Overview
Work History
Education
Skills
Languages
Timeline
Generic

Roberto Alvarado

SAN FRANCISCO,CA

Overview

8
8
years of professional experience

Work History

VNH & CASTILLO PLUMBING

BRUNO VIEIRA
Burlingame, CA
06.2021 - Current
  • Installed and repaired plumbing fixtures, such as sinks, toilets, showers, water heaters, and garbage disposals.
  • Repaired or replaced faulty valves and pipes to ensure proper water flow.
  • Researched product information for the selection of appropriate materials for plumbing projects.
  • Maintained records of work completed in accordance with local codes and regulations.
  • Inspected systems to identify potential problems or hazards prior to installation or repair.
  • Performed preventive maintenance on plumbing systems to ensure efficient operation.
  • Troubleshot complex plumbing issues using advanced techniques and tools.
  • Sealed all joints with lead wool or solder to prevent leakage of gas or water.
  • Cut openings in walls and floors to accommodate pipe and pipe fittings.
  • Coordinated with customers regarding project timelines and scheduling of services.
  • Ensured compliance with safety regulations during installation activities.
  • Followed blueprints while installing drainage systems in residential homes.
  • Assembled components such as piping, tubing, valves, tanks, boilers, heating units, pressure regulators.
  • Replaced defective parts according to manufacturer's instructions.
  • Checked system operations by running tests on pipes and lines.
  • Performed regular maintenance checks on existing plumbing systems.
  • Cleaned out clogged drains using augers, plungers and other specialized tools.
  • Responded promptly to customer inquiries about service requests and repairs.
  • Provided technical advice on plumbing related matters when required.
  • Diagnosed malfunctions in equipment utilizing knowledge of electrical principles.
  • Cut diverse pipe sizes and lengths to prepare for installation.
  • Inspected installations to repair leaks and make adjustments to pipes.
  • Filled piping systems with water and air to test for leaks.
  • Identified and located required tools prior to starting each project.
  • Filled pipes with water or air, observing pressure gauges and pipes to troubleshoot and locate leaks.
  • Installed supports from ceiling joists to secure pipes in place.
  • Inspected worksites to determine presence of obstructions, unsafe conditions and crew errors.

General Construction Worker

Jesus osorio castillo
San Pablo, CA
02.2016 - 04.2021
  • Loaded and unloaded building materials from delivery trucks to job sites.
  • Operated power tools such as drills, saws, grinders, sanders, hammers and any other necessary equipment for construction projects.
  • Installed drywall panels, insulation boards and other wall components according to blueprints or verbal instructions.
  • Assisted with roofing work by laying down tarps and shingles.
  • Mixed mortar or concrete onsite using wheelbarrows or mechanical mixers.
  • Erected scaffolding around buildings for workers to access higher levels during construction projects.
  • Measured material lengths accurately with tape measures before cutting them into specified sizes.
  • Assembled metal frames for structures such as walls and roofs prior to installation on-site.
  • Laid bricks and stones in walkways, patios and retaining walls according to designs provided by supervisors.
  • Performed demolition work on existing structures when needed using jackhammers or sledgehammers.
  • Repaired damaged parts of buildings by replacing broken tiles or boards as instructed by supervisors.
  • Cleaned up debris at the end of each shift in order to keep worksites safe and organized.
  • Collaborated with other workers in order to ensure successful completion of tasks within deadlines.
  • Checked all materials used for any defects before starting a project.
  • Ensured that safety regulations were strictly followed while performing duties.
  • Used ladders safely when working at heights.
  • Inspected finished products for quality assurance purposes.
  • Adhered to all company policies regarding safety procedures.
  • Assisted electrical, plumbing and carpentry teams by completing basic and semi-skilled work.
  • Maintained clean, safe working environment by removing debris from job site prior to shift completion.
  • Met company and OSHA safety guidelines for work site operations to minimize worker risk.
  • Collected and removed debris from work sites to maintain team productivity and minimize safety hazards.
  • Used laser measuring tools to calculate lengths, widths and heights.
  • Utilized two-way radios and hand signals to coordinate communication between equipment operators.
  • Logged inventory to track supply counts, organize equipment and gather important materials.
  • Performed lock-out-tag-out procedures on equipment prior to service work to promote workplace safety.
  • Sustained safety protocols to maintain secure, proper handling of equipment and materials.
  • Completed carpentry work and installed crown molding and wood flooring to meet customer preferences.
  • Completed general carpentry, electrical, mechanical, HVAC and plumbing installations and repairs.
  • Notified supervisors of faulty operations and defective materials to improve production.
  • Assembled structural components, replacing parts to meet regulatory code standards.
  • Maintained baseline safety knowledge to improve deficient areas and meet code.
  • Addressed and resolved on-site problems to keep teams on-task and avoid development of larger concerns.
  • Acted as subject matter expert to provide industry insight and assist coworkers.
  • Utilized electrical, plumbing and HVAC expertise to complete projects and adhere to timelines.
  • Performed demanding physical work over extended periods and modeled positive attitude.
  • Cleaned or prepared construction sites to eliminate hazards.
  • Understood how to operate and maintain job site equipment safely and for maximum productivity.
  • Read plans, instructions or specifications to determine work activities.
  • Displayed high standards for quality workmanship and routinely double-checked work.
  • Learned and mastered skilled trade specialties under guidance of expert mentors.
  • Loaded materials and tools into vehicles and unloaded upon arrival at jobsites.
  • Gained independent working skills and guided and mentored less experienced team members.
  • Worked productively as lead or helping team member to drive customer satisfaction.
  • Assisted with diverse construction challenges to help team and customer.
  • Loaded or unloaded building materials to distribute machinery or tools.
  • Tended pumps, compressors or generators to provide power or heat or move materials.

Education

GED -

Venustiano Carranza
Mexico, ME
06-1996

Skills

  • Fixture Repair Proficiency
  • Tool Usage Proficiency
  • Strong Communication Skills
  • Valve Repair Techniques
  • Basic math proficiency
  • Plumbing Fixture Installation
  • Water heater maintenance
  • Basic math aptitude
  • Codes Compliance
  • Quality production
  • Blueprints
  • Emergency Response
  • Troubleshooting
  • Staff Management
  • Plumbing
  • Hand and power tools
  • Plumbing Repairs
  • Construction management
  • Blueprint Reading
  • HVAC knowledge
  • Equipment Operation
  • Problem-Solving
  • Detail Oriented
  • Conflict Resolution
  • Decision-Making
  • Relationship Building
  • Safety Protocols
  • Emergency Services
  • Goal Setting
  • Service Reporting
  • Task Prioritization
  • Faucet Repair
  • Effective Communication
  • Inventory Management
  • Teamwork and Collaboration
  • Job Site Evaluation
  • Exceptional problem solver
  • Problem-solving abilities
  • Job order prioritization
  • Drain Cleaning
  • Material prepping
  • Safety inspection
  • OSHA Compliance
  • Adaptability and Flexibility
  • Adaptability
  • Self Motivation
  • Multitasking
  • Attention to Detail
  • Equipment Maintenance
  • Basic Carpentry
  • Professional Demeanor
  • Excellent Communication
  • Professionalism
  • Good mechanical aptitude
  • Power Tool Operation
  • Preventive Maintenance

Languages

English
Elementary
Spanish
Elementary

Timeline

VNH & CASTILLO PLUMBING

BRUNO VIEIRA
06.2021 - Current

General Construction Worker

Jesus osorio castillo
02.2016 - 04.2021

GED -

Venustiano Carranza
Roberto Alvarado