Summary
Overview
Work History
Education
Skills
Timeline

Robert Montoya

Albuquerque,NM

Summary

Dynamic, results-driven professional seeking a challenging position that leverages extensive experience, education, and skills to drive growth and advancement. Adept at navigating complex environments with a strategic mindset, consistently delivering exceptional outcomes. Committed to fostering innovation and efficiency while contributing to team success and organizational excellence. Proven track record of achieving ambitious goals within fast-paced settings.

Overview

26
26
years of professional experience

Work History

SPS/CT Ramp Specialist

Tokyo Electron
01.2021 - 06.2025
  • Oversee SPS/CT tool install ramp at Intel NMDM. Coordinate with trades/customer on maintaining schedules and TEA personnel.

SPS Engineer In Charge

Tokyo Electron
01.2018 - 01.2021
  • Oversee new equipment install in Wet Etch group. In charge of site for Wet Etch and TEA personnel. Provide equipment support and guidance to customer. Assist customer in diagnosing hardware/software issues and issues related to particle generation. Diagnose equipment errors and perform/schedule necessary equipment repairs, complete periodic maintenance and FCNs, ECNs, train customer in maintenance and repairs on covered toolsets.

CT SU Engineer

Tokyo Electron
01.2006 - 01.2018
  • Install and set up select TEL equipment at various customer sites. Maintain installation schedule and record progress. Interact with customer and various trades to maintain installation schedule and solve any issues that arise. Diagnosed and repaired startup failures both mechanical and software related. Coordinate daily activities with other TEL employees to schedules and maintain proper tool coverage.

Automation Technician

SUMCO USA
01.2002 - 01.2006
  • Provide software and equipment support for manufacturing on data acquisition applications and wafer sorters, including Installation, configuration, repair and upgrades. Repairing of system malfunctions include troubleshooting electronics, robotics, operating system, and computer hardware. Support of network in fab to Cell Controllers and fab computers, and database maintenance. Equipment currently supporting: Recif IDLW8s, Cybeg wafer sorters, and Ultracision BIS inspection stations.

Associate Engineer

LSI Logic
01.1999 - 01.2001
  • Supported Photolithography Engineers and the Production group by running needed projects, investigating, and correcting process deviations. Troubleshot file and alignment problems on ASML scanners. Coordinated between various groups to acquire tool time and run needed projects to maximize production output and engineering tests. Programmed KLA5200 Overlay and TEL ACT8 Clean Tracks.

Education

B.S. - Electronic Engineering Technology

ITT Technical Institute, Albuquerque, NM
01.2002

Skills

  • Twenty years’ direct experience installing and maintaining TEL semiconductor capital equipment
  • Over twenty years of semiconductor experience in Lithography and Surface Prep Systems
  • Excellent problem solving, communication, and teamwork skills
  • Supervisory experience organizing and utilizing company assets to achieve and surpass set goals
  • Self-starter with strong organizational skills
  • Customer relations
  • Expert problem solving
  • Analytical thinking
  • Documentation management
  • Quality assurance
  • Proficient in MS Office
  • Root-cause analysis

Timeline

SPS/CT Ramp Specialist - Tokyo Electron
01.2021 - 06.2025
SPS Engineer In Charge - Tokyo Electron
01.2018 - 01.2021
CT SU Engineer - Tokyo Electron
01.2006 - 01.2018
Automation Technician - SUMCO USA
01.2002 - 01.2006
Associate Engineer - LSI Logic
01.1999 - 01.2001
ITT Technical Institute - B.S., Electronic Engineering Technology
Robert Montoya