Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Roberto Lino Munoz

Weymouth,MA

Summary

Industrial Engineer professional results-oriented analyst in managing large volume of information to help reduce waste and increase efficiency.

Overview

10
10
years of professional experience

Work History

Analyst, Engineering

Whirpool Corporation
06.2023 - Current
  • Lead project of a new automatic conveyor system for a high loss assembly area following Whirlpool's Ideal Production Systems ideology.
  • Worked with Plant Leads in adjusting headcounts to meet current demand.
  • Performed analysis to help Finance in developing plant's Cost Deployment for year 2024, identifying areas with the biggest losses and waste though analytical analysis.
  • Lead group of Engineers in performing Industrial Engineering activities such as Time Studies, Standard Works/Standard Operating Procedures and 3 M's Analysis in all different areas of the plant.
  • Worked with Quality Leaders to help improve and develop new processes to reduce quality issues and ensure First Time Quality.
  • Developed a plan with Logistics to deliver parts in assembly areas and reduce wait times and downtimes due to parts not being delivered on time.
  • Trained operators throughout the plant in important Workplace Organization topics such as 5S, 3 Ms, Basic Tools and Kaizens.

Continuous Improvement Engineer

Whirlpool Corporation
02.2023 - 06.2023
  • Analyzed, designed and executed layout changes for an assembly line with high manufacturing cost losses using WCM methodology.
  • Designed and Implemented racks, workstations and material carts for an assembly area using ergonomic studies ensuring unnecessary lean manufacturing wastes are not present.
  • Analyzed current manufacturing process, creating SOPs and OPLs ensuring safety & quality requirements are met in every step.
  • Workplace Organization Pillar Lead Person for an assembly line acting as liaison between operations and upper management.
  • Actively listened to operators concerns, analyzing current problems in assembly lines and presenting improvement ideas with Benefit/Cost analysis and KAIZENs ensuring safety and reduced costs are always met.

Project Manager Engineer (Manufacturing)

SMCK Sonora Metal (Mexico Branch)
05.2019 - 12.2021
  • Performed product/process analysis for cost reduction, quality improvement and efficiency improvement.
  • Purchase of new material, interacting with current and potential suppliers to ensure the best cost/quality on our products.
  • Performed quotation on products estimating job times and material costs to present company's quote on new products to potential new US clients.
  • Participated in Monthly, Weekly and Daily meetings to report to Upper Management about current process costs, current quality procedures, detailing opportunity areas evaluated with KAIZENs and performing improvements in high-cost loss areas.
  • Daily interaction with clients acting as liability for new product POs follow-ups.
  • Ability to read blueprints and drawings to ensure client expectations are met.
  • Part of the ISO:9001 certification as a member of the Project Management department.

Quality Engineer

SMCK Sonora Metal (Mexico Branch)
10.2018 - 05.2019
  • First Article Inspection/Release before production starts running, to ensure products ran on compliance with client specifications.
  • Conducted inspections throughout the day for different manufacturing process and ensure there is no deviation in process.
  • Created and updated Standard Operating Procedures for different manufacturing processes.
  • Contributed to root cause analysis to determine core reason for failures and errors.
  • Create AI Programs on KEYENCE MEASUREMENT SYSTEM to develop a leaner quality process to release production pieces.
  • Incoming Quality Inspection for raw material and products.

Trainee & Process Coach - Stamping (Tool & Die)

Ford Motor Co
04.2018 - 09.2018
  • Ensure daily start-up readiness for production.
  • Analyzed, determined and corrected downtime issues using Root Cause Analysis Methods.
  • Coordinate Tool & Die Shop for die repairs.
  • Attended training courses to build understanding of processes and industry.

Team Leader - Client & Finance Services

Gatestone & Co. International
10.2013 - 05.2015
  • Responsible for day-to-day interaction with assigned client acting as a liaison for operations and providing back up and support services.
  • Prepare Monthly, Weekly and Daily reports, statistics and data in reference to performance and service operations using internal databases (Microsoft Access), Microsoft Excel, AS400, RMS and IBM 3270.
  • Helped establish the Mexico Market for one of the major world-wide financial institutions by interpreting Client directives and escalate to data management team to facilitate on-boarding process to ensure procedures and requirements are followed and fulfilled upon Client agreement and regulatory compliance.

Education

Bachelor of Science - Industrial Systems Engineering

Universidad Del Valle De Mexico
Hermosillo, MX
08.2017

Skills

  • Information Gathering
  • Root Cause Analysis
  • Compliance Analysis
  • Production Planning
  • Quality Control
  • Project Management
  • Workflow Analysis
  • AutoCAD

Languages

English
Native or Bilingual
Spanish
Native or Bilingual

Timeline

Analyst, Engineering

Whirpool Corporation
06.2023 - Current

Continuous Improvement Engineer

Whirlpool Corporation
02.2023 - 06.2023

Project Manager Engineer (Manufacturing)

SMCK Sonora Metal (Mexico Branch)
05.2019 - 12.2021

Quality Engineer

SMCK Sonora Metal (Mexico Branch)
10.2018 - 05.2019

Trainee & Process Coach - Stamping (Tool & Die)

Ford Motor Co
04.2018 - 09.2018

Team Leader - Client & Finance Services

Gatestone & Co. International
10.2013 - 05.2015

Bachelor of Science - Industrial Systems Engineering

Universidad Del Valle De Mexico
Roberto Lino Munoz