Dynamic Foreman with extensive experience at Blattner Energy, excelling in crew leadership and quality control. Proven track record in supervising complex installations and ensuring safety compliance. Skilled in equipment operation and effective communication, driving successful project outcomes while maintaining high standards of performance and environmental awareness.
Supervised the Huck/Torque and Align crew using the Nextracker XTR system
Directed the installation process for module rails.
My main task on this site was supervising torque tubes using the ATI system. Upon completion of torque tubes, I supervised module installation, racking/module remediation and walk downs. Once mechanical completion was reached, I became the QEW of remediation that had to be done from performance testing
Foreperson over racking/module remediation and mechanical walk downs. I also ran another small crew that did all fill ins (areas that had to be skipped for one reason or another). Upon mechanical completion, I supervised the trash crew and the pallet chipping crew. I also became a QEW (qualified electrical worker) on this site
Foreperson over Huck/Torque and Align using the Nextracker XTR system. Upon completion of Huck and align, I done racking/module/electrical remediation
My main task on this site was operating the pd10 to drive pile. I have done production pile, cab pile, and LBD pile
My main task on this site was Huck/Torque and Align using the Nextracker XTR system. Upon completion of my main task, I installed modules
My main task on this site was stage and prep/install motors using the ATI system. Also on this site, I’ve done offload.
My main task on this site was stage and prep/install motors using the ATI system. On this site I’ve also done torque tubes (assemble and setting)
My main task here was stage and prep/install motors using the ATI system. Once my task was complete, I done panel remediation
OSHA 30
NFPAE-70
CPR training
DOT physical