Highly-motivated employee with desire to take on new challenges. Strong work ethic, adaptability, and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills.
Overview
1
1
Certification
Work History
Forman
V&R Sheet Metal and Roofing
Tacoma, WA
07.20-18 - Current
Provided technical guidance to the crew on safe installation practices.
Resolved conflicts between crew members in a timely manner.
Scheduled crews, subcontractors, and material deliveries as needed.
Ensured all workers followed company safety protocols during jobs.
Participated in weekly meetings with management staff to discuss upcoming projects.
Performed regular maintenance checks on tools and equipment utilized by the crew.
Collaborated with other departments within the organization when necessary.
Maintained accurate inventory records of supplies used on jobsites.
Assigned tasks to individual team members based on their skill sets.
Reviewed blueprints and specifications prior to beginning any job.
Inspected roofs for safety and damage issues and recommended solutions.
Organized materials, tools, and equipment needed for each job.
Created daily reports outlining job progress and any changes that were made.
Supervised a team of roofers to ensure quality work was completed on time.
Communicated with clients regarding their concerns or questions about the project.
Investigated customer complaints related to roofing services provided by the company.
Monitored weather conditions to ensure safe working environment for crew members.
Promoted effective communication with workers, providing direction on roof repairs and installations.
Assigned each employee his or her daily tasks, making sure roofing projects met deadlines and quality assurance guidelines.
Complied with federal and company regulations to maintain high level of job site safety.
Managed job materials, supplies and tools and ordered new stock when inventory levels were low.
Led extensive safety training to reduce workplace accidents.
Planned, organized and oversaw daily activities of multiple production crews.
Met with customers and patiently answered questions about roofing concerns and requests.
Kept production team moving forward for progress in daily site operations.
Created work crew schedules and delegated assignments.
Implemented onsite safety protocols and procedures and properly trained team members on prevention measures.
Monitored project progress to enforce adherence to deadlines and quality standards.
Monitored equipment operation during extraction process to detect problems.
Defined and monitored personnel and project schedules to ensure on-time project completion.
Delegated work to staff, setting priorities and goals.
Provided leadership, insight and mentoring to newly hired employees to supply knowledge of various company programs.
Journeyman Roofer
V&R Roofing
Tacoma, WA
07.20-18 - Current
Repaired damaged wood surfaces with epoxy fillers before applying new shingles.
Organized supplies required for each job accurately so that no time is wasted while working onsite.
Performed minor repairs on existing roofs such as patching leaks, replacing worn out shingles.
Inspected roofs for damage and deterioration, removed existing roofing materials, and prepared the surface for new shingles.
Collaborated with colleagues to complete projects efficiently within deadlines set by clients.
Stayed informed about industry trends related to roof design and construction.
Provided technical advice regarding installation techniques for different types of roof systems to customers when necessary.
Cleaned up job sites after completion of work and disposed of waste material properly.
Applied asphalt-based adhesives or nails to secure shingles in place.
Assisted in loading and unloading materials from delivery trucks onto roofs.
Communicated effectively with supervisors about progress made on assigned projects.
Identified areas requiring additional reinforcement due to weather conditions or load bearing requirements.
Checked finished installations for compliance with building codes and customer specifications.
Inspected completed jobs regularly to ensure that they are free from defects.
Ensured that all safety regulations were followed on the job site at all times.
Utilized ladders, scaffolds, hoists, power tools, hand tools safely during installation process.
Installed underlayments, flashing, drip edge and other components of a roof system to ensure proper drainage of water.
Recommended appropriate insulation material depending on climate conditions in the area.
Maintained tools and equipment in good condition according to safety standards.
Overlapped successive layers of roofing material, determining distance of overlap using chalk line, gauge on shingling hatchet and lines on shingles.
Repaired and maintained surface materials to make building exteriors weatherproof and waterproof.
Maintained and repaired roofing tools and equipment.
Trained and oversaw individuals in roofing system installations.
Cemented and nailed flashing strips of over joints to achieve watertight seals.
Cut roofing paper to size and nailed and stapled paper to roof in overlapping strips to form base for roofing materials.
Participated in all phases and types of commercial roofing.
Repaired and replaced roof membrane, sub roofing, sheathing and base materials.
Selected necessary materials and calculated dimensions to develop plan appropriate to specifications.
Worked safely and effectively under difficult conditions and completed projects under various kinds of weather.
Followed manufacturer specifications to remove old roofing materials and install new roofs.
Communicated clearly and reliably with foreman and crew leaders, highlighting safety concerns and detailing project progress.
Diagnosed and identified sources of leaks, developing plans for repairs from total tear-offs to patchwork.
Covered roofs and exterior walls of structures with slate, asphalt, and aluminum with brushes and knives.
Applied plastic coatings and membranes, fiberglass or felt over sloped roofs to prepare for shingle installation.
Worked regularly at advanced heights and followed all OSHA safety protocols and procedures for fall prevention.
Cleaned or prepared construction sites to eliminate hazards.
Operated equipment with strong focus on safety and ground communication.
Eliminated project lags by organizing work-in-progress and delegating tasks.
Loaded materials and tools into vehicles and unloaded upon arrival at jobsites.
Performed demanding physical work over extended periods and modeled positive attitude.
Set up ladders or scaffolding to safely access roof.
Reviewed project blueprints and specifications to determine number of workers needed to complete jobs.
Created work crew schedules and delegated assignments.
Added vapor barriers or insulating materials on flat roofs.
Kept production team moving forward for progress in daily site operations.
Demonstrated best safety practices working at heights and lifting various objects.
Gained independent working skills and guided and mentored less experienced team members.
Resolved labor, design and tool issues during construction projects.
Allocated material and labor resources to promote on-time and under-budget project completion.
Mopped and poured hot asphalt and tar onto roof base while applying asphalt and tar and gravel to roof.
Displayed high standards for quality workmanship and routinely double-checked work.
Understood how to operate and maintain job site equipment safely and for maximum productivity.
Education
Roofing
Roofing Apprenticeship
Tacoma
06-2020
Engineering (Pre-Engineering)
Purdue University - North Central
Westville, IN
05-1990
Skills
Scaffolding Set Up
Resource Allocation
Employee Training
Job Planning
Schematics and Blueprints
Construction management
Fall protection
Cost Estimation
Project Planning
Project Leadership
Work Planning and Prioritization
Site Inspection
Daily Reporting
Customer Relations
OSHA Compliance
Dedicated Work Ethic
Blueprint Reading
Hand and Power Tool Operation
Affiliations
Involvement in Community and volunteering
Reading and learning of insurmountable ideas
Quite time with my dog
Accomplishments
Nominated for Beacon's Female roofer of the year
Largest amount of savings on jobs
Certification
OSHA 30
Scaffold and Ladder Safety
Hazard Communication
Lead and Silica in Construction Awareness Training
Outdoor Heat Exposure Awareness
Fall Protection in Construction and Competent Person Training
Qualified Signal Person
CERTA
CPR
Timeline
Forman
V&R Sheet Metal and Roofing
07.20-18 - Current
Journeyman Roofer
V&R Roofing
07.20-18 - Current
Roofing
Roofing Apprenticeship
Engineering (Pre-Engineering)
Purdue University - North Central
Similar Profiles
Micah HuttMicah Hutt
Journeyman Sheet Metal Worker at Local 66 Sheet Metal WorkersJourneyman Sheet Metal Worker at Local 66 Sheet Metal Workers