Overview
Work History
Education
Skills
Goals
Timeline
Generic

Robert Rigoni

Kingsford,MI

Overview

12
12
years of professional experience

Work History

Superintendent

Bacco Construction Company
04.2025 - Current
  • Review work orders and plans.
  • Track every material used on site.
  • Monitor production daily.
  • Line crews out for tasks.
  • Track craft and equipment hours.
  • Do payroll while turning in quantities.
  • Work with project inspectors daily.
  • Assist craft workers with daily activities.
  • Review job cost reports.
  • Communicate daily/weekly goals with crew and project managers.
  • Communicate with residents about project activities.
  • Direct trucks to waste areas, project locations, and material site.
  • Take inventory of materials and tools.
  • Report weekly equipment hours.
  • Ensure safety for all tasks.
  • Use GPS for project limits and grades.
  • Operated/Labor when needed.

Project Manager / Estimator

Rieth-Riley Construction Co
01.2023 - 12.2024
  • Met with customers for projects to bid.
  • Reviewed sites, shot elevations, quantified area for materials on each site.
  • Attend pre-bid meeting.
  • Priced and distribute proposals.
  • Communicated and received quotes from subcontractors.
  • Built weekly schedules for trucks, crews and subcontractors.
  • Attend weekly meetings with other Project Mangers.
  • Process signed proposals, set up jobs in the companies system.
  • Billed customers on completion of the projects.
  • Payed subcontractors once their scope of work was complete.
  • Handled and addressed concerns from customers.
  • Review plans, specifications and project financials,
  • Distribute work orders and plans.

Construction Coordinator

Mj Electric - Drilling
09.2022 - 11.2022
  • Worked manual labor with the craft employees pour foundations for transmission lines.
  • Cut and rigged rebar cages.
  • Built and adjusted concrete forms off control points.
  • Ensured coworkers had the right tools for each task.
  • Tracked the amount of concrete while timing each pour to make sure the forman was aware of cold joints for project specific specifications.
  • Tracked concrete temperatures per project specifications in the colder months.

Field Engineer

Mortenson Construction
12.2021 - 08.2022
  • Coordination of subcontractor activities, maintaining project schedules.
  • Perform daily inspections of construction site.
  • Quantify materials used on site,
  • Ordered materials needed for site specific projects.
  • Tracked quality control.
  • Wrote and maintained field logs for each scopes of work being performed throughout each day.

Laborer

Bacco Construction Company
06.2014 - 08.2021
  • Formed sidewalk, curb, bridge approaches, and footing. Can also finish concrete
  • Responsible for taking density cores for the Michigan Department of Transportation. Cord Highways and shot with gauge
  • Shovel, looted, and compacted asphalt, gravel, sand.
  • Cut and Fill with Trimble GPS system with excavator.
  • Operated crush and shapes along with grader crews. Balanced and Fine graded.
  • Adjusted manhole covers, water boxes, and catch basins to correct elevation, asphalt preparation.
  • Responsible for top soil restorations
  • Laid 18" and 36" storm pipe along with manholes and cross culverts.
  • Cut straight buttjoints for asphalt with chop saw
  • Networked with inspectors for proper activites
  • Operated rollers, broom, water truck, rubber-tire backhoe, skid steers, ect.
  • Spent time with polverizors and milling machines with Lois Kay and Payne and Dolan
  • Checked yield with grade lifts along with collecting tickets.

Education

Bachelor of Arts - Construction Management

Northern Michigan University
Marquette, MI
12.2021

Skills

  • Construction knowledge
  • Hand and power tool operation
  • Project management
  • Heavy equipment operation
  • Materials coordination
  • Safety awareness
  • Leadership
  • Problem solving
  • Networking
  • Bid 2 Win
  • Construction software's
  • Coordinate, Collaborate, Communicate with all employees

Goals

To work during the winter months until spring. 

Timeline

Superintendent

Bacco Construction Company
04.2025 - Current

Project Manager / Estimator

Rieth-Riley Construction Co
01.2023 - 12.2024

Construction Coordinator

Mj Electric - Drilling
09.2022 - 11.2022

Field Engineer

Mortenson Construction
12.2021 - 08.2022

Laborer

Bacco Construction Company
06.2014 - 08.2021

Bachelor of Arts - Construction Management

Northern Michigan University
Robert Rigoni