Summary
Overview
Work History
Education
Skills
Timeline
Generic

Robert Shugars

Fort Wayne,IN

Summary

Experienced press operations professional prepared for this role. Skilled in machine setup, quality control, and troubleshooting. Strong focus on team collaboration and achieving results. Reliable and adaptable to changing needs, ensuring optimal performance and efficiency. Utilizes technical skills to troubleshoot and maintain equipment, ensuring minimal downtime. Strong understanding of quality control processes and production efficiency, contributing to consistent high-quality outputs.

Overview

15
15
years of professional experience

Work History

Press Operator

Elringklinger
12.2022 - Current
  • Performed regular maintenance on press machinery to optimize performance.
  • Loaded and positioned raw materials in loading and feeding mechanisms.
  • Followed safety protocols to reduce operating risks on press machinery.
  • Multi-tasked to keep all assigned projects running effectively and efficiently.
  • Performed changeovers for different PIDs, installed automation, set dies, changed programming.
  • Process trainer and assembly team leader as well.

Supercell Operator

Nisco
01.2021 - 09.2022
  • Operated various types of machinery, demonstrating versatility and adaptability in diverse work environments.
  • Maintained a safe working environment by enforcing strict adherence to safety guidelines
  • Provided on-the-job training to newly hired workers and team members.
  • Ran a set of three molds that completed the rubber seals
  • Inspected packed and made shipped labels when completed

Slide Out/metal Hanger

Riverside R/v Company
01.2019 - 12.2020
  • Managed multiple projects simultaneously, ensuring timely completion of all hanger-related tasks..
  • Prepared panels by sawing, drilling and cutting holes in panels for electric outlets, air conditioning units and plumbing..
  • Checked surfaces for imperfections, holes and cracks and corrected all issues prior to installing new coverings.
  • Sealed surfaces and maximized covering adhesion by applying sizing.
  • Used sketches, blueprints, and written orders to plan and carry out accurate jobs.
  • Checked alignment, pattern matches and seams of finished wallcoverings.
  • Prepared work area, tools and equipment for job site.
  • Used glue, nails and screws to fit and fasten wallboard or drywall into position on wood or metal frameworks.
  • Used Hand and Power tools to install horizontal and vertical metal or wooden studs on interior walls and exterior framing.
  • Efficiently managed time while working on multiple alteration projects simultaneously, consistently delivering high-quality results within deadline constraints.
  • Installed all outside lights, Hung front cap of R/V, Hung all metal skirting around unit, installed electrical outlets wired them and lights as well, layer top rubber roof as well

PDI Technician

Keystone R/v
10.2013 - 12.2015
  • Provided exceptional customer service, addressing concerns promptly
  • Reduced repeat repairs by accurately diagnosing issues the first time and implementing effective solutions.
  • Enhanced vehicle performance by conducting thorough diagnostic tests and identifying issues.
  • Completed entire diagnostics of R/V before being shipped to customers making sure everything worked from top to bottom.

HVAC Installer

York Heating And Air Conditioning
05.2010 - 08.2013
  • Assembled air ducts, pipes, discharge valves and flues to central heating and cooling equipment.
  • Removed old equipment from customers' homes and cleaned up areas to prepare for new installations.
  • Located and marked pipe positions, hole passages and duct connections in walls and floors.
  • Ran all duct thru house, set up furnace, ran copper, installed vents and return air supply, thermostat wire, installed entire ac setup in new and existing homes

Education

General -

East Noble High School
Kendallville, IN
09.2002

Skills

  • Machine operation
  • Quality control
  • Production monitoring
  • Press troubleshooting
  • Preventive Maintenance
  • Safety management
  • Equipment calibration
  • Efficient setup
  • Machine programming
  • Machinery cleaning
  • Precision alignment
  • Workpiece inspection
  • Die selection
  • Die placement
  • Work instructions
  • Attention to detail
  • Machine Start-up and Shut-down
  • Critical thinking
  • Hand tools and measuring devices
  • Problem-solving
  • Machine setup
  • Quality inspections
  • SAP
  • Teamwork
  • Problem-solving abilities
  • Multitasking Abilities
  • Reliability
  • Effective communication
  • Materials knowledge
  • Decision-making
  • Goal setting
  • Continuous improvement

Timeline

Press Operator

Elringklinger
12.2022 - Current

Supercell Operator

Nisco
01.2021 - 09.2022

Slide Out/metal Hanger

Riverside R/v Company
01.2019 - 12.2020

PDI Technician

Keystone R/v
10.2013 - 12.2015

HVAC Installer

York Heating And Air Conditioning
05.2010 - 08.2013

General -

East Noble High School
Robert Shugars