Summary
Overview
Work History
Education
Skills
Affiliations
Accomplishments
Certification
Timeline
Generic

Robin Wright

7229 South Asotin St. Tacoma,WA

Summary

Highly-motivated employee with desire to take on new challenges. Strong work ethic, adaptability, and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills.

Overview

1
1
Certification

Work History

Forman

V&R Sheet Metal and Roofing
Tacoma, WA
07.20-18 - Current
  • Provided technical guidance to the crew on safe installation practices.
  • Resolved conflicts between crew members in a timely manner.
  • Scheduled crews, subcontractors, and material deliveries as needed.
  • Ensured all workers followed company safety protocols during jobs.
  • Participated in weekly meetings with management staff to discuss upcoming projects.
  • Performed regular maintenance checks on tools and equipment utilized by the crew.
  • Collaborated with other departments within the organization when necessary.
  • Maintained accurate inventory records of supplies used on jobsites.
  • Assigned tasks to individual team members based on their skill sets.
  • Reviewed blueprints and specifications prior to beginning any job.
  • Inspected roofs for safety and damage issues and recommended solutions.
  • Organized materials, tools, and equipment needed for each job.
  • Created daily reports outlining job progress and any changes that were made.
  • Supervised a team of roofers to ensure quality work was completed on time.
  • Communicated with clients regarding their concerns or questions about the project.
  • Investigated customer complaints related to roofing services provided by the company.
  • Monitored weather conditions to ensure safe working environment for crew members.
  • Promoted effective communication with workers, providing direction on roof repairs and installations.
  • Assigned each employee his or her daily tasks, making sure roofing projects met deadlines and quality assurance guidelines.
  • Complied with federal and company regulations to maintain high level of job site safety.
  • Managed job materials, supplies and tools and ordered new stock when inventory levels were low.
  • Led extensive safety training to reduce workplace accidents.
  • Planned, organized and oversaw daily activities of multiple production crews.
  • Met with customers and patiently answered questions about roofing concerns and requests.
  • Kept production team moving forward for progress in daily site operations.
  • Created work crew schedules and delegated assignments.
  • Implemented onsite safety protocols and procedures and properly trained team members on prevention measures.
  • Monitored project progress to enforce adherence to deadlines and quality standards.
  • Monitored equipment operation during extraction process to detect problems.
  • Defined and monitored personnel and project schedules to ensure on-time project completion.
  • Delegated work to staff, setting priorities and goals.
  • Provided leadership, insight and mentoring to newly hired employees to supply knowledge of various company programs.

Journeyman Roofer

V&R Roofing
Tacoma, WA
07.20-18 - Current
  • Repaired damaged wood surfaces with epoxy fillers before applying new shingles.
  • Organized supplies required for each job accurately so that no time is wasted while working onsite.
  • Performed minor repairs on existing roofs such as patching leaks, replacing worn out shingles.
  • Inspected roofs for damage and deterioration, removed existing roofing materials, and prepared the surface for new shingles.
  • Collaborated with colleagues to complete projects efficiently within deadlines set by clients.
  • Stayed informed about industry trends related to roof design and construction.
  • Provided technical advice regarding installation techniques for different types of roof systems to customers when necessary.
  • Cleaned up job sites after completion of work and disposed of waste material properly.
  • Applied asphalt-based adhesives or nails to secure shingles in place.
  • Assisted in loading and unloading materials from delivery trucks onto roofs.
  • Communicated effectively with supervisors about progress made on assigned projects.
  • Identified areas requiring additional reinforcement due to weather conditions or load bearing requirements.
  • Checked finished installations for compliance with building codes and customer specifications.
  • Inspected completed jobs regularly to ensure that they are free from defects.
  • Ensured that all safety regulations were followed on the job site at all times.
  • Utilized ladders, scaffolds, hoists, power tools, hand tools safely during installation process.
  • Installed underlayments, flashing, drip edge and other components of a roof system to ensure proper drainage of water.
  • Recommended appropriate insulation material depending on climate conditions in the area.
  • Maintained tools and equipment in good condition according to safety standards.
  • Overlapped successive layers of roofing material, determining distance of overlap using chalk line, gauge on shingling hatchet and lines on shingles.
  • Repaired and maintained surface materials to make building exteriors weatherproof and waterproof.
  • Maintained and repaired roofing tools and equipment.
  • Trained and oversaw individuals in roofing system installations.
  • Cemented and nailed flashing strips of over joints to achieve watertight seals.
  • Cut roofing paper to size and nailed and stapled paper to roof in overlapping strips to form base for roofing materials.
  • Participated in all phases and types of commercial roofing.
  • Repaired and replaced roof membrane, sub roofing, sheathing and base materials.
  • Selected necessary materials and calculated dimensions to develop plan appropriate to specifications.
  • Worked safely and effectively under difficult conditions and completed projects under various kinds of weather.
  • Followed manufacturer specifications to remove old roofing materials and install new roofs.
  • Communicated clearly and reliably with foreman and crew leaders, highlighting safety concerns and detailing project progress.
  • Diagnosed and identified sources of leaks, developing plans for repairs from total tear-offs to patchwork.
  • Covered roofs and exterior walls of structures with slate, asphalt, and aluminum with brushes and knives.
  • Applied plastic coatings and membranes, fiberglass or felt over sloped roofs to prepare for shingle installation.
  • Worked regularly at advanced heights and followed all OSHA safety protocols and procedures for fall prevention.
  • Cleaned or prepared construction sites to eliminate hazards.
  • Operated equipment with strong focus on safety and ground communication.
  • Eliminated project lags by organizing work-in-progress and delegating tasks.
  • Loaded materials and tools into vehicles and unloaded upon arrival at jobsites.
  • Performed demanding physical work over extended periods and modeled positive attitude.
  • Set up ladders or scaffolding to safely access roof.
  • Reviewed project blueprints and specifications to determine number of workers needed to complete jobs.
  • Created work crew schedules and delegated assignments.
  • Added vapor barriers or insulating materials on flat roofs.
  • Kept production team moving forward for progress in daily site operations.
  • Demonstrated best safety practices working at heights and lifting various objects.
  • Gained independent working skills and guided and mentored less experienced team members.
  • Resolved labor, design and tool issues during construction projects.
  • Allocated material and labor resources to promote on-time and under-budget project completion.
  • Mopped and poured hot asphalt and tar onto roof base while applying asphalt and tar and gravel to roof.
  • Displayed high standards for quality workmanship and routinely double-checked work.
  • Understood how to operate and maintain job site equipment safely and for maximum productivity.

Education

Roofing

Roofing Apprenticeship
Tacoma
06-2020

Engineering (Pre-Engineering)

Purdue University - North Central
Westville, IN
05-1990

Skills

  • Scaffolding Set Up
  • Resource Allocation
  • Employee Training
  • Job Planning
  • Schematics and Blueprints
  • Construction management
  • Fall protection
  • Cost Estimation
  • Project Planning
  • Project Leadership
  • Work Planning and Prioritization
  • Site Inspection
  • Daily Reporting
  • Customer Relations
  • OSHA Compliance
  • Dedicated Work Ethic
  • Blueprint Reading
  • Hand and Power Tool Operation

Affiliations

  • Involvement in Community and volunteering
  • Reading and learning of insurmountable ideas
  • Quite time with my dog

Accomplishments

  • Nominated for Beacon's Female roofer of the year
  • Largest amount of savings on jobs

Certification

  • OSHA 30
  • Scaffold and Ladder Safety
  • Hazard Communication
  • Lead and Silica in Construction Awareness Training
  • Outdoor Heat Exposure Awareness
  • Fall Protection in Construction and Competent Person Training
  • Qualified Signal Person
  • CERTA
  • CPR

Timeline

Forman

V&R Sheet Metal and Roofing
07.20-18 - Current

Journeyman Roofer

V&R Roofing
07.20-18 - Current

Roofing

Roofing Apprenticeship

Engineering (Pre-Engineering)

Purdue University - North Central
Robin Wright