Summary
Overview
Work History
Education
Skills
Timeline
Generic

Robert Houston

Pensacola

Summary

I am an nccer pipefitter/ pipe foreman with over 23 years exp. my main objective is to make sure my crew works as safe as possible, and as efficiently to get the job complete in a timely manner.

Overview

23
23
years of professional experience

Work History

Pipe Foreman

Greywolf Construction
09.2023 - 03.2024
  • Supervised team of 12 in field fabrication and installation of stainless piping systems.
  • Fabricated necessary support structures for construction sites.

Foreman

Kiewit
01.2003 - 12.2023
  • Managed performance of vacuum system in secondary containment pipes.
  • Enhanced service delivery outcomes.

Pipe Foreman/ General Foreman

KIK Biolab
04.2023 - 11.2023
  • Led the installation of both stainless steel and carbon steel piping systems with a crew of 10 on night shift.
  • Supervised layout, assembly and installation of various sizes and types of drainage pipes.
  • Liaised between field engineers and trade workers align construction projects with drawings and specifications.
  • Assembled and secured pipes, tubes, fittings and related equipment according to project specifications.
  • Collaborated effectively with project managers to ensure seamless integration of piping systems into larger construction initiatives, ensuring timely completion of all work.
  • Ensured accurate documentation of all completed work, including detailed records of materials used, labor hours logged, and any changes made during the course of the project.

Pipe Fitter

Serf INC
12.2021 - 02.2023
  • Executed production of pre-fabricated piping assemblies for efficient installation processes.
  • Threaded pipes using piping machines.
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
  • Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.

Pipe Foreman

Brown and Root
03.2021 - 09.2021
  • Executed installation of carbon steel, stainless steel, and chrome pipes into racks and units.
  • Supervised layout, assembly and installation of various sizes and types of drainage pipes.
  • Assembled and secured pipes, tubes, fittings and related equipment according to project specifications.
  • Led a highly motivated team that consistently met or exceeded performance expectations while maintaining a positive working environment conducive to collaboration and continuous learning.
  • Enhanced project efficiency by implementing effective pipe installation and repair strategies.

Pipe Foreman

Wyatt Field Service
01.2020 - 01.2021
  • Directed exchanger rebuild projects in Coker units, coordinating efforts of a 18-member crew.
  • Assembled and secured pipes, tubes, fittings and related equipment according to project specifications.
  • Supervised layout, assembly and installation of various sizes and types of drainage pipes.
  • Enhanced project efficiency by implementing effective pipe installation and repair strategies.
  • Implemented innovative solutions for complex piping issues, such as challenging terrain or unique system configurations, resulting in minimal delays or disruptions to ongoing work.
  • Led a highly motivated team that consistently met or exceeded performance expectations while maintaining a positive working environment conducive to collaboration and continuous learning.

Pipe Fitter

Wood
01.2019 - 12.2019
  • Completed installations of piping systems into racks with crane assistance.
  • Pre-fabricated racks on ground to streamline installation process.
  • Threaded pipes using piping machines.
  • Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
  • Fabricated pipe sections and components to specification using cutting, threading and welding equipment.
  • Promoted a safe work environment by adhering to company safety policies and procedures at all times during pipefitting operations.

Pipe Foreman

Sun Industrial Group
02.2018 - 11.2018
  • Supervised installation and fabrication of pipework with a crew of 15.
  • Directed lining of 9 chrome to carbon steel and stainless steel.
  • Assembled and secured pipes, tubes, fittings and related equipment according to project specifications.
  • Enhanced project efficiency by implementing effective pipe installation and repair strategies.
  • Implemented innovative solutions for complex piping issues, such as challenging terrain or unique system configurations, resulting in minimal delays or disruptions to ongoing work.
  • Continuously expanded industry knowledge by attending relevant training courses and staying up-to-date on emerging trends, technologies, and techniques in the field of pipe installation and maintenance.
  • Ensured accurate documentation of all completed work, including detailed records of materials used, labor hours logged, and any changes made during the course of the project.
  • Maintained open lines of communication with clients throughout the duration of each project, providing updates on progress and addressing any concerns promptly and professionally.

Pipefitter

Nash Construction
04.2017 - 01.2018
  • Designed and installed chill water piping systems overhead within facilities.
  • Interpreted technical drawings to ensure proper installation placement.
  • Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.
  • Threaded pipes using piping machines.
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
  • Fabricated pipe sections and components to specification using cutting, threading and welding equipment.
  • Promoted a safe work environment by adhering to company safety policies and procedures at all times during pipefitting operations.
  • Facilitated smooth project execution by interpreting isometric drawings for accurate installation or modification of piping systems.

Structure Foreman

Turner Industries
08.2015 - 03.2017
  • Over installing pipe supports in front of the pipe being installed
  • On location reading isos to install in the right location line out crew of 10.
  • Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
  • Maintained a safe working environment through adherence to safety protocols and regular site inspections.
  • Ensured timely completion of projects with effective time management and prioritization of tasks.
  • Checked equipment to determine if maintenance was required.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Addressed issues proactively, resolving problems quickly to minimize delays in project timelines.
  • Enhanced team productivity by providing clear direction, setting expectations, and offering constructive feedback.

Pipe Foreman/Hydro Foreman

Jacobs
10.2014 - 07.2015
  • Supervised hydro system settings during pipe installation.
  • Supervised layout, assembly and installation of various sizes and types of drainage pipes.
  • Liaised between field engineers and trade workers align construction projects with drawings and specifications.
  • Assembled and secured pipes, tubes, fittings and related equipment according to project specifications.
  • Maintained open lines of communication with clients throughout the duration of each project, providing updates on progress and addressing any concerns promptly and professionally.
  • Ensured accurate documentation of all completed work, including detailed records of materials used, labor hours logged, and any changes made during the course of the project.
  • Increased crew productivity through regular training sessions on safety protocols and industry best practices.

Pipe Foreman

The Atlantic Group
03.2012 - 09.2014
  • Executed various piping operations, including installation and fabrication, within multidisciplinary teams.
  • Liaised between field engineers and trade workers align construction projects with drawings and specifications.
  • Supervised layout, assembly and installation of various sizes and types of drainage pipes.
  • Assembled and secured pipes, tubes, fittings and related equipment according to project specifications.
  • Enhanced project efficiency by implementing effective pipe installation and repair strategies.
  • Implemented innovative solutions for complex piping issues, such as challenging terrain or unique system configurations, resulting in minimal delays or disruptions to ongoing work.
  • Led a highly motivated team that consistently met or exceeded performance expectations while maintaining a positive working environment conducive to collaboration and continuous learning.
  • Optimized resource allocation by effectively managing equipment, materials, and personnel for multiple projects simultaneously.

Pipe Fitter

Offshore Inland
11.2010 - 02.2012
  • Performed tasks in both the fabrication shop and on offshore rigs.
  • Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.
  • Threaded pipes using piping machines.
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
  • Fabricated pipe sections and components to specification using cutting, threading and welding equipment.
  • Promoted a safe work environment by adhering to company safety policies and procedures at all times during pipefitting operations.
  • Installed new systems and connected piping to existing components by welding, bolting and threading.
  • Facilitated smooth project execution by interpreting isometric drawings for accurate installation or modification of piping systems.

Pipe Fitter

Tecneco
06.2008 - 12.2009
  • Skilled in cutting, preparing, and fitting stainless steel and copper-nickel pipes in modules for navy applications.
  • Specialized in management and operations of maritime vessels.

Bender Shipyard / Pipe Fitter

09.2005 - 03.2008
  • Pipe installation on barges and cruse ships cutting prepping piping and supports to be installed, reading isos fitting putting on location.

Pipe Helper

Flour Daniels Construction
09.2001 - 08.2005
  • Engaged in operations at four separate locations with Flour Daniel.
  • Enterprise Generation Station
  • Blacksburg SC
  • Duke Power
  • Blewscreek NC
  • Duke power
  • Forney TX
  • Forney Energy Center

Education

Savannah High School
1991

Skills

  • GENERAL DIPLOMA
  • NCCER
  • Skills & abilities
  • SUPERVISION
  • Problem solving
  • Communication
  • Leadership
  • Auto cad proficient
  • Microsoft skills
  • Draft and design

Timeline

Pipe Foreman

Greywolf Construction
09.2023 - 03.2024

Pipe Foreman/ General Foreman

KIK Biolab
04.2023 - 11.2023

Pipe Fitter

Serf INC
12.2021 - 02.2023

Pipe Foreman

Brown and Root
03.2021 - 09.2021

Pipe Foreman

Wyatt Field Service
01.2020 - 01.2021

Pipe Fitter

Wood
01.2019 - 12.2019

Pipe Foreman

Sun Industrial Group
02.2018 - 11.2018

Pipefitter

Nash Construction
04.2017 - 01.2018

Structure Foreman

Turner Industries
08.2015 - 03.2017

Pipe Foreman/Hydro Foreman

Jacobs
10.2014 - 07.2015

Pipe Foreman

The Atlantic Group
03.2012 - 09.2014

Pipe Fitter

Offshore Inland
11.2010 - 02.2012

Pipe Fitter

Tecneco
06.2008 - 12.2009

Bender Shipyard / Pipe Fitter

09.2005 - 03.2008

Foreman

Kiewit
01.2003 - 12.2023

Pipe Helper

Flour Daniels Construction
09.2001 - 08.2005

Savannah High School
Robert Houston