Summary
Overview
Work History
Education
Skills
Timeline
Generic

Robert W. Hatch IV

Livingston,Tx

Summary

Experienced foreman and general foreman with a track record dating back to 2018. Demonstrated commitment to upholding respect and integrity in all aspects of work. No recordable incidents or first aid cases under my supervision, showcasing unwavering dedication to maintaining a safe and productive work environment.

Overview

19
19
years of professional experience

Work History

Foreman

CCC Group
10.2023 - Current
  • Job is at a concrete facility. I line everyone out on tasks and hold numerous meetings to help keep the morale up.

Electrical Foreman

S&B
11.2022 - 10.2023
  • Lead guide and direct journeymen and apprentices on how to do safe quality work.

Leadman

Worley
09.2021 - 11.2022
  • I worked in the MCC and did field terminations on motors and instruments.

Lead Electrician and Foreman

QPS
08.2020 - 09.2021
  • I helped run a group of about 40 guys. Did plc, 480, 120 and 24v terminations.

Electrician

S&B
03.2020 - 08.2020
  • Worked with QA/QC walking down folders to sell to the client. Did punch list items, ran conduit and pulled wire. Terminated 24vdc to 480vac.

Electrical Foreman

MMR
09.2018 - 03.2020
  • Handled timekeeping on job site and led a crew in the right direction. Communicated with client we were working for to assign duties for the crew. Terminated 13.8kv.

Electrician

S&B
10.2017 - 09.2018
  • Was considered a mentor type worker. I would cover the crew when supervisor was not at work. I installed conduit, cable tray, mounted panels and terminated transformers and J boxes. Terminated 24vdc to 480vac.

Contech
09.2017 - 10.2017
  • Facility had lots of water damage. Replaced and repaired IJB's, transmitters, lighting panels and receptacles. It was basically a shutdown because of damage from Hurricane Harvey.

Electrical Foreman

MMR
03.2016 - 09.2017
  • Was an electrician for a couple job sites with MMR until October 2016. From then on I was an Electrical Foreman. I handled timekeeping on job site and pushed a small crew on some maintenance and minor capital projects. Communicated with client we were working for to assign further duties for the crew.

Zachry
12.2015 - 03.2016
  • Install conduit. Pull wire. Terminate 24vdc up to 480vac.

Vector Electric & Controls
11.2014 - 11.2015
  • Installed and demo conduit, cable tray, mounted panels, pulled wire and terminated 24vdc up to 480v.

Austin Industrial
04.2014 - 10.2014
  • Install conduit and cable tray. Pull wire. Terminate 480v and balancing loads for temp power.

Vector Electric & Controls
09.2013 - 04.2014
  • Installed conduit, cable tray, mounted panels, pulled wire and terminated 24vdc up to 480v.

MMR
08.2012 - 09.2013
  • Installed lots of conduit and supports. Guided helpers and molded them into good reliable help. Terminated 24vdc up to 480v. From transmitters and te's to hoa's and motors and controls in the field and the mcc.

Turner Industries
01.2012 - 08.2012
  • Installed conduit and supports, cable tray, mounted panels, terminated motors and controls and transformers for lighting.

MMR
07.2011 - 01.2012
  • Terminating crew on burnout. Terminated and determined all motors in the field and in the mcc. Rolled over to lighting project on new unit.

Turner Industries
02.2010 - 07.2011
  • Installed conduit and pulled wire. Drilled and knocked out holes in panels. Wore proper PPE. Trained helpers and helped them help me. Terminated 24vdc up to 480v.

Triad Electric & Controls
06.2009 - 02.2010
  • Started as a helper and worked my way up to B mechanic. Ran conduit and cable tray. Assisted A mechanics in MCC at end of job.

Turner Industries
02.2008 - 06.2009
  • Cut bend thread conduit for journeyman. Help where needed. Pull wire.

MMR
06.2006 - 02.2008
  • Run PVC to rigid conduit in duct banks in oil field. Helped pull wire and terminate.

Education

NCCER Plus Electrician -

Tx Tdlr industrial journeyman -

Twic card -

Skills

  • Crew leadership
  • Attention to detail
  • Decision-making
  • Effective communication
  • Dedicated work ethic
  • Teamwork and collaboration
  • Workplace safety
  • Worksite safety
  • OSHA compliance
  • Construction supervision
  • Quality control
  • OSHA regulations
  • Job planning
  • Work Planning and Prioritization
  • Safety policies and procedures
  • Employee training
  • Project leadership
  • Environmental awareness
  • Schematics and blueprints
  • Project deadlines
  • Crew scheduling
  • Scaffolding set up
  • Electrical installation
  • Hand and power tools
  • Time management
  • Job site safety
  • Crew supervision
  • Team mentoring
  • Construction procedures
  • Timesheet review
  • Fall protection

Timeline

Foreman

CCC Group
10.2023 - Current

Electrical Foreman

S&B
11.2022 - 10.2023

Leadman

Worley
09.2021 - 11.2022

Lead Electrician and Foreman

QPS
08.2020 - 09.2021

Electrician

S&B
03.2020 - 08.2020

Electrical Foreman

MMR
09.2018 - 03.2020

Electrician

S&B
10.2017 - 09.2018

Contech
09.2017 - 10.2017

Electrical Foreman

MMR
03.2016 - 09.2017

Zachry
12.2015 - 03.2016

Vector Electric & Controls
11.2014 - 11.2015

Austin Industrial
04.2014 - 10.2014

Vector Electric & Controls
09.2013 - 04.2014

MMR
08.2012 - 09.2013

Turner Industries
01.2012 - 08.2012

MMR
07.2011 - 01.2012

Turner Industries
02.2010 - 07.2011

Triad Electric & Controls
06.2009 - 02.2010

Turner Industries
02.2008 - 06.2009

MMR
06.2006 - 02.2008

NCCER Plus Electrician -

Tx Tdlr industrial journeyman -

Twic card -

Robert W. Hatch IV