Overview
Work History
Education
Skills
Timeline
Generic

Robert Wilson

Marysville

Overview

6
6
years of professional experience

Work History

Journeyman Scaffold Builder

Sdb
Prineville
05.2025 - 10.2025
  • Constructed scaffolds in appropriate positions and secured completed structures in place.
  • Loaded materials and tools into vehicles and unloaded upon arrival at jobsites.
  • Displayed high standards for quality workmanship and routinely double-checked work.
  • Analyzed base surfaces to identify potential obstructions or safety hazards.
  • Inspected, maintained and repaired scaffolding components to ensure safety standards were met.
  • Assisted in rigging operations when needed including hoisting material into place utilizing pulleys, ropes and blocks.
  • Followed job-site safety protocols for working at height as well as other hazardous conditions.
  • Broke down structures following project completion.
  • Controlled traffic passing near, in or around work zones.
  • Signaled equipment operators to facilitate alignment, movement or adjustment of machinery.
  • Provided technical advice to management on best practices for erecting, dismantling and modifying of scaffolding systems.
  • Cut down boards and plywood panels to meet appropriate size requirements.
  • Assembled and erected scaffolding systems with appropriate tools and safety equipment.
  • Gained independent working skills and guided and mentored less experienced team members.
  • Operated equipment with strong focus on safety and ground communication.
  • Installed guardrails, ladders, platforms and walkways in accordance with applicable safety regulations.
  • Inspected sites before and after construction projects.
  • Assembled scaffolding at job sites and removed when work was complete.
  • Cleaned or prepared construction sites to eliminate hazards.
  • Unloaded equipment and materials and moved supplies around on job sites in various weather conditions.
  • Cleaned and organized work areas to prevent accidents and dangerous situations.
  • Demonstrated knowledge of advanced techniques used for erecting large scale structures such as cantilevers or suspended platforms.
  • Utilized fall protection equipment when necessary while working at heights greater than 6 feet above ground level.
  • Performed demanding physical work over extended periods and modeled positive attitude.
  • Worked productively as lead or helping team member to drive customer satisfaction.
  • Monitored weather conditions that could affect the stability of the structure during installation or use.
  • Safely constructed hung, tube and clip and modular scaffolding systems.
  • Loaded and unloaded materials onto scaffolds in a safe manner.
  • Safely and accurately built scaffolding in confined spaces like cooling towers.
  • Ensured all personnel on site had the proper training to work at height safely.
  • Maintained an organized work area by disposing of waste properly and cleaning up after each shift.
  • Demonstrated best safety practices working at heights and lifting various objects.
  • Communicated effectively with coworkers, supervisors and clients regarding project status updates and changes in scope of work.

Journeyman Scaffold Builder

BrandSafway
Ferndale
08.2021 - 04.2024
  • Constructed scaffolds in appropriate positions and secured completed structures in place.
  • Loaded materials and tools into vehicles and unloaded upon arrival at jobsites.
  • Displayed high standards for quality workmanship and routinely double-checked work.
  • Analyzed base surfaces to identify potential obstructions or safety hazards.
  • Inspected, maintained and repaired scaffolding components to ensure safety standards were met.
  • Assisted in rigging operations when needed including hoisting material into place utilizing pulleys, ropes and blocks.
  • Followed job-site safety protocols for working at height as well as other hazardous conditions.
  • Broke down structures following project completion.
  • Controlled traffic passing near, in or around work zones.
  • Signaled equipment operators to facilitate alignment, movement or adjustment of machinery.
  • Provided technical advice to management on best practices for erecting, dismantling and modifying of scaffolding systems.
  • Cut down boards and plywood panels to meet appropriate size requirements.
  • Assembled and erected scaffolding systems with appropriate tools and safety equipment.
  • Checked material inventories and ordered new items as needed to prevent shortages.
  • Gained independent working skills and guided and mentored less experienced team members.
  • Repaired and replaced faulty or damaged scaffold materials.
  • Installed guardrails, ladders, platforms and walkways in accordance with applicable safety regulations.
  • Inspected sites before and after construction projects.
  • Learned and mastered skilled trade specialties under guidance of expert mentors.
  • Assembled scaffolding at job sites and removed when work was complete.
  • Cleaned or prepared construction sites to eliminate hazards.
  • Unloaded equipment and materials and moved supplies around on job sites in various weather conditions.
  • Cleaned and organized work areas to prevent accidents and dangerous situations.
  • Used scaffolding safely, prepared under-base walls and loaded and unloaded materials.
  • Demonstrated knowledge of advanced techniques used for erecting large scale structures such as cantilevers or suspended platforms.
  • Utilized fall protection equipment when necessary while working at heights greater than 6 feet above ground level.

Journeyman Scaffold Builder

Hydro Rents
Kent
07.2019 - 04.2021
  • Constructed scaffolds in appropriate positions and secured completed structures in place.
  • Operated machinery in busy environments and maintained safety around equipment, people and other projects.
  • Loaded materials and tools into vehicles and unloaded upon arrival at jobsites.
  • Displayed high standards for quality workmanship and routinely double-checked work.
  • Analyzed base surfaces to identify potential obstructions or safety hazards.
  • Inspected, maintained and repaired scaffolding components to ensure safety standards were met.
  • Assisted in rigging operations when needed including hoisting material into place utilizing pulleys, ropes and blocks.

Education

High School Diploma -

Everett Community College
Everett, WA
06-1998

Skills

  • Scaffold construction
  • Equipment maintenance
  • Safety compliance
  • Rigging operations
  • Quality control
  • Traffic management

Timeline

Journeyman Scaffold Builder

Sdb
05.2025 - 10.2025

Journeyman Scaffold Builder

BrandSafway
08.2021 - 04.2024

Journeyman Scaffold Builder

Hydro Rents
07.2019 - 04.2021

High School Diploma -

Everett Community College
Robert Wilson