Summary
Overview
Work History
Education
Skills
Timeline
Generic

Robert Dominguez

Summary

Hardworking professional well-versed in handling materials, operating machinery and supporting overall team and project needs. In-depth knowledge of compliance mandates governing site and worker safety. Focused on helping complete skilled work under deadlines.

Overview

3
3
years of professional experience

Work History

Construction Worker

2 Brothers Construction
Ontario
01.2025 - 12.2025
  • Installed frameworks, walls, and structures according to specifications.
  • Performed various carpentry tasks such as constructing walls, installing doors, windows and siding.
  • Completed carpentry work and installed crown molding and wood flooring to meet customer preferences.
  • Operated construction tools and equipment for various projects.
  • Utilized power tools such as saws, drills, and sanders on projects.
  • Assisted in site preparation and material handling to support project timelines.
  • Coordinated with onsite workers to facilitate timely and efficient task completion.
  • Collaborated with team members to complete project milestones.
  • Maintained clean job sites by safely removing debris, dirt, and hazardous materials.
  • Mixed concrete, mortar and other materials to prepare building material.
  • Measured distances accurately using tape measures or laser measuring devices.
  • Inspected work areas for safety issues before beginning any task.
  • Repaired damaged structures with appropriate materials including wood and metal components.

Tile Setter Helper

Smp tile
Rancho Cucamonga
04.2023 - 11.2024
  • Assisted in preparing surfaces for tile installation at Smp Tile.
  • Mixed and applied adhesives for tile setting tasks effectively.
  • Cut tiles to size using appropriate tools and techniques.
  • Supported the installation of various tile materials on floors and walls.
  • Loaded and unloaded materials, ensuring proper handling and safety protocols.
  • Aligned tiles along reference lines using level and straightedge tools.
  • Cleaned surfaces prior to tiling to ensure smooth surface.
  • Maintained cleanliness at work site throughout project duration.
  • Removed excess grout from the surface of the newly installed tiles.
  • Grouted joints between tiles with rubber float and sponges for a seamless finish.
  • Cut tiles with wet saws and nippers for installation.
  • Applied sealants and waterproofing compounds after tile installation is complete.
  • Mixed mortar, thinset, epoxy, or other adhesives according to manufacturer's instructions.
  • Cleaned and leveled surface areas and removed excess grout.

Education

Ged
Susanville, CA

Skills

  • Construction safety
  • Blueprint interpretation
  • Equipment maintenance
  • Project management
  • Team collaboration

Timeline

Construction Worker

2 Brothers Construction
01.2025 - 12.2025

Tile Setter Helper

Smp tile
04.2023 - 11.2024

Ged
Robert Dominguez