Overview
Work History
Timeline
Generic
Rodolfo Espino

Rodolfo Espino

New Town,ND

Overview

4
4
years of professional experience

Work History

Construction Worker

Dakota Chemical
04.2024 - Current
  • Assist welders in carrying and handling piping to desired location
  • Remove and replace oil processing buildings(lact. units, compressor stations) while also connecting and fabricating necessary piping and equipment.

  • Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
  • Maintained clean and organized job sites, contributing to a safe working environment for all employees.
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Gathered and disposed of worksite debris to remove safety hazards.
  • Worked with more knowledgeable professionals to grow understanding of principles and construction standards.
  • Brought materials and tools from trucks and storage facilities to work site locations and organized for expected needs.
  • Operated forklifts and boom lifts to complete various tasks.
  • Dug trenches, backfilled holes and compacted earth to prepare for new construction.
  • Inspected tools and equipment to maintain safety and efficiency.
  • Assisted in digging, trenching and backfilling trenches and foundations.
  • Moved and cleared debris from work sites to dispose of in designated areas.
  • Followed instructions and safety protocols while operating machinery and equipment.
  • Managed safe and efficient use of tools and equipment on construction sites.
  • Followed instructions and safety protocols to prevent accidents and injuries.
  • Loaded and unloaded materials and equipment onto and off construction sites.
  • Loaded and unloaded materials onto trucks and trailers.
  • Cleaned and maintained tools, equipment and worksites.
  • Used variety of hand and power tools to complete tasks.
  • Demonstrated a strong commitment to environmental sustainability through proper waste disposal measures, recycling initiatives, and eco-friendly construction practices when possible.
  • Installed new structures, updated systems and replaced worn components to bring buildings up to current codes.
  • Operated heavy machinery efficiently, ensuring timely progress on construction projects while minimizing risk of accidents or damage.
  • Adapted quickly to changing project requirements, demonstrating flexibility and resourcefulness in adjusting schedules and priorities accordingly.
  • Operated power equipment to move materials and promote job efficiency.
  • Gathered waste and trash from job sites for placement in refuse containers to keep job sites clean and organized.
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.

Construction Worker/ Foreman

Steel Hawk
10.2022 - 04.2024
  • Worked as a roustabout hand and an insulation hand while gradually progressing to foreman in October of 2023.
  • Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
  • Maintained clean and organized job sites, contributing to a safe working environment for all employees.
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.
  • Gathered and disposed of worksite debris to remove safety hazards.
  • Worked with more knowledgeable professionals to grow understanding of principles and construction standards.
  • Brought materials and tools from trucks and storage facilities to work site locations and organized for expected needs.
  • Completed construction projects on time by adhering to strict deadlines and prioritizing tasks appropriately.
  • Gathered waste and trash from job sites for placement in refuse containers to keep job sites clean and organized.
  • Operated power equipment to move materials and promote job efficiency.
  • Demonstrated safe and proper operation of equipment and tools to prevent harm to team members.
  • Assisted with successful, time-sensitive renovations of various structures.
  • Adapted quickly to changing project requirements, demonstrating flexibility and resourcefulness in adjusting schedules and priorities accordingly.
  • Exhibited exceptional problem-solving abilities under pressure by employing critical thinking skills to overcome complex challenges on job sites.
  • Operated heavy machinery efficiently, ensuring timely progress on construction projects while minimizing risk of accidents or damage.
  • Measured dimensions of finished pieces for conformance to specifications.
  • Enhanced project efficiency by coordinating with team members and managing resources effectively.
  • Reduced material waste by accurately calculating requirements and optimizing usage throughout the project lifecycle.
  • Contributed to a positive work culture by fostering teamwork among staff through open communication channels, which led to higher overall productivity levels during projects.
  • Improved client satisfaction by delivering high-quality workmanship consistently, following up on feedback, and addressing concerns promptly.
  • Consistently met or exceeded building codes and regulations, resulting in successful inspections upon project completion.
  • Increased safety awareness through conducting regular training sessions for staff and implementing best practices on the job site.
  • Streamlined communication between team members, leading to increased collaboration and problem-solving capabilities.
  • Demonstrated a strong commitment to environmental sustainability through proper waste disposal measures, recycling initiatives, and eco-friendly construction practices when possible.
  • Developed strong relationships with suppliers, negotiating favorable pricing terms that contributed to overall project savings without sacrificing quality materials or service levels.
  • Mentored junior team members, providing guidance on construction methods and techniques to improve their skillsets over time.
  • Assisted in the preparation of accurate project bids by providing detailed estimates for labor, materials, and equipment costs based on historical data and industry benchmarks.
  • Assisted in budget management by monitoring expenses and identifying cost-saving opportunities without compromising quality or safety standards.
  • Used variety of hand and power tools to complete tasks.
  • Cleaned and maintained tools, equipment and worksites.
  • Loaded and unloaded materials onto trucks and trailers.
  • Loaded and unloaded materials and equipment onto and off construction sites.
  • Followed instructions and safety protocols to prevent accidents and injuries.
  • Managed safe and efficient use of tools and equipment on construction sites.
  • Followed instructions and safety protocols while operating machinery and equipment.
  • Moved and cleared debris from work sites to dispose of in designated areas.
  • Inspected tools and equipment to maintain safety and efficiency.
  • Operated forklifts and boom lifts to complete various tasks.
  • Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
  • Maintained a safe working environment through adherence to safety protocols and regular site inspections.
  • Ensured timely completion of projects with effective time management and prioritization of tasks.
  • Checked equipment to determine if maintenance was required.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Addressed issues proactively, resolving problems quickly to minimize delays in project timelines.
  • Enhanced team productivity by providing clear direction, setting expectations, and offering constructive feedback.
  • Conducted thorough quality control checks to ensure high standards of workmanship across all projects.
  • Interacted with employees to demonstrate high standards and mitigate issues effectively.
  • Evaluated incoming materials for quality and amounts ordered.
  • Developed strong relationships with clients, subcontractors, and suppliers, fostering open communication channels for smooth project execution.
  • Adapted workflows in response to changing environmental conditions or unexpected challenges encountered during construction activities.
  • Reviewed project details to specify correct materials and equipment for job sites.
  • Addressed issues with employees and customers to manage healthy conflict resolutions.
  • Handled issues with relative ease by implementing best practices and applying critical thinking skills to find best solutions.
  • Established clear priorities and production quality standards.
  • Monitored usage of supplies and materials to establish cost effective operations.
  • Collaborated with project managers in planning stages, advising on schedule adjustments and potential obstacles.
  • Monitored progress against established benchmarks, adjusting strategies as necessary to meet targets consistently.
  • Conducted monthly meetings with employees to discuss safety issues, status and development.
  • Raised overall crew proficiency with ongoing skill development initiatives targeting areas identified for improvement.
  • Provided comprehensive training for new employees, ensuring their rapid integration into the team dynamic.
  • Successfully mitigated risks associated with complex projects by conducting thorough risk assessments and implementing appropriate contingency plans.
  • Managed equipment maintenance schedules to minimize downtime due to mechanical failure or repairs.
  • Verified completed projects met approved time, quality, and cost estimates.
  • Reworked positions and workflow based on individual abilities and production targets.
  • Implemented efficient work processes to boost overall productivity while reducing costs.
  • Championed company values through consistent modeling of ethical behavior and adherence to corporate policies.
  • Scheduled job assignments for staff to monitor progress and performance.
  • Developed and implemented new procedures to increase productivity and constructiveness.
  • Devised and implemented safety protocols to reduce risks on construction and extraction sites.
  • Administered disciplinary actions to workers violating safety regulations and company policies.
  • Optimized resource utilization for cost savings, carefully monitoring material usage and labor allocations.
  • Assisted in the recruitment process for new team members, selecting candidates who demonstrated aptitude for success within the organization.
  • Improved project efficiency by implementing streamlined scheduling and resource allocation processes.
  • Continuously assessed performance metrics against industry benchmarks to identify opportunities for growth or improvement.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Inspected equipment and tools used for safe operation.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Directed projects according to schedule and quality demands.
  • Provided feedback to workers on job performance and safety procedures.
  • Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.
  • Prepared and submitted reports on job progress and safety conditions to upper management.
  • Created and implemented plans to maximize efficiency of workers.
  • Supported construction and extraction workers to facilitate timely completion of projects.
  • Established and enforced safety regulations, procedures and standards for construction and extraction workers.
  • Evaluated and updated safety protocols to reduce risks on construction and extraction sites.
  • Investigated and reported on accidents, injuries and near-miss incidents.
  • Supervised training of new construction and extraction workers on safety practices and procedures.

Construction Worker

Restek Inc.
07.2022 - 10.2022


  • Assisted in the construction and maintenance of concrete structures (car garages, bridges, sidewalks, commercial buildings, etc.)
  • Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
  • Maintained clean and organized job sites, contributing to a safe working environment for all employees.
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.
  • Brought materials and tools from trucks and storage facilities to work site locations and organized for expected needs.
  • Worked with more knowledgeable professionals to grow understanding of principles and construction standards.
  • Gathered and disposed of worksite debris to remove safety hazards.
  • Helped with erecting scaffolding and ladders.
  • Inspected tools and equipment to maintain safety and efficiency.
  • Mixed and poured concrete for variety of projects.
  • Followed instructions and safety protocols while operating machinery and equipment.
  • Managed safe and efficient use of tools and equipment on construction sites.
  • Followed instructions and safety protocols to prevent accidents and injuries.
  • Used variety of hand and power tools to complete tasks.
  • Gathered waste and trash from job sites for placement in refuse containers to keep job sites clean and organized.
  • Completed construction projects on time by adhering to strict deadlines and prioritizing tasks appropriately.
  • Operated power equipment to move materials and promote job efficiency.
  • Demonstrated safe and proper operation of equipment and tools to prevent harm to team members.
  • Assisted with successful, time-sensitive renovations of various structures.
  • Adapted quickly to changing project requirements, demonstrating flexibility and resourcefulness in adjusting schedules and priorities accordingly.
  • Exhibited exceptional problem-solving abilities under pressure by employing critical thinking skills to overcome complex challenges on job sites.
  • Measured dimensions of finished pieces for conformance to specifications.
  • Collaborated with architects and engineers to ensure accurate implementation of design plans while maintaining structural integrity.
  • Cleaned and maintained tools, equipment and worksites.
  • Loaded and unloaded materials onto trucks and trailers.
  • Loaded and unloaded materials and equipment onto and off construction sites.
  • Provided labor support to carpenters, masons and other skilled trades.
  • Moved and cleared debris from work sites to dispose of in designated areas.

Construction Assistant

Espino’s Construction
10.2020 - 06.2022
  • Assisted in completing projects such as porches, gazebos, decks, as well as remodeling/ additions to homes.
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Gathered and disposed of worksite debris to remove safety hazards.
  • Utilized construction tools and machinery to effectively complete job site projects.
  • Followed orders closely to help prepare for jobs, ready sites, complete assignments and clean up work areas at completion.
  • Maintained organized job sites, contributing to enhanced worker productivity and faster completion times.
  • Distributed supplies to skilled workers to maintain job site productivity.
  • Enhanced project efficiency by streamlining communication between construction teams and clients.
  • Identified and fixed issues during phases of production.
  • Interacted daily with various project managers, subcontractors, and municipal inspectors to complete construction projects.
  • Boosted team efficiency and project requirements by correctly operating site equipment.
  • Ensured compliance with all relevant regulations and codes, facilitating smooth inspections and approvals from local authorities.
  • Studied plans for each job to gain understanding of materials, tools and work required.
  • Increased client satisfaction by providing timely updates on project progress and addressing concerns promptly.
  • Monitored inventory levels of critical supplies, ensuring timely reordering to avoid work stoppages.
  • Established positive relationships with clients through regular communication and attentive service, leading to repeat business opportunities.
  • Assisted in performing quality control checks on completed work, ensuring that projects met or exceeded clients'' expectations and industry standards.
  • Adhered to all reporting requirements for job activities, safety issues and on-site incidents.
  • Kept meticulous records of daily job site activities which contributed towards efficient documentation for future reference purposes.
  • Reduced construction time for large-scale projects by coordinating materials delivery and equipment usage efficiently.
  • Implemented new organizational systems for tools and equipment storage that reduced time spent searching for needed items.
  • Assisted in training new construction assistants, fostering a strong team environment for maximum productivity.
  • Contributed to the successful completion of complex projects by assisting with various aspects of construction, such as framing, drywall installation, and electrical work.
  • Collaborated with architects to ensure accuracy of blueprints, minimizing costly revisions during the building phase.
  • Assisted in developing comprehensive safety protocols, resulting in a decrease in on-site accidents.
  • Supported project managers in preparing detailed budget estimates, leading to more accurate financial planning for clients.
  • Coordinated subcontractor schedules to minimize delays and keep projects running smoothly.
  • Assisted in resolving disputes between team members or subcontractors quickly and professionally, maintaining a harmonious working environment.
  • Followed safety protocols on job sites.
  • Operated variety of power tools and hand tools.
  • Removed debris and waste from job sites.
  • Followed instructions from construction project managers and supervisors.
  • Performed demolition work on existing structures.
  • Unloaded and stored construction materials.
  • Maintained tools and equipment in good working condition.
  • Painted walls, ceilings and other surfaces.
  • Set up ladders and other access equipment.
  • Assisted with plastering, tiling and carpentry.
  • Cleared work sites of hazardous items.
  • Mixed mortar and concrete.
  • Dug trenches and backfill holes to prepare for construction site.
  • Tested construction equipment to verify working condition.
  • Maintained knowledge of safety practices for removing hazards from working sites.
  • Performed roofing installations.
  • Dismantled constructing scaffolding, bracing and other temporary structures for construction sites.
  • Erected scaffolding, frames and formwork.

Construction Worker

Patriot Aviation
04.2020 - 09.2020
  • Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
  • Maintained clean and organized job sites, contributing to a safe working environment for all employees.
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.
  • Gathered and disposed of worksite debris to remove safety hazards.
  • Worked with more knowledgeable professionals to grow understanding of principles and construction standards.
  • Brought materials and tools from trucks and storage facilities to work site locations and organized for expected needs.
  • Completed construction projects on time by adhering to strict deadlines and prioritizing tasks appropriately.
  • Assisted with basic carpentry work such as installing wooden floors and crown molding.
  • Gathered waste and trash from job sites for placement in refuse containers to keep job sites clean and organized.
  • Demonstrated safe and proper operation of equipment and tools to prevent harm to team members.
  • Assisted with successful, time-sensitive renovations of various structures.
  • Adapted quickly to changing project requirements, demonstrating flexibility and resourcefulness in adjusting schedules and priorities accordingly.
  • Exhibited exceptional problem-solving abilities under pressure by employing critical thinking skills to overcome complex challenges on job sites.
  • Operated heavy machinery efficiently, ensuring timely progress on construction projects while minimizing risk of accidents or damage.
  • Measured dimensions of finished pieces for conformance to specifications.
  • Reduced material waste by accurately calculating requirements and optimizing usage throughout the project lifecycle.
  • Enhanced project efficiency by coordinating with team members and managing resources effectively.
  • Contributed to a positive work culture by fostering teamwork among staff through open communication channels, which led to higher overall productivity levels during projects.
  • Installed new structures, updated systems and replaced worn components to bring buildings up to current codes.
  • Improved client satisfaction by delivering high-quality workmanship consistently, following up on feedback, and addressing concerns promptly.
  • Participated in continuous learning initiatives to enhance professional development within the industry, applying new techniques when necessary for optimal results on job sites.
  • Consistently met or exceeded building codes and regulations, resulting in successful inspections upon project completion.
  • Increased safety awareness through conducting regular training sessions for staff and implementing best practices on the job site.
  • Streamlined communication between team members, leading to increased collaboration and problem-solving capabilities.
  • Used variety of hand and power tools to complete tasks.
  • Cleaned and maintained tools, equipment and worksites.
  • Loaded and unloaded materials onto trucks and trailers.
  • Loaded and unloaded materials and equipment onto and off construction sites.
  • Followed instructions and safety protocols to prevent accidents and injuries.
  • Installed drywall, siding and other structural components.
  • Managed safe and efficient use of tools and equipment on construction sites.
  • Followed instructions and safety protocols while operating machinery and equipment.
  • Mixed and poured concrete for variety of projects.
  • Provided labor support to carpenters, masons and other skilled trades.
  • Moved and cleared debris from work sites to dispose of in designated areas.
  • Inspected tools and equipment to maintain safety and efficiency.
  • Finished surfaces of woodwork or wallboard in houses and buildings with paneling, paint and hand tools.

Timeline

Construction Worker

Dakota Chemical
04.2024 - Current

Construction Worker/ Foreman

Steel Hawk
10.2022 - 04.2024

Construction Worker

Restek Inc.
07.2022 - 10.2022

Construction Assistant

Espino’s Construction
10.2020 - 06.2022

Construction Worker

Patriot Aviation
04.2020 - 09.2020
Rodolfo Espino