Professional Summary
Overview
Work History
Education
Skills
Languages
Timeline

Rogelio Gonzalez

Kear Civil
Penitas
2
Languages
8
years of professional experience

Experienced Pipe Foreman specializing in overseeing complex pipeline projects. Skilled in blueprint analysis, system testing, critical thinking and multitasking. Contributions to safety protocol adherence and quality inspections have consistently enhanced operational efficiency and ensured timely project completion.

Work History

Pipe Foreman

2 Years
Kear Civil | 04.2024 - 04.2026
  • Supervised pipe installation and pipe teams to ensure adherence to safety protocols.
  • Coordinated scheduling and resource allocation for multiple pipeline projects simultaneously.
  • Conducted quality inspections to guarantee compliance with industry standards and regulations.
  • Trained new employees on equipment operation and best practices in pipeline construction.
  • Generate production reports(weld logs,Rt film,tie in report,pneumatic testing,hydro testing,. coating painting.)
  • Collaborated with superintendent and project managers to interpret blueprints and technical specifications for installation of piping and setting filter vessels in fuel farm areas.
  • Supervised layout, assembly and installation of various sizes and types of piping and filter vessels
  • over saw excavation of trenches for piping in airport tarmac area.
  • oversaw and participated in pipe pre fabrication,pipe welding ,lowering-in,tie-ins,x-ray, coating,nace inpections ,hydro/pneumatic testing, backfill.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Documented construction and extraction workers' hours, wages and other pertinent information.
  • assisted in shutdowns of jet-fuel operating systems as to complete hot tie-ins ,and plidco sleeve lines.
  • coordinated with multiple subcontractors on project site to ensure steady flow of operations.

Foreman

2 Years 11 Months
Warbonnet Pipe Line Services | 04.2021 - 03.2024
  • Supervised crew members, fostering teamwork and adherence to safety protocols.
  • Coordinated daily operations to ensure timely completion of pipeline construction projects.
  • Implemented process improvements that enhanced operational efficiency and reduced downtime.
  • Conducted regular inspections to maintain quality standards and compliance with regulations.
  • Collaborated with superintendent to align resources with project timelines and deliverables.
  • Maintained a safe working environment through adherence to safety protocols and regular site inspections.
  • Addressed issues proactively, resolving problems quickly to minimize delays in project timelines.
  • Developed strong relationships with clients, subcontractors, and suppliers, fostering open communication channels for smooth project execution.
  • Boosted operational efficiency, redesigning processes to eliminate bottlenecks and streamline tasks.
  • Achieved deadlines consistently, planning resources effectively and adjusting priorities as needed.
  • over saw all tasks onsitete incuding ,opening (row),excavating ,stringing pipe,welding mainline,prefab welding,coating pipes,holiday testing,lowering pipe,tieins,pneumatic testing,hydro testing.

Strawboss/Foreman

2 Years 7 Months
Forza Pipeline Services | 08.2018 - 03.2021
  • Supervised daily operations, ensuring adherence to safety protocols and project timelines.
  • Coordinated workflows among crews, optimizing efficiency and resource allocation.
  • Coordinated workflows among crew, optimizing efficiency and resource allocation.
  • oversee labor work/manpower
  • Enhanced team productivity by providing clear direction, setting expectations, and offering constructive feedback
  • Oversaw labor intensive work like stringing pipe ,bolt up,tie-ins,pipe gang,rustabout activities,picking up skids ,opening/closing fence gaps.
  • heavy manual labor
  • handled all piping on sites,coordinating all use an movement of pipe

Education

High School Diploma

La Joya Senior High School | La Joya, TX

Skills

Pipe installation
Blueprint analysis
Pneumatic and hydro testing
Excavation safety
Site coordination
Pipe fitting
poly fusing pipe
stringing pipe
shawcore flex pipe crimping
stringing
flex steel crimping
stringing
Project Coordination
pipe threading/pipe handling
Rigging and bolting
Isometric interpretation
Hand and power tool operation
Tool Safety Management
Professionalism

Languages

Spanish
Native or Bilingual
English
Native or Bilingual

Timeline

Pipe Foreman

Kear Civil
04.2024 - 04.2026Read More

Foreman

Warbonnet Pipe Line Services
04.2021 - 03.2024Read More

Strawboss/Foreman

Forza Pipeline Services
08.2018 - 03.2021Read More

La Joya Senior High School

High School Diploma
Read More
Rogelio Gonzalez