Foreman
Concordia Wireless/ Triad Associates
01.2021 - 03.2022
- Oversaw a crew of 2-4 people
- Read and followed construction and electrical drawings
- Installed Generac and Kohler generators on cellular sites
- Ran conduit from the meter to the PPC, to the transfer switch, and then to the generator
- Pulled wire to all electrical equipment and made connections
- Construct generator pads, by assembling a form, tying rebar and pouring concrete
- Mounting generators to the pad with the use of a lull or boom truck
- Verified that all electrical connections were made correctly and torxed per specification
- Build H-frames by setting posts in concrete, attaching unistrut and then mounting the necessary equipment