forklift operation. Diligent construction observation with robust background in overseeing construction projects. Successfully managed multiple large-scale projects, ensuring compliance with specifications and safety regulations. Demonstrated expertise in team coordination and problem-solving. Dynamic individual with hands-on experience in construction inspection and talent for navigating challenges. Brings strong problem-solving skills and proactive approach to new tasks. Known for adaptability, creativity, and results-oriented mindset. Committed to making meaningful contributions and advancing organizational goals. Hardworking and passionate job seeker with strong organizational skills eager to secure entry-level RRR position. Ready to help team achieve company goals.

Overview

22
22
years of professional experience
1
1
Certification

Work History

Lead Inspector, Construction Administrator

City of Anoka
04.2004 - Current
  • Greenhaven Golf Course Entrance and TH 10 Interchange Landscape, Anoka, MN
  • Reviewed and analyzed inspection reports, ensuring consistency in documentation and findings.
  • Managed inspection schedules to ensure timely completion of projects without compromising quality or safety standards.
  • Maintained accurate records of all inspections performed, contributing to an organized database for future reference and analysis.
  • Prepared reports detailing findings of inspections, investigations, and tests.

Construction Administrator

Metropolitan Council
04.2004 - Current
  • Advanced Design Consultant Services for the Metro Green Line Extension (Southwest LRT) Project, Minneapolis, MN
  • Reviewed project plans and specifications to identify discrepancies and recommend adjustments.
  • Facilitated smooth handover of completed projects to clients, addressing any concerns promptly and professionally.
  • Reviewed and analyzed blueprints, ensuring all plans adhered to building codes and client specifications.
  • Managed pre-opening, operator turnover and project closeout.
  • Conducted thorough site inspections at various stages of construction, ensuring compliance with regulatory standards and client requirements.
  • Identified and resolved construction issues promptly to prevent delays.
  • Verified completed projects met approved time, quality, and cost estimates.

Senior Lead Inspector, Construction Administrator

City of Anoka
04.2004 - Current
  • Very high profile 7 block downtown rehabilitation project consisting of Sidewalks, Street full depth R&R, mill and overlays, maintaining access to all businesses at all times, removal and replacement of pavers, Lighted street crossing, irrigation upgrades, Design and build a city fountain with the ability to house a Christmas tree for the holiday season.
  • Main Street Improvements, Anoka, MN
  • Conducted comprehensive inspections to ensure compliance with city regulations and safety standards.
  • Reviewed inspection reports for accuracy, ensuring adherence to regulatory guidelines and best practices.
  • Achieved a high level of customer satisfaction by addressing concerns promptly and professionally throughout the inspection process.
  • Facilitated open lines of communication between inspectors, management, clients, and regulatory bodies – resulting in improved collaboration across all parties.
  • Maintained accurate records of all inspections performed, contributing to an organized database for future reference and analysis.

Lead Inspector, Construction Administrator

City of Edina
04.2004 - Current
  • Parking ramp deck rehabilitation, sidewalk removal and replacement of pavers, irrigation upgrades.
  • 50th and France District Improvements, Edina, MN
  • Managed inspection schedules to ensure timely completion of projects without compromising quality or safety standards.
  • Achieved a high level of customer satisfaction by addressing concerns promptly and professionally throughout the inspection process.
  • Facilitated open lines of communication between inspectors, management, clients, and regulatory bodies – resulting in improved collaboration across all parties.
  • Prepared reports detailing findings of inspections, investigations, and tests.

Senior Construction Observer

Detroit Metropolitan Wayne County Airport
04.2004 - Current

Kimley-Horn provided planning, design, and construction phase services for the reconstruction of one of the primary departure runways and parallel taxiways. The project included full-depth reconstruction of 17” PCC section; replacing the storm drain system; infield grading; underdrain system; saw-cut grooving; pavement markings; replacement of airfield electrical including runway centerline lights, runway edge lights, elevated runway guard lights, in-pavement runway guard lights, taxiway edge lights, guidance signs, pavement surface sensors and replacement of NAVAIDS including PAPIs; REILs; and RVRs.

Responsibilities: was responsible for leading field staff and assuring that it was constructed in conformance with the contract documents. In addition I was responsible for the P-501 pavement for the project, tracking quantities and assisting in processing progress payments, ensuring all daily reports are completed, and reviewing material tests.

  • Runway 3L/21R and Associated Taxiways Reconstruction, Detroit, MI
  • Monitored airport operations to ensure compliance with safety regulations and protocols.
  • Conducted regular inspections of facilities, identifying issues for timely resolution.
  • Assisted in training new observers, sharing knowledge and best practices for accurate data collection procedures.
  • Developed strong working relationships with local community members, fostering trust and open communication channels that facilitated successful observational studies.

RPR, Construction Administrator

Detroit Metropolitan Wayne County Airport
04.2004 - Current
  • McNamara Terminal Apron Rehabilitation (Gates A4-A72), Detroit, MI
  • Managed contractor schedules, optimizing workflow and minimizing delays in construction projects.
  • Reviewed and approved payment applications, maintaining accuracy and adherence to budget constraints.
  • Managed project documentation and ensured compliance with regulatory requirements.
  • Conducted site inspections to monitor progress and adherence to specifications and safety standards.
  • Trained junior staff on administrative procedures and best practices in construction management.
  • Ensured timely completion of projects by closely monitoring progress and adjusting schedules as needed.

RPR Construction Administrator

City of Boulder City
04.2004 - Current
  • Boulder City Municipal Airport: Access Road Reconstruction Task and Enhanced Airfield Drainage Phase II Task, Boulder City, NV
  • Reviewed contractor submissions and ensured adherence to contract specifications.
  • Maintained detailed records of all project-related documentation, ensuring easy access for auditing purposes or future reference by stakeholders.
  • Managed budgets effectively, identifying opportunities for cost savings without compromising quality or deadlines.
  • Facilitated smooth handover of completed projects to clients, addressing any concerns promptly and professionally.
  • Conducted thorough site inspections at various stages of construction, ensuring compliance with regulatory standards and client requirements.
  • Reviewed and analyzed blueprints, ensuring all plans adhered to building codes and client specifications.
  • Identified and resolved construction issues promptly to prevent delays.

Senior Inspector Construction Administrator

Detroit Metropolitan Wayne County Airport
04.2004 - Current
  • Centralized Deicing Facility and Runway 21R Hold Bay, Detroit, MI

Construction Administrator

Hillwood Investment Properties
04.2004 - Current
  • FedEx Facility Relocation at Detroit Metro Wayne County Airport (DTW), Detroit, MI

Senior Inspector, Construction Administrator

City of Arden Hills
04.2004 - Current
  • Old Snelling Avenue Bridge Replacement, Arden Hills, MN

RPR, Construction Administrator

Detroit Metropolitan Wayne County Airport
04.2004 - Current
  • McNamara Apron Modifications and New Hardstand Positions, Detroit, MI

Construction Administrator

City of Richfield
04.2004 - Current
  • 66th Street Reconstruction, Richfield, MN

Resident Project Representative (RPR)

Detroit Metropolitan Wayne County Airport
04.2004 - Current
  • Taxiway Z extension was done accommodating access to FedEx and Spirit Airline Facility’s.
  • Responsibilities: was responsible for leading construction weekly meetings, leading field staff and assuring that it was constructed in conformance with the contract documents. In addition, Bob was responsible for the P-501 pavement for the project, tracking quantities and assisting in processing progress payments, and reviewing material tests.
  • Partial Extension of Taxiway Z, Detroit, MI

Senior Construction Observer

Detroit Metropolitan Wayne County Airport
04.2004 - Current
  • Kimley-Horn provided planning, design, and construction phase support for the construction of a new centralized deicing facility (CDF) and a new runway hold bay at Detroit Metropolitan Wayne County International Airport (DTW). The CDF includes deicing positions for seven ADG III aircraft with the option of one ADG V aircraft deicing spot. The facility also includes a new taxi lane, 11 overnight parking spots for aircraft, lighting, and associated ancillary facilities to support the deicing operations. The Runway 21R Hold Bay will provide needed standing space for two ADG III or one ADG V aircraft and a reconstructed ADG V taxi lane for one of the Airport’s fixed-base operators (FBOs). Infrastructure is included with the CDF to capture high concentrate glycol run-off from deicing activities for off-site reprocessing.
  • Responsibilities: Bob was responsible for leading field staff and assuring that it was constructed in conformance with the contract documents. In addition, Bob was responsible for the P-501 pavement for the project, tracking quantities and assisting in processing progress payments, ensuring all daily reports are completed, and reviewing material tests.
  • Centralized Deicing Facility and Runway 21R Hold Bay, Detroit, MI

Construction Administrator

Wayne County Airport Authority
04.2004 - Current
  • Professional Engineering and Related Services for Airfield Projects at Detroit Metro and Willow Run, Detroit, MI

Resident Project Representative (RPR)

Detroit Metropolitan Wayne County Airport
04.2004 - Current
  • Kimley-Horn developed construction documents to rehabilitate the existing PCC apron pavement for Gates A4-A72. We performed pavement analysis to determine the limits of rehabilitation, survey, pavement analysis and pavement design, specialized demolition, geometrics, drainage modifications, modifications to the hydrant fueling system, pavement markings, construction safety and phasing, and stakeholder. To minimize impacts to Delta’s schedule, the project was sequenced where only two widebody or three narrow body gates could be taken out of service at a time. Each gate took approximately 45 days to complete. This work was done over a 3-year period from 2015-2017.
  • Responsibilities: Bob was responsible for leading pre-construction conferences, conducting weekly construction meetings, answering requests for information (RFI’s), tracking quantities, processing progress payments, developing close-out documents, managing the on-site field staff, ensuring all daily and weekly reports are completed, managing quality assurance testing, reviewing material tests, and managing survey requests.
  • McNamara Terminal A Apron Rehabilitation (Gates A4-A72), Detroit, MI

Resident Project Representative (RPR)

Detroit Metropolitan Wayne County Airport
04.2004 - Current
  • McNamara Island Infill Project, Detroit, MI

Resident Project Representative (RPR)

Detroit Metropolitan Wayne County Airport
04.2004 - Current
  • WCAA tasked Kimley-Horn to develop construction documents for the rehabilitation of the Runway 21R deicing pad as part of an overall project that included surface and safety upgrades to Runway 3L/21R. As part of the project, Kimley-Horn was tasked with developing different rehabilitation alternatives from asphalt mill & overlay to full reconstruction in portland cement concrete pavement. Kimley-Horn completed an in-depth review of the existing deicing facility including pavement analysis and geotechnical; condition of the existing utilities including lighting, signage, and storm sewer system; and existing configurations. The rehabilitation included a 3” mill with a 5” asphalt overlay, reconfiguration of the deicing spots to meet current FAA standards, and additional guidance signs.
  • Responsibilities: Bob was responsible for leading pre-construction conferences, conducting weekly construction meetings, answering requests for information (RFI’s), tracking quantities, processing progress payments, developing close-out documents, managing the on-site field staff, ensuring all daily and weekly reports are completed, managing quality assurance testing, reviewing material tests, and managing survey requests.
  • Runway 3L/21R Surface and Safety Upgrades Including Runway 21R Deicing Pad Overlay Facility, Detroit, MI

Senior Construction Observer

Detroit Metropolitan Wayne County Airport
04.2004 - Current
  • Kimley-Horn is providing engineering, bid phase, and construction phase services for the McNamara Terminal apron reconstruction program at Detroit Metropolitan Wayne County Airport. This is a multi-year, multiphase project that includes the reconstruction of the apron pavement around Concourses A, B, and C and reconstruction of the adjacent taxiways and taxi lanes. We performed pavement analysis to determine the limits of rehabilitation, survey, pavement analysis and pavement design, specialized demolition, geometrics, drainage modifications, modifications to the hydrant fueling system, pavement markings, construction safety and phasing, and stakeholder.
  • Responsibilities: Bob is responsible for overseeing the day-to-day activities in the field, assigning field staff, tracking quantities, reviewing and processing progress payments, ensuring all daily and weekly reports are completed, managing quality assurance testing, reviewing material tests, and managing survey requests.
  • McNamara Terminal Apron Reconstruction – Package #1 – Package #4, Detroit, MI

Lead Inspector

Boulder City Municipal Airport
05.2011 - 01.2012
  • Bob worked on this project for 4 consecutive winter construction seasons in NV. Project consisted of several large concrete drainage channels, box culverts storm sewer upgrades.
  • Grading and Drainage Project, Boulder City NV

Lead Inspector

Highway 22
05.2011 - 01.2012
  • $32,300,000.00/14-mile Heavy HWY re-construct project included, culverts, realignments, soil corrections, cattle pass, grading, managing borrow pits erosion control, and traffic control. Tracking quantities with the CARS system. In addition to being lead inspector, Bob was responsible for communicating with NDDOT and rural residents on construction activities, detours, and traffic control issues.
  • Western North Dakota

Lead Inspector

Regrade and reconstruction of Whitewood & Birch Road
07.2008 - 11.2008
  • This was a street reconstruction project. Bob was responsible for item record accounts, scheduled testing according to specifications, and monitored soil. Bob coordinated with project manager and hosted weekly communication meetings with residents.
  • Credit River Township, Prior Lake, MN

Lead Inspector

Reconstruction of Sycamore St. N.W and Redwood St. N.W
04.2008 - 07.2008
  • Bob was responsible for item record accounts (IRA), scheduled testing, monitored soil for corrections, monitoring set up of sanitary sewer bypass, and temporary water service. Effectively communicated with project manager and residents.
  • Coon Rapids, MN

Lead Inspector

Commercial Development Site Work
04.2007 - 11.2007
  • Target Store and Bob's Produce Mart, Otsego, MN

Education

High School Diploma -

Northeast Iowa Community college

GED -

Lake Superior Collage
Duluth, MN

Skills

  • Quality control
  • Career development assistance
  • Quality assurance standards
  • Standards adherence proficiency

Certification

  • [Area of certification] Training - [Timeframe]

Registrations And Certifications

  • Bituminous Plant 2, Bituminous Street, MN
  • Concrete Plant 2, Concrete Field
  • Aggregate Production
  • Grading and Base
  • Erosion and Stormwater Management
  • Workzone Safety/Traffic Control

Personal Information

Title: Senior Construction Observer

Timeline

Lead Inspector

Boulder City Municipal Airport
05.2011 - 01.2012

Lead Inspector

Highway 22
05.2011 - 01.2012

Lead Inspector

Regrade and reconstruction of Whitewood & Birch Road
07.2008 - 11.2008

Lead Inspector

Reconstruction of Sycamore St. N.W and Redwood St. N.W
04.2008 - 07.2008

Lead Inspector

Commercial Development Site Work
04.2007 - 11.2007

Lead Inspector, Construction Administrator

City of Anoka
04.2004 - Current

Construction Administrator

Metropolitan Council
04.2004 - Current

Senior Lead Inspector, Construction Administrator

City of Anoka
04.2004 - Current

Lead Inspector, Construction Administrator

City of Edina
04.2004 - Current

Senior Construction Observer

Detroit Metropolitan Wayne County Airport
04.2004 - Current

RPR, Construction Administrator

Detroit Metropolitan Wayne County Airport
04.2004 - Current

RPR Construction Administrator

City of Boulder City
04.2004 - Current

Senior Inspector Construction Administrator

Detroit Metropolitan Wayne County Airport
04.2004 - Current

Construction Administrator

Hillwood Investment Properties
04.2004 - Current

Senior Inspector, Construction Administrator

City of Arden Hills
04.2004 - Current

RPR, Construction Administrator

Detroit Metropolitan Wayne County Airport
04.2004 - Current

Construction Administrator

City of Richfield
04.2004 - Current

Resident Project Representative (RPR)

Detroit Metropolitan Wayne County Airport
04.2004 - Current

Senior Construction Observer

Detroit Metropolitan Wayne County Airport
04.2004 - Current

Construction Administrator

Wayne County Airport Authority
04.2004 - Current

Resident Project Representative (RPR)

Detroit Metropolitan Wayne County Airport
04.2004 - Current

Resident Project Representative (RPR)

Detroit Metropolitan Wayne County Airport
04.2004 - Current

Resident Project Representative (RPR)

Detroit Metropolitan Wayne County Airport
04.2004 - Current

Senior Construction Observer

Detroit Metropolitan Wayne County Airport
04.2004 - Current

High School Diploma -

Northeast Iowa Community college

GED -

Lake Superior Collage
Robert Anthoney